CN201265368Y - Integral Y-shaped connector - Google Patents

Integral Y-shaped connector Download PDF

Info

Publication number
CN201265368Y
CN201265368Y CNU2008201097644U CN200820109764U CN201265368Y CN 201265368 Y CN201265368 Y CN 201265368Y CN U2008201097644 U CNU2008201097644 U CN U2008201097644U CN 200820109764 U CN200820109764 U CN 200820109764U CN 201265368 Y CN201265368 Y CN 201265368Y
Authority
CN
China
Prior art keywords
passage
monolithic
joint
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201097644U
Other languages
Chinese (zh)
Inventor
邵明仁
李贵川
郭树彬
张晓诚
李刚
王春鹏
楚华杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Energy Technology and Services Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC Energy Technology and Services Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC Energy Technology and Services Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CNU2008201097644U priority Critical patent/CN201265368Y/en
Application granted granted Critical
Publication of CN201265368Y publication Critical patent/CN201265368Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Measuring Fluid Pressure (AREA)

Abstract

The utility model relates to an integrated Y junction which is characterized by comprising an integrated Y junction body made of metal material; a blanking plug locating step is arranged inside the junction body; and the junction body is also internally provided with a lower main pipe channel, a lower side pipe channel, a cable channel and a pressure meter cable channel. The utility model has the advantages that a plurality of functions are integrated into a whole, when other operations are needed in operation, only the junction is used for directly performing various operations without mounting other special tools, thus the connection of the used tools can be omitted, the operation routines is simplified, the production efficiency is improved, and the production cost can be also reduced.

Description

Monolithic Y joint
Technical field
The utility model belongs to the oilfield well completion technical field, particularly relates to a kind of monolithic Y joint.
Background technology
In present known completion practice, for the electric submersible pumping flow string, in order to carry out the separate zone production operation, must in tubing string, be lowered to the Y joint, traditional Y joint upper outlet connects flow string, and following side pipe connects ball-and-seat and electric pump unit, and the following person in charge connects the test side pipe.The last seating nipple of test side pipe generally all with the blanking plug of unidirectional (upwards opening), pressurizes to the liquid of pump lifting and oil pipe and to play ponding when setting the electric pump packer when completion is constructed, and can not cause and pump the liquid reflux cycle; When being lowered to the Y joint, must be lowered to and be shaped on the seating nipple that blanking plug is located step in it, can cause the multi-link excessively of instrument like this, and increase operating risk.
Summary of the invention
The utility model for solve the technical problem that exists in the known technology provide a kind of be used for the oilfield well completion work production simple in structure, be convenient to operate, safe and reliable and monolithic Y joint with multiple function.
The technical scheme that the utility model is taked for the technical problem that exists in the solution known technology is: monolithic Y joint, it is characterized in that: comprise the monolithic Y joint body of making by metal material, be shaped on a blanking plug in joint body inside and be located step, in joint body, also be shaped on and be responsible for passage, downside tube passage, cable passage and pressure gauge cable passage down.
The utility model can also adopt following technical scheme:
Described monolithic Y joint body is all made one by metal material, guarantees mechanical strength and pressure integrity.
The described passage internal diameter of being responsible for down is not for waiting gauge structure.
Advantage and the good effect that the utlity model has are: because the utility model adopts technique scheme, promptly in monolithic Y joint body, be provided with blanking plug and be located step, be responsible for outside passage and the downside tube passage down, also be shaped on cable passage and pressure gauge cable passage.The utility model gathers multi-function in integral whole, when needing in the operation to carry out other operation, need not to install other special tool realizes again, can directly carry out various operations by this joint, not only can save the connection of the instrument that is lowered to like this, simplify operation procedure, improved production efficiency, also can reduce production costs simultaneously.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is A-A sectional view of Fig. 1;
Fig. 3 is B-B sectional view of Fig. 2.
Among the figure: 1, be responsible for passage down; 2, downside tube passage; 3, pressure gauge cable passage; 4, joint body; 5, blanking plug is located step; 6, cable passage.
The specific embodiment
For further understanding summary of the invention of the present utility model, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows:
See also Fig. 1-Fig. 3, monolithic Y joint, comprise the monolithic Y joint body of making by metal material 4, be shaped on a blanking plug in joint body 4 inside and be located step 5, in joint body, also be shaped on and be responsible for passage 1 and downside tube passage 2 down, the described internal diameter of being responsible for down passage 1 is for waiting gauge structure, main cause under directly be shaped on blanking plug in person in charge's passage and be located step 5.For protecting cable and carrying out the bottom pressure monitoring, in joint body, also be shaped on cable passage 6 and pressure gauge cable passage 3.
Operating principle of the present utility model is: the carrier that the utility model uses is monolithic Y joint, and its upper outlet connects flow string, and downside tube passage 2 connects the electric submersible pump unit, and following person in charge's passage 1 connects the test side pipe.When being lowered to monolithic Y joint, electric submersible pump electric pump cable is connected to well head by cable passage.When needs used ground directly-reading formula electronic pressure gauge to carry out formation pressure monitoring, the pressure gauge cable can be by the pressure gauge passage continuously to well head.

Claims (3)

1. monolithic Y joint, it is characterized in that: comprise the monolithic Y joint body of making by metal material, be shaped on a blanking plug in joint body inside and be located step, in joint body, also be shaped on and be responsible for passage, downside tube passage, cable passage and pressure gauge cable passage down.
2. monolithic Y joint according to claim 1 is characterized in that: described monolithic Y joint body is all made one by metal material.
3. monolithic Y joint according to claim 1 is characterized in that: the described passage internal diameter of being responsible for down is not for waiting gauge structure.
CNU2008201097644U 2008-08-11 2008-08-11 Integral Y-shaped connector Expired - Fee Related CN201265368Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201097644U CN201265368Y (en) 2008-08-11 2008-08-11 Integral Y-shaped connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201097644U CN201265368Y (en) 2008-08-11 2008-08-11 Integral Y-shaped connector

Publications (1)

Publication Number Publication Date
CN201265368Y true CN201265368Y (en) 2009-07-01

Family

ID=40831736

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201097644U Expired - Fee Related CN201265368Y (en) 2008-08-11 2008-08-11 Integral Y-shaped connector

Country Status (1)

Country Link
CN (1) CN201265368Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227968A (en) * 2020-11-13 2021-01-15 中国海洋石油集团有限公司 Y-joint for slim hole and layered oil production completion string
CN113356815A (en) * 2021-03-01 2021-09-07 中海油能源发展股份有限公司 Heat-insulation straight-hole injection-production Y joint and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227968A (en) * 2020-11-13 2021-01-15 中国海洋石油集团有限公司 Y-joint for slim hole and layered oil production completion string
CN113356815A (en) * 2021-03-01 2021-09-07 中海油能源发展股份有限公司 Heat-insulation straight-hole injection-production Y joint and use method thereof

Similar Documents

Publication Publication Date Title
CN101446281B (en) Drainage device for coal bed gas well electric submersible centrifugal pump
CN202466738U (en) Rubber plunger
CN202348248U (en) Porous concentric integrated continuous quantitative production allocator
CN201159064Y (en) Minor diameter expanding type washable well zonal injection packer
CN201265368Y (en) Integral Y-shaped connector
CN101949274A (en) Casing shut-in valve for cementing operation
CN202451097U (en) Differential motion hydraulic pressure booster for horizontal section of horizontal well
CN201074584Y (en) Down-hole oil pumping load-reducing tool
CN201474631U (en) Large-diameter guide shoe with variable guide port
CN201915930U (en) Tee joint special for thermal recovery
CN201025018Y (en) Once pipe pole using hierarchical acidification pressure crack technology
CN200946464Y (en) Rigid centralizer for straight well and directional well
CN214697800U (en) Hydraulic load-reducing oil pumping device
CN201144831Y (en) Coal bed gas well electric submersible centrifugal pump discharging and mining device
CN113445970A (en) Ground production increase auxiliary device of coal bed gas single well tolerance
CN2321938Y (en) continuous sand washing device
CN203516026U (en) Bridge-crossing type inverted pull-down pump
CN203230386U (en) Oil drainage device with outer sliding sleeve
CN201071702Y (en) Self-sealing packer
CN2251636Y (en) Separate zone production synchronous oil pump
CN213902973U (en) Single-hole annular multi-layer micro-washing monitoring well
CN201620812U (en) Novel anchoring insertion seal
CN2561915Y (en) Sand washover device as sucking operation
CN202091156U (en) Sand blocking-proof rod-type oil-well pump
CN218467601U (en) Oil pumping bailing barrel with pressure relief function

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090701

Termination date: 20160811