CN201265366Y - Connection structure for composite material drill pipe body and steel connector - Google Patents

Connection structure for composite material drill pipe body and steel connector Download PDF

Info

Publication number
CN201265366Y
CN201265366Y CNU200820056720XU CN200820056720U CN201265366Y CN 201265366 Y CN201265366 Y CN 201265366Y CN U200820056720X U CNU200820056720X U CN U200820056720XU CN 200820056720 U CN200820056720 U CN 200820056720U CN 201265366 Y CN201265366 Y CN 201265366Y
Authority
CN
China
Prior art keywords
composite material
steel
pipe body
drill pipe
connecting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU200820056720XU
Other languages
Chinese (zh)
Inventor
袁鹏斌
余荣华
欧阳志英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI HAILONG PETROLEUM PIPE MATERIAL INSTITUTE
Original Assignee
SHANGHAI HAILONG PETROLEUM PIPE MATERIAL INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HAILONG PETROLEUM PIPE MATERIAL INSTITUTE filed Critical SHANGHAI HAILONG PETROLEUM PIPE MATERIAL INSTITUTE
Priority to CNU200820056720XU priority Critical patent/CN201265366Y/en
Application granted granted Critical
Publication of CN201265366Y publication Critical patent/CN201265366Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a connecting structure of a drill pipe body made of composite material and a steel connector, in particular to a connecting structure of a drill pipe body and a connector which are made of two materials with larger performance difference. A conical connecting surface is arranged outside the connecting end of the pipe body of the steel connector, and a conical connecting surface corresponding to the conical connecting surface of the steel connector is arranged inside the connecting end of the pipe body of the composite material; the two conical connecting surfaces are connected by a high-strength adhesive layer; and a stainless steel combined pin passes through a through hole on the pipe body made of the composite material and a combined groove on the steel connector to connect the through hole and the steel connector. The utility model mainly solves the technical problem that parts made of two materials can not adopt a welding way. The connecting structure not only solves the connecting problem, but also has very high connecting strength and can satisfy the service performance requirement of a drill pipe.

Description

Composite material drill pipe body and steel joint connecting structure
Technical field
The drill pipe body that the utility model relates between two kinds of materials that a kind of composite material drill pipe body and steel joint connecting structure, especially performance differ greatly is connected with joint.
Background technology
At present, known steel drilling rod is that steel body and steel joint form by friction welding.Body and joint material all are low-alloy steel, and both have good friction welding performance.The performance of welding back weld seam can reach the instructions for use of steel drilling rod.If drill pipe body and joint are not with a kind of material, when especially a kind of material was nonmetals, both can not adopt the method for welding that drill pipe body and joint are coupled together.Thereby there is a connectivity problem of body and joint.
The utility model content
The purpose of this utility model is to provide a kind of composite material drill pipe body and steel joint connecting structure, the parts that mainly solve two kinds of materials can not adopt the technical problem of welding manner connection, this syndeton can not only solve connectivity problem, and have very high bonding strength, can reach the functional performance requirement of drilling rod.
For solving the problems of the technologies described above, technical scheme of the present invention is:
A kind of composite material drill pipe body and steel joint connecting structure is characterized in that: the body link of steel joint is provided with the taper connection face outward, is provided with the taper connection face corresponding with the taper connection face of steel joint in the link pipe of composite material body; Connect by the high strength bonding layer between the two taper joint faces; Having stainless steel is connected the two with engagement groove on the steel joint in conjunction with the through hole that pin passes on the composite material body.
Described composite material drill pipe body and steel joint connecting structure is characterized in that: the taper connection face bottom of this composite material body has in conjunction with step.
Described composite material drill pipe body and steel joint connecting structure is characterized in that: the range of taper of two taper joint faces is 5 ° to 40 °.
Described composite material drill pipe body and steel joint connecting structure is characterized in that: stainless steel is 3 groups to 6 groups, 2 to 4 row in conjunction with pin, amounts to 6 to 24 in conjunction with pin, is 120 °, 90 °, 72 °, 60 ° in conjunction with the locus angle between the pin.
Described composite material drill pipe body and steel joint connecting structure is characterized in that: the external steel sleeve that is provided with of this composite material tube, steel joint and steel sleeve are by being welded to connect.
Described composite material drill pipe body and steel joint connecting structure is characterized in that: be provided with the high strength bonding layer between this steel sleeve inwall and the composite material tube wall.
Described composite material drill pipe body and steel joint connecting structure is characterized in that: have the high-abrasive material liner in this composite material body.
Described composite material drill pipe body and steel joint connecting structure is characterized in that: the external wear-resistant material layer that is provided with of this composite material tube.
Compared with prior art, the beneficial effects of the utility model are:
1, the utility model is in connection, jumper steel joint link adopts the identical structure (range of taper is from 5 ° to 40 °) of taper ratio with the composite material body, both joint faces adopt high strength bond layer bonding, use 3 groups to 6 groups (being 120 °, 90 °, 72 °, 60 ° each other), 2 to 4 row again, 6 to 24 stainless steels connect in conjunction with finger setting.The outside is with steel sleeve parcel, is connected with the method for welding between steel sleeve and the steel joint.Steel sleeve has prevented that stainless steel from losing in conjunction with the loosening of pin, prevents the contact wear and the damage of joint composite material and sleeve pipe and tong.Guaranteed on the drilling rod, during shackle, joint can bear the effect of tong.
2, of the present utility modelly can solve the steel joint of drilling rod and the connectivity problem between the composite material body, and easy to process, simple in structure.
Description of drawings
Fig. 1 is the structural representation of embodiment 1 of the present utility model.
Fig. 2 is the structural representation of embodiment 2 of the present utility model.
Fig. 3 is the A-A sectional view of Fig. 1.
Among the figure:
1. drilling rod steel male joint, 2. weld seam, 3. steel sleeve, 4. high strength bond layer, 5. wear-resistant material layer, 6. composite material body, 7. high-abrasive material liner, 8. in conjunction with step, 9. stainless steel is in conjunction with pin, 10. drilling rod steel female joint.
The specific embodiment
As Fig. 1,3, they are structural representations of the utility model embodiment 1.As shown in the figure: drilling rod steel male joint 1 has identical tapering with composite material body 6 joint faces, is connected and adopts high strength bond layer 4 bonding to be connected in conjunction with pin 9 positioning combination with stainless steel.Wherein: the range of taper of two taper joint faces is 5 ° to 40 °, stainless steel in conjunction with pin be 3 groups to 6 groups, 2 to 4 row, 6 to 24 in conjunction with pin, in conjunction with the locus angle between the pin be 120 °, 90 °, 72 °, 60 ° (among Fig. 3 stainless steel in conjunction with pin 9 be 8 of 4 group of 2 row in conjunction with pin, four groups is 90 ° in conjunction with the locus angle between the pin).Stainless steel is in conjunction with pin 9 not break-through of hole on the jumper steel joint 1, and the stainless steel on the composite material body 6 is a through hole in conjunction with pin 9 holes, and convenient so upward stainless steel is in conjunction with pin 9.Drilling rod steel male joint 1 and steel sleeve 3 are by being welded to connect.With the high-abrasive material liner 7 of high-abrasive material as drilling rod, body uses high-abrasive material 5 outward in the composite material drill pipe body.The taper connection face bottom of this composite material body 6 has in conjunction with step 8.
Fig. 2 is the structural representation of the utility model embodiment 2.Drilling rod steel male joint 1 is identical with structure with composite material body 6 catenation principles among the catenation principle of drilling rod steel female joint 10 and composite material body 6 and structure and the embodiment 1.
Being preferred embodiment of the present utility model only in sum, is not to be used for limiting practical range of the present utility model.Be that all equivalences of doing according to the content of the utility model claim change and modification, all should be technology category of the present utility model.

Claims (8)

1, a kind of composite material drill pipe body and steel joint connecting structure, it is characterized in that: the body link of steel joint (1,10) is provided with the taper connection face outward, is provided with the corresponding taper connection face of taper connection face with steel joint (1,10) in the link pipe of composite material body (6); Connect by high strength bonding layer (4) between the two taper joint faces; Having stainless steel is connected the two with engagement groove on the steel joint (1,10) in conjunction with the through hole that pin (9) passes on the composite material body (6).
2, composite material drill pipe body according to claim 1 and steel joint connecting structure is characterized in that: the taper connection face bottom of this composite material body (6) has in conjunction with step (8).
3, composite material drill pipe body according to claim 1 and steel joint connecting structure is characterized in that: the range of taper of two taper joint faces is 5 ° to 40 °.
4, composite material drill pipe body according to claim 1 and steel joint connecting structure, it is characterized in that: stainless steel is 3 groups to 6 groups, 2 to 4 row in conjunction with pin, amounting to 6 to 24 in conjunction with pin, is 120 °, 90 °, 72 °, 60 ° in conjunction with the locus angle between the pin.
5, composite material drill pipe body according to claim 1 and steel joint connecting structure is characterized in that: the outer steel sleeve (3) that is provided with of this composite material body (6), steel joint (1,10) and steel sleeve (3) are by being welded to connect.
6, composite material drill pipe body according to claim 5 and steel joint connecting structure is characterized in that: be provided with high strength bonding layer (4) between this steel sleeve (3) inwall and composite material body (6) outer wall.
7, composite material drill pipe body according to claim 1 and steel joint connecting structure is characterized in that: have high-abrasive material liner (7) in this composite material body (6).
8, composite material drill pipe body according to claim 1 and steel joint connecting structure is characterized in that: the outer wear-resistant material layer (5) that is provided with of this composite material body (6).
CNU200820056720XU 2008-03-28 2008-03-28 Connection structure for composite material drill pipe body and steel connector Expired - Lifetime CN201265366Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820056720XU CN201265366Y (en) 2008-03-28 2008-03-28 Connection structure for composite material drill pipe body and steel connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820056720XU CN201265366Y (en) 2008-03-28 2008-03-28 Connection structure for composite material drill pipe body and steel connector

Publications (1)

Publication Number Publication Date
CN201265366Y true CN201265366Y (en) 2009-07-01

Family

ID=40831734

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820056720XU Expired - Lifetime CN201265366Y (en) 2008-03-28 2008-03-28 Connection structure for composite material drill pipe body and steel connector

Country Status (1)

Country Link
CN (1) CN201265366Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10036213B2 (en) 2014-12-05 2018-07-31 China National Petroleum Corporation Connection structure between pipe body and joint of aluminum alloy drill pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10036213B2 (en) 2014-12-05 2018-07-31 China National Petroleum Corporation Connection structure between pipe body and joint of aluminum alloy drill pipe

Similar Documents

Publication Publication Date Title
CN201705226U (en) Integral type double-shoulder sulfur resistant drill rod
CN201507731U (en) Oil casing threaded connection joint
CN202273618U (en) Reliable releasing running tool
CN201322148Y (en) High performance oil pipe hermetic seal threaded connection structure
CN201265366Y (en) Connection structure for composite material drill pipe body and steel connector
CN201013257Y (en) Oil pipe coupling
CN201322147Y (en) Connection structure for small-clearance collar and casing threads
CN201568662U (en) Threading connector with three torque shoulders
CN205955664U (en) Lead to water drilling rod connection structure
CN202081837U (en) Stress-resistant threaded connector with corrosive gas sealing sleeve
CN201992251U (en) Pipe joint connected by utilizing ultrasonic welding
CN201301671Y (en) Double-shoulder drill pipe joint
CN101899953A (en) Thread joint structure for high-performance oil casing
CN201574696U (en) Large-caliber fast screwing-up sleeve thread connecting structure
CN204082029U (en) A kind of oil bushing threaded connector of high torque resistant high leakproofness
CN203403833U (en) Trapezoidal thread connector with tangency point sealing structure
CN202164607U (en) Dual-pipe high-pressure jet-grouting ejector
CN202176273U (en) High-temperature high-pressure petroleum casing pipe thread connector
CN201083085Y (en) Drilling rod without welding down-the-hole drill
CN202064923U (en) Fracture manifold
CN201756919U (en) Threaded connection structure for operation oil pipe
CN201763267U (en) Anti-bending oil sleeve threaded connection structure
CN101864906A (en) Bending-resistant oil casing threaded connection structure
CN203531775U (en) Straight-thread connector with three torque shoulders
CN209621225U (en) A kind of colliery aluminium alloy drilling rod with high bonding strength

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: HAILONG PETROLEUM DRILLING TOOL (WUXI) CO., LTD.

Assignor: Shanghai Hailong Petroleum Pipe Material Institute

Contract fulfillment period: 2009.8.6 to 2014.4.30

Contract record no.: 2009320001486

Denomination of utility model: Connection structure for composite material drill pipe body and steel connector

Granted publication date: 20090701

License type: Exclusive license

Record date: 20090811

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.8.6 TO 2014.4.30; CHANGE OF CONTRACT

Name of requester: HAILONG PETROLEUM DRILLING TOOLS ( WUXI ) CO., LTD

Effective date: 20090811

CX01 Expiry of patent term

Granted publication date: 20090701

CX01 Expiry of patent term