CN201254965Y CNU2008201588595U CN200820158859U CN201254965Y CN 201254965 Y CN201254965 Y CN 201254965Y CN U2008201588595 U CNU2008201588595 U CN U2008201588595U CN 200820158859 U CN200820158859 U CN 200820158859U CN 201254965 Y CN201254965 Y CN 201254965Y
Authority
CN
China
Prior art keywords
pressure
water
main shaft
cylinder blanket
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201588595U
Other languages
Chinese (zh)
Inventor
熊君放
黄友汉
牛建东
张鑫
罗银燕
庄海华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN CONSTRUCTION ENGINEERING GROUP Corp
Original Assignee
HUNAN CONSTRUCTION ENGINEERING GROUP Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN CONSTRUCTION ENGINEERING GROUP Corp filed Critical HUNAN CONSTRUCTION ENGINEERING GROUP Corp
Priority to CNU2008201588595U priority Critical patent/CN201254965Y/en
Application granted granted Critical
Publication of CN201254965Y publication Critical patent/CN201254965Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a water guiding chamber structure of a two fluid grouting light rig, which comprises a cylindrical casing and a main shaft installed inside the cylindrical casing. The water chamber arranged at the middle part of the cylindrical casing is communicated with a high-pressure quick joint in the identical side with the water chamber; a hollow shaft provided with a water delivering channel is arranged at the lower section of the main shaft, and a plurality of radial guiding holes which are communicated with the water chamber and the water delivering channel are arranged at the upper part of the hollow shaft; pressure-bearing end covers are respectively installed at the upper end and the lower end of the cylindrical casing, and O-shaped sealing rings are installed between the pressure-bearing end covers and the main shaft; a plane bearing, a needle bearing and a V-shaped high-pressure sealing ring are installed between the main shaft in the inner side of each pressure-bearing end cover and the cylindrical casing in sequence from the pressure-bearing end cover to the water chamber. The water guiding chamber structure has the advantages that the water guiding chamber structure can be operated under high water pressure and low water pressure environments, and without water leakage, various grout materials can be injected, the structure is simple, the operation is convenient, and the problems of difficult pore-creating and difficult grouting after pore-creating in various complex stratums, running sand layers and dynamic streams.

Description

The water guide cell structure of two fluid grouting light rig
Technical field
The utility model relates to the two fluid grouting light rig, further is meant its water guide cell structure, and this structure can be that drill bit supplies water under high pressure or directly carry out the slip casting of different pressures behind drilling and forming hole by drilling rod.
Background technology
Two fluid grouting is a kind of slip casting new technology that has a extensive future at present.Mostly the facility of two fluid grouting are to utilize existing geological drilling rig pore-forming, and its drilling and forming hole and grouting process are separately.Still there is not complete two fluid grouting special equipment.In high water head or powder spun yarn stratum, behind the pore-forming again tube drawing etc. often cause the engineering failure.
The utility model content
The purpose of this utility model is, deficiency at the prior art existence, a kind of water guide cell structure of two fluid grouting light rig is provided, it can use under high and low pressure hydraulic pressure environment and percolating water phenomenon can not occur, can inject multiple slurry material, simple in structure, easy to use, can solve various bad grounds, drifting sand layer, the dynamic problem of difficult slip casting behind the difficult pore-forming of current, the pore-forming.
The technical solution of the utility model is, the water guide cell structure of described two fluid grouting light rig comprises cylinder blanket and is contained in this cylinder blanket and upper/lower terminal is positioned at main shaft outside the cylinder blanket, its design feature is to be provided with the high-voltage quick joint connection with cylinder blanket one side of hydroecium and this hydroecium in the middle part of the described cylinder blanket; The hypomere of described main shaft is the hollow shaft that is provided with water transport channel, and the top of this hollow shaft is provided with the radially pod apertures of a plurality of connection hydroeciums and water transport channel; The upper/lower terminal of described cylinder blanket is equipped with the pressure-bearing end cap that is screwed on this cylinder blanket respectively, and between described pressure-bearing end cap and the main shaft O RunddichtringO is housed; To hydroecium plane bearing, needle bearing, V-type high-pressure seal ring are housed successively between the main shaft of each pressure-bearing end cap inboard and the cylinder blanket and by the pressure-bearing end cap.
Below the utility model made further specify.
Referring to Fig. 1, the water guide cell structure of two fluid grouting light rig of the present utility model comprises cylinder blanket 7 and is contained in this cylinder blanket 7 and upper/lower terminal is positioned at main shaft 13 outside the cylinder blanket, its design feature is, described cylinder blanket 7 middle parts are provided with hydroecium 8 and this hydroecium 8 and are communicated with the high-voltage quick joint 9 of cylinder blanket 7 one sides; The hypomere of described main shaft 13 is the hollow shaft that is provided with water transport channel 11, and the top of this hollow shaft is provided with the radially pod apertures 10 of a plurality of connection hydroeciums 8 and water transport channel 11; The upper/lower terminal of described cylinder blanket 7 is equipped with respectively with screw 2 and is fixed on pressure-bearing end cap 1 on this cylinder blanket 7, and between described pressure-bearing end cap 1 and the main shaft 13 O RunddichtringO 3 is housed; To hydroecium 8 plane bearing 4, needle bearing 5, V-type high-pressure seal ring 6 are housed successively between the main shaft 13 of each pressure-bearing end cap 1 inboard and the cylinder blanket 7 and by pressure-bearing end cap 1.
During actual installation, the upper end of described main shaft connects with the two fluid grouting light rig with corresponding connector, and the lower end of main shaft connects with the upper end of corresponding connector with hollow drill.
During real work, high-pressure injection pump pumping water under high pressure enters 8 hydroeciums by high-voltage quick joint 9; Hydroecium 8 under high pressure conditions, promptly under water under high pressure (7-21MPa) situation, cylinder blanket 7 pressurizeds, hydroecium 8 internal pressures pass to V-shaped seal ring 6, these V-shaped seal ring 6 pressurizeds are passed to needle bearing 5 again; Needle bearing 5 is combined closely with main shaft 13, by the needle bearing running, main shaft 13 is gone slick.Needle bearing 5 outsides are provided with plane bearing 4, this plane bearing 4 further seals with the hydroecium that pressure-bearing end cap 1 and O RunddichtringO 3 are combined to form under the axial compression state, and keep main shaft 13 to rotate flexibly relative to cylinder blanket 7 when pressure-bearing end cap 1 pressurized, it is connection main shaft 13 with the location of pressure-bearing end cap 1 that plane bearing 4 mainly acts on, separate rotation.High-voltage quick joint 9 can be connected with the water source easily, the position of corresponding hydroecium 8 is provided with radially pod apertures 10 on the main shaft 13, it is connected with the center water transport channel 11 of hydroecium 8 and main shaft 13 respectively, when the two fluid grouting light rig rotates, water is sustainable supply ceaselessly, make the water ejection by hollow drill again, reach the purpose that wet type is crept into;
Show that through field trial it is flexible, reliable that the utility model uses, and do not need any complicated operations program.General perforating workman just can operate, and water system can adapt under the high and low hydraulic pressure situation to be used, and drainage do not occur running.When using this system works, the work plane air is fresh, and dust produces 135mg/m by original dry type perforating 3, be reduced to 5-8mg/m 3, reach provisions of the relevant regulations issued by the State standard.It is 2-20 hydraulic pressure that this side formula water supplying apparatus adapts to hydraulic pressure, and using stabilization time is 18 months.This device can realize that under the high pressure conditions, the rig smooth operation is crept into, and the maximum pressure that can bear reaches 21Mpa.
In the structure of the present utility model, go slick behind the described plane bearing pressurized; Rig when boring band clear water, directly slip casting behind the pore-forming is particularly suitable for can be used for existing building ground stabilization on the complicated soft stratums such as drifting sand layer, fill stratum, pattern foundation pit supporting structure drilling construction at soft stratum, delamination pour slurry when drifting sand layer creeps into.This is because after powder spun yarn layer creeps into whole hole, under when managing slip casting, sand can return to Grouting Pipe, cause the plugging of powder spun yarn, after adopting this water guide cell structure, can realize creeping into and not stop boring and slip casting is changed fast, improve drilling efficiency, and can realize that marginal not slurry limit puies forward kinds of processes such as pipe, layer and section slip casting; Be fit to various bad grounds, be particluarly suitable for slip casting in the excessive stratum of artesian head.This device efficiently solves drifting sand layer, the dynamic problem of difficult slip casting behind the difficult pore-forming of current, the pore-forming.By rig bit change more, it can also be applied in the boulder bed to advance in the construction with pipe bit.
As known from the above, the utility model is a kind of water guide cell structure of two fluid grouting light rig, it is high pressure resistant, can under high and low pressure hydraulic pressure environment, use and percolating water phenomenon can not occur, and go slick, applied range, power consumption is few, the drilling efficiency height, speed of fulfiling hole is fast, cost is low, can inject multiple slurry material, slip casting effect is good, and is in light weight, simple in structure, easy to use, can solve various bad grounds, drifting sand layer, the dynamic problem of difficult slip casting behind the difficult pore-forming of current, the pore-forming, be applicable to various weak bad grounds.
Description of drawings:
Fig. 1 is a kind of sectional structure schematic diagram of implementing profit of the utility model.In the drawings:
1-pressure-bearing end cap, 2-screw, 3-O RunddichtringO,
4-plane bearing, 5-needle bearing, 6-V-type high-pressure seal ring,
7-cylinder blanket, 8-hydroecium, 9-high-voltage quick joint,
10-radially pod apertures, 11-water transport channel, 12-connector,
13-main shaft.
The specific embodiment
Referring to Fig. 1, the water guide cell structure of two fluid grouting light rig of the present utility model comprises cylinder blanket 7 and is contained in this cylinder blanket 7 and upper/lower terminal is positioned at main shaft 13 outside the cylinder blanket, its design feature is, described cylinder blanket 7 middle parts are provided with hydroecium 8 and this hydroecium 8 and are communicated with the high-voltage quick joint 9 of cylinder blanket 7 one sides; The hypomere of described main shaft 13 is the hollow shaft that is provided with water transport channel 11, and the top of this hollow shaft is provided with the radially pod apertures 10 of a plurality of connection hydroeciums 8 and water transport channel 11; The upper/lower terminal of described cylinder blanket 7 is equipped with respectively with screw 2 and is fixed on pressure-bearing end cap 1 on this cylinder blanket 7, and between described pressure-bearing end cap 1 and the main shaft 13 O RunddichtringO 3 is housed; To hydroecium 8 plane bearing 4, needle bearing 5, V-type high-pressure seal ring 6 are housed successively between the main shaft 13 of each pressure-bearing end cap 1 inboard and the cylinder blanket 7 and by pressure-bearing end cap 1.V-type high-pressure seal ring 6 is selected V-type combination unreinforced seal circle for use, and it is embedded in the groove of cylinder blanket 7 two ends inwalls.
Described high-voltage quick joint 9 adopts the snap joint of φ 20mm; Water guide cell structure monnolithic case is of a size of: cylinder blanket 7 long 15cm, external diameter 6.6cm, heavy 2.9kg.The lower end of main shaft 13 is provided with multipotency joint card, can be connected with the motor head of different model; The upper end of main shaft 13 is connected with the silk mouth with required drilling rod.Drilling rod can adopt the multiple special-purpose drilling rods that are combined into such as half six rib hollow drills, half fried dough twist hollow drill, makes it to satisfy to creep into requirement.

Claims (1)

1, a kind of water guide cell structure of two fluid grouting light rig, comprise cylinder blanket (7) and be contained in this cylinder blanket (7) and upper/lower terminal is positioned at main shaft (13) outside the cylinder blanket, it is characterized in that the high-voltage quick joint (9) that described cylinder blanket (7) middle part is provided with hydroecium (8) and same cylinder blanket (7) one sides of this hydroecium (8) is communicated with; The hypomere of described main shaft (13) is for being provided with the hollow shaft of water transport channel (11), and the top of this hollow shaft is provided with the radially pod apertures (10) of a plurality of connection hydroeciums (8) and water transport channel (11); The upper/lower terminal of described cylinder blanket (7) is equipped with respectively with screw (2) and is fixed on pressure-bearing end cap (1) on this cylinder blanket (7), and between described pressure-bearing end cap (1) and the main shaft (13) O RunddichtringO (3) is housed; To hydroecium (8) plane bearing (4), needle bearing (5), V-type high-pressure seal ring (6) are housed successively between main shaft (13) that each pressure-bearing end cap (1) is inboard and the cylinder blanket (7) and by pressure-bearing end cap (1).
CNU2008201588595U 2008-10-22 2008-10-22 Water guide chamber structure for double-liquid light-duty drill Expired - Fee Related CN201254965Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201588595U CN201254965Y (en) 2008-10-22 2008-10-22 Water guide chamber structure for double-liquid light-duty drill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201588595U CN201254965Y (en) 2008-10-22 2008-10-22 Water guide chamber structure for double-liquid light-duty drill

Publications (1)

Publication Number Publication Date
CN201254965Y true CN201254965Y (en) 2009-06-10

Family

ID=40738282

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201588595U Expired - Fee Related CN201254965Y (en) 2008-10-22 2008-10-22 Water guide chamber structure for double-liquid light-duty drill

Country Status (1)

Country Link
CN (1) CN201254965Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359359A (en) * 2011-10-27 2012-02-22 无锡市安迈工程机械有限公司 Medium guide mechanism of drilling machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359359A (en) * 2011-10-27 2012-02-22 无锡市安迈工程机械有限公司 Medium guide mechanism of drilling machine

Similar Documents

Publication Publication Date Title
CN102678040B (en) Drilling device and method for baseplate in coal mine roadway
CN101769271B (en) Deep-well oil-extraction external flow-channel direct and reverse circulation freely-throwing jet injector oil production method and device
CN101158271B (en) Oil-water well oil layer positioning deep penetration horizontal drilling device
CN102337859B (en) Coal field drill hole leak blocking system
CN204984334U (en) Rotary blowout preventer
CN201254965Y (en) Water guide chamber structure for double-liquid light-duty drill
CN202165049U (en) Tube-inserting well cementation device
CN203420679U (en) Large-displacement composite lifting system for deep well and extra deep well
CN101429862A (en) Positive and reverse circulation integrated hydraulic jet oil production method and apparatus
CN204626390U (en) A kind of drilling tool current divider for quadruple high-pressure rotary-spray
RU183761U1 (en) Swivel - nozzle for manual drilling rig
CN207673287U (en) A kind of jet-propelled high-efficiency helical drilling tool
CN202955049U (en) Double-barreled water jet pump
CN202273640U (en) Leak stoppage system for drilling of coal field
CN202249849U (en) Underground pressurizing device
CN201344022Y (en) Direct-and-reverse-circulation integrated hydraulic jet oil production system
CN200975246Y (en) Integrating layered water distributor
CN103807222A (en) Double-pipe hydraulic jet flow pump
CN201705301U (en) Deep well oil production outer runner positive and negative circulation free shot jet pump oil production device
CN204920775U (en) Jumbo size well is with anti - circulating air hammer hammer block structure
CN202866732U (en) Hole opening plugging device and gas extraction system
CN100395427C (en) Oil production method with no pole and oil production system
CN106761384B (en) Well system
CN105064952A (en) Well cementation fluid rotary flow generating device
CN211925146U (en) Trenchless built-in casing pipe repairing equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090610