CN201251813Y - Network prepaid expense charging management system - Google Patents

Network prepaid expense charging management system Download PDF

Info

Publication number
CN201251813Y
CN201251813Y CNU2008201322869U CN200820132286U CN201251813Y CN 201251813 Y CN201251813 Y CN 201251813Y CN U2008201322869 U CNU2008201322869 U CN U2008201322869U CN 200820132286 U CN200820132286 U CN 200820132286U CN 201251813 Y CN201251813 Y CN 201251813Y
Authority
CN
China
Prior art keywords
unit
module
order
concentrator
main station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201322869U
Other languages
Chinese (zh)
Inventor
黄惠英
许志永
洪欣
黄德彪
张健
张龙
陈琛
林罕
张健伟
王化芬
葛朋
苏和
翁俊
叶金智
莫桑比
童刚
叶志明
陈德心
翁玉莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING BANNER ELECTRIC MANUFACTURING CORPORATION
Original Assignee
BEIJING BANNER ELECTRICAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING BANNER ELECTRICAL Co Ltd filed Critical BEIJING BANNER ELECTRICAL Co Ltd
Priority to CNU2008201322869U priority Critical patent/CN201251813Y/en
Application granted granted Critical
Publication of CN201251813Y publication Critical patent/CN201251813Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Control Of Vending Devices And Auxiliary Devices For Vending Devices (AREA)

Abstract

The utility model discloses a network prepaid expense charging management system which is invented in order to solve the problems that the electricity energy management of the power administration section is difficult, and the like in the prior art. The network prepaid expense charging management system at least comprises a CPU card, a gauge unit, a concentrator unit, a communication unit and a main station unit, wherein the gauge unit and the concentrator unit are communicated through a powerline carrier wave, and the concentrator unit and the main station unit are connected by a public telephone network, and the like, thus the installation is very simple and convenient, any unnecessary tie line is not needed, and contact points for network link are greatly reduced, thereby the contact point failure rate on the network line link is greatly lowered, and the operating cost is greatly reduced.

Description

The network prepayment electricity-selling system
Technical field
The utility model relates to a kind of card prepay charging management system.
Background technology
Card prepay charging management system is checked meter in order to solve owing to electricity consumer quantity causes greatly, fee collection arduousness and user's owing electricity charges phenomenon invent.
Existing card prepay charging management system is to realize payment function (also having minority is to realize by non-contact card (radio-frequency card etc.)) by contact card (storage card, logic encryption card, CPU card) as transmission medium mostly.Though this mode reduced widely check meter, the intensity of fee collection, but under the present Routine Management mode of power department, there are some shortcomings, mainly show on the electric energy management and have problems, make it be difficult to satisfy the needs of power marketing administrative reform: can not reflect the user power utilization situation in real time, can't computed losses; Statistics is inaccurate, can't truly reflect the user power utilization situation; Operation is difficult to standardization, causes unexplained loss to increase; Data acquisition is untimely, can't reflect the electric load situation in real time, can not carry out effective monitoring to user behavior, can't realize that networked sale of electricity purchases electricity and management thereof.
The utility model content
For overcoming above-mentioned defective, the purpose of this utility model is to provide a kind of networked card prepay charging management system simple in structure.
For achieving the above object, the utility model network prepayment electricity-selling system comprises CPU card, table meter unit, concentrator unit, communication unit and main station unit at least; Wherein,
The CPU card is used for finishing and purchases electricity and purchase electric weight to showing to count to append in the unit;
Table meter unit in order to the power consumption of metering user, and is uploaded to this power consumption concentrator unit and receives the data and the order that pass under the concentrator unit with carrier system by line of electric force and carry out corresponding action;
Concentrator unit in order to the electricity consumption data centralization with each table meter unit, its downstream, and is uploaded to main station unit and receives main station unit by communication unit and carry out corresponding action by data and order that communication unit passes down;
Communication unit intercoms with main station unit mutually in order to connect concentrator unit by public communication network; Described public communication network can be GPRS, CDMA, public telephone network etc.
Main station unit is in order to receive data that concentrator unit uploads and it is carried out statistical study and according to user power utilization amount situation with purchase and pass corresponding data and order under the electric weight situation.
Wherein, above-mentioned table meter unit is made up of main control chip and connected key-press module, E-SAM key authentication module, protection module, display module, infrared/the 485/PLC communication module, power on/off module, memory module, metering module and supply module; Wherein, infrared/485/PLC communication module is used to be provided with real-time clock, the timesharing parameter of table meter unit, and can carry out operations such as parameter modification, status data read, check meter by communication interface his-and-hers watches meter unit; E-SAM key authentication module is in order to stick into capable safety certification, metering and status data in the while storage list meter unit to CPU.
Adopting said structure, to being to carry out communication by power line carrier the concentrator unit, is to connect with public telephone network etc. from table meter unit between from the concentrator unit to the main station unit.Install very easyly, without any need for unnecessary line, significantly reduced network and connected contact, thereby greatly reduced the contact failure rate that network line connects, greatly reduce operating cost.
Description of drawings
Fig. 1 is the structure diagram of the utility model network prepayment electricity-selling system.
Fig. 2 is the structure diagram of table meter unit among Fig. 1.
Fig. 3 is the process flow diagram of E-SAM key authentication module and CPU card internal authentication in the table meter unit.
Fig. 4 is the process flow diagram of E-SAM key authentication module and the external authentication of CPU card in the table meter unit.
Embodiment
The utility model is done the explanation in a step below in conjunction with drawings and Examples.
As shown in Figure 1, the utility model network prepayment electricity-selling system comprises CPU card, table meter unit, concentrator unit, communication unit and main station unit at least; Wherein,
The CPU card is used for finishing and purchases electricity and purchase electric weight to showing to count to append in the unit;
Table meter unit in order to the power consumption of metering user, and is uploaded to this power consumption concentrator unit and receives the data and the order that pass under the concentrator unit with carrier system by line of electric force and carry out corresponding action;
Concentrator unit in order to the electricity consumption data centralization with each table meter unit, its downstream, and is uploaded to main station unit and receives main station unit by communication unit and carry out corresponding action by data and order that communication unit passes down;
Communication unit intercoms with main station unit mutually in order to connect concentrator unit by public communication network;
Main station unit is in order to receive data that concentrator unit uploads and it is carried out statistical study and according to user power utilization amount situation with purchase and pass corresponding data and order under the electric weight situation.
Wherein, above-mentioned CPU card preferably adopts the Contact Type Ic Card that meets the ISO7816 international standard, also can adopt other form certainly, as radio-frequency card etc.
As shown in Figure 2, above-mentioned table meter unit is made up of main control chip and connected key-press module, E-SAM key authentication module, protection module, display module, infrared/the 485/PLC communication module, power on/off module, memory module, metering module and supply module; Wherein, infrared/485/PLC communication module is used to be provided with real-time clock, the timesharing parameter of table meter unit, and can carry out operations such as parameter modification, status data read, check meter by communication interface his-and-hers watches meter unit; E-SAM key authentication module is in order to sticking into capable safety certification to CPU, metering and the status data in the storage list meter unit simultaneously, table are counted main control chip in the unit only plays data transmission in verification process effect, do not relate to data encryption and decipherment algorithm.
E-SAM key authentication module and CPU stick into capable safety certification and divide two parts in the table meter unit: internal authentication and external authentication;
The flow process of its internal authentication is as shown in Figure 3:
1) random number CH is got from the CPU card in table meter unit;
2) table meter unit reads the card sequence number SN on the CPU card, send ESAM module;
3) the ESAM module is encrypted card sequence number SN with internal authentication master key M, generates internal authentication working key K1;
4) table meter unit send encrypted instruction and random number to the CPU card, the internal authentication secret key encryption of CPU card, and send encrypted result D1 back to table and count the unit;
5) table meter unit send encrypted instruction and random number to give the ESAM module, and the ESAM module is sent encrypted result D2 back to table meter unit;
6) table meter unit compares D1 and D2, if equate, and then internal authentication success; Otherwise it is unsuccessful.
The flow process of its external authentication as shown in Figure 4,
1) random number CH is got from the CPU card in table meter unit;
2) table meter unit reads the card sequence number SN on the CPU card, send ESAM module;
3) ESAM module electricity consumption off-balancesheet portion authenticates master key M and card sequence number SN is encrypted generation internal authentication working key K1;
4) table meter unit send ESAM module with random number, and the ESAM module, and is returned encrypted result D1 random number encryption with working key;
5) table meter unit send encrypted result to the CPU card, concurrent external authentication instruction;
6) the CPU card is told whether success of table meter unit authentication, if success then the IC-card state enter the state of respective external authenticate key regulation automatically.

Claims (2)

1, a kind of network prepayment electricity-selling system is characterized in that: comprise CPU card, table meter unit, concentrator unit, communication unit and main station unit at least; Wherein,
The CPU card is used for finishing and purchases electricity and purchase electric weight to showing to count to append in the unit;
Table meter unit in order to the power consumption of metering user, and is uploaded to this power consumption concentrator unit and receives the data and the order that pass under the concentrator unit with carrier system by line of electric force and carry out corresponding action;
Concentrator unit in order to the electricity consumption data centralization with each table meter unit, its downstream, and is uploaded to main station unit and receives main station unit by communication unit and carry out corresponding action by data and order that communication unit passes down;
Communication unit intercoms with main station unit mutually in order to connect concentrator unit by public communication network;
Main station unit is in order to receive data that concentrator unit uploads and it is carried out statistical study and according to user power utilization amount situation with purchase and pass corresponding data and order under the electric weight situation.
2, network prepayment electricity-selling system as claimed in claim 1 is characterized in that: described table meter unit is made up of main control chip and connected key-press module, E-SAM key authentication module, protection module, display module, infrared/the 485/PLC communication module, power on/off module, memory module, metering module and supply module;
Wherein, infrared/485/PLC communication module is used to be provided with real-time clock, the timesharing parameter of table meter unit, and can carry out operations such as parameter modification, status data read, check meter by communication interface his-and-hers watches meter unit; E-SAM key authentication module is in order to stick into capable safety certification, metering and status data in the while storage list meter unit to CPU.
CNU2008201322869U 2008-08-20 2008-08-20 Network prepaid expense charging management system Expired - Lifetime CN201251813Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201322869U CN201251813Y (en) 2008-08-20 2008-08-20 Network prepaid expense charging management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201322869U CN201251813Y (en) 2008-08-20 2008-08-20 Network prepaid expense charging management system

Publications (1)

Publication Number Publication Date
CN201251813Y true CN201251813Y (en) 2009-06-03

Family

ID=40747485

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201322869U Expired - Lifetime CN201251813Y (en) 2008-08-20 2008-08-20 Network prepaid expense charging management system

Country Status (1)

Country Link
CN (1) CN201251813Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102142171A (en) * 2011-01-30 2011-08-03 宁波迦南电子有限公司 Transmission media of intelligent charge-controlled electricity meter and electricity purchasing method by using same
CN102682380A (en) * 2012-05-10 2012-09-19 深圳市航天泰瑞捷电子有限公司 Remote prepayment system
CN106157439A (en) * 2015-04-20 2016-11-23 中兴通讯股份有限公司 A kind of method and device that pre-paying kilowatt-hour meter is supplemented with money

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102142171A (en) * 2011-01-30 2011-08-03 宁波迦南电子有限公司 Transmission media of intelligent charge-controlled electricity meter and electricity purchasing method by using same
CN102682380A (en) * 2012-05-10 2012-09-19 深圳市航天泰瑞捷电子有限公司 Remote prepayment system
CN106157439A (en) * 2015-04-20 2016-11-23 中兴通讯股份有限公司 A kind of method and device that pre-paying kilowatt-hour meter is supplemented with money

Similar Documents

Publication Publication Date Title
CN201251814Y (en) Staircase prepaid electric energy meter
CN109636365B (en) Electricity consumption information acquisition system and acquisition method
CN102074076B (en) Intelligent electric meter centralized recharging terminal and control method thereof
CN102521921A (en) Charge control device, prepayment electricity selling system, electricity selling system and method thereof
CN106652207A (en) Charging pile energy management terminal
Omijeh et al. Modeling of gsm-based energy recharge scheme for prepaid meter
CN2911761Y (en) Smart integrated control and management device for water and electricity
CN203825085U (en) Intelligent electric energy meter system based on NFC and Bluetooth technologies
CN101859479A (en) Remote wireless meter reading device for prepayment
CN103033656B (en) Intelligent electric energy meter with embedded type safety control module
CN101833823A (en) Intelligent IC card advanced charge thermal clearing control system and control process thereof
CN201251813Y (en) Network prepaid expense charging management system
CN102593949B (en) User side peak-shaving power storage and supply system
CN201281721Y (en) Low-voltage electric power carrier integral meter-recording system
CN201402280Y (en) Triphase prepayment electric energy meter system based on GPRS
CN203799444U (en) Intelligent electric energy meter system based on NFC and Wi-Fi technologies
CN203055003U (en) IC card meter cost control management system
CN201725386U (en) Electric energy meter based on SM1 cryptographic algorithm
CN201583594U (en) Single-phase carrier electric energy meter
CN101482994A (en) Electronic voice alarm carrier communication electric energy meter
CN201278165Y (en) Multifunctional IC card prepayment management apparatus with data remote function
CN207397392U (en) Can CPU card power purchase three-phase local cost control intelligent electric meter
CN201788577U (en) Prepaying remote wireless meter reader
CN102624063A (en) Intelligent charging system and method
CN202013609U (en) Prepaid electric meter based on GPRS (General Packet Radio Service) transmission

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: BEIJING BANNER ELECTRIC CO., LTD.

Free format text: FORMER NAME: BEIJING BONA ELECTRONIC CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 102208 Beijing 1033 mailbox, Longcheng garden, Beijing, Changping District

Patentee after: BEIJING BANNER ELECTRIC MANUFACTURING CORPORATION

Address before: 102208 Beijing 1033 mailbox, Longcheng garden, Beijing, Changping District

Patentee before: Beijing Banner Electrical Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090603