CN201248985Y - Double-triangle reverse trapezoid psychosocial behavior training appliance - Google Patents

Double-triangle reverse trapezoid psychosocial behavior training appliance Download PDF

Info

Publication number
CN201248985Y
CN201248985Y CNU2008201335229U CN200820133522U CN201248985Y CN 201248985 Y CN201248985 Y CN 201248985Y CN U2008201335229 U CNU2008201335229 U CN U2008201335229U CN 200820133522 U CN200820133522 U CN 200820133522U CN 201248985 Y CN201248985 Y CN 201248985Y
Authority
CN
China
Prior art keywords
bridge
columns
rope
install
horizontal bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201335229U
Other languages
Chinese (zh)
Inventor
王择青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING BRIGHTEASE SCI-TECH DEVELOPMENT Co Ltd
Original Assignee
BEIJING BRIGHTEASE SCI-TECH DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING BRIGHTEASE SCI-TECH DEVELOPMENT Co Ltd filed Critical BEIJING BRIGHTEASE SCI-TECH DEVELOPMENT Co Ltd
Priority to CNU2008201335229U priority Critical patent/CN201248985Y/en
Application granted granted Critical
Publication of CN201248985Y publication Critical patent/CN201248985Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a double-triangle reverse trapezoid psychosocial behavior training appliance integrating a plurality of single-subject training devices which are combined and connected on a main framework, the main framework is a structure formed by the connection of eight upright posts and cross beams among the upper ends of the upright posts, the structure is of a trapezoid in top view with two reverse triangles at two sides, and the upper edges of the reverse triangles and the longer edge of the reverse trapezoid are on the same line. The utility model integrates a plurality of training devices as a whole, has multiple functions, occupies small space, saves material, has low manufacture cost, is available to the simultaneous training of a plurality of subjects, saves time and labor, is convenient to use, and the like, thereby being suitable for the simultaneous training of military multiple subjects, various physical trainings and psychosocial combined training.

Description

Two triangles fall trapezoidal psychological behavior training apparatus
Technical field
The utility model relates to psychological training and sports apparatus, in particular for the psychological behavior training apparatus of military and sports.
Background technology
Along with the raising day by day and the military training continuous advancement in technology of sports level, the apparatus of military training and physical training is also needed continuous expansion.Existing be used for military and exercise and sport psychology training subject such as: bridge cut-off, cable-suspended bridge, swing wooden bridge, high ladder, horizontal bar etc., used apparatus mostly is one by one, and individual event stand-alone training equipment rearranges, or the apparatus of 2-3 item simple arrangement, it is complicated that its multidisciplinary trains used institution to constitute, and the training distance is big, time and effort consuming, floor space is wide, limit by its apparatus structure, often do not reach the training requirement or the train on of regulation, also bring inconvenience to use.
The utility model content
At the deficiency that existing exercising device exists, the utility model aims to provide a kind of novel structure, design is unique, function is many, take up an area of few psychological behavior training apparatus.
The technical solution adopted in the utility model is:
A kind of pair of triangle falls trapezoidal psychological behavior training apparatus, this exercising device is coupled to multiple branch training device combination of sets on the main body framework, main body framework is linked to be by the crossbeam group between eight root posts and the upper end thereof that to overlook to falling trapezoidal both sides be the structure of two dels, the top of del with fall trapezoidal long limit on same straight line.
In further structure, described branch training device comprises high hollow wooden bridge, netting, seesaw bridge, precipice cross wall, prompt drop rope, ski-running bar, rope ladder, single-plank bridge, Wall for climbing, aerial horizontal bar, high ladder, plum blossom bridge, bridge cut-off, rope bridge, interdependence and cable-suspended bridge.
In further structure, the column of described main body framework is divided into one to No. eight from left to right successively, between a column and No. two columns, install high hollow wooden bridge, high hollow wooden bridge below installing netting, between No. two columns and No. three columns, install the precipice cross wall, precipice cross wall below installing rope ladder, the prompt drop rope, ski-running bar and vertical ladder, between No. three columns and a column, install the seesaw bridge, between No. three columns and No. four columns, install single-plank bridge, between No. four columns and No. five columns, install Wall for climbing, between No. five columns and No. six columns, install aerial horizontal bar, between No. six columns and No. seven columns, install high ladder, between No. seven columns and No. eight columns, install bridge cut-off, between No. eight columns and No. six columns, install the plum blossom bridge, between No. two columns and No. seven columns, install rope bridge and interdependence, between No. three columns and No. six columns, install cable-suspended bridge.
In further structure, be shaped on terraced ear on the column of described main body framework, the below of aerial horizontal bar is provided with to climb steps on column, also is shaped on terraced ear on it.
In further structure, be connected with lateral conductor on the column of described main body framework.
In further structure, be provided with the top protection system between the crossbeam of described main body framework or column.
In further structure, described aerial horizontal bar is provided with the device that can regulate the horizontal bar distance, comprise three pulleys and a rope, one end of rope ties up on the horizontal bar, rope is at first walked around a pulley of horizontal bar far-end by clockwise order, walk around two pulleys of horizontal bar near-end again, the other end with rope ties up on the horizontal bar at last.
In further structure, described bridge cut-off is provided with the device that can regulate bridge cut-off fracture width, bridge cut-off is divided into two ends, one end is a stiff end, and the other end is the adjustable side, and the adjustable side is divided into main bridge and Zi Qiao, on the slide rail of main bridge inside bearing is housed, positioning port is left in main bridge side, the Zi Qiao side be provided with can with sub-bridge along the slide rail of main bridge inside from main bridge inner release push away handle, push away handle and positioning port clamping mutually.
In further structure, described high ladder is provided with beam and chain jockey, the side of making, beam two ends body, and carve a ring recess at square body middle part, buckle into two sections band irons making spill in the groove relatively, two sections band irons are waled beam, connect with chain at two of band iron, by two chains a beam are hung under another root beam.
In further structure, described rope bridge and interdependence are provided with the steel wire rope adjusting device, are provided with the screw of regulating the steel wire rope degree of tightness at the two ends of steel wire rope.
In further structure, described seesaw bridge is provided with interlock and buffer unit, by chain two bridge plates is linked to each other, and first bridge plate and last piece bridge plate linkage from top to bottom have been provided with the rubber blanket of cushioning effect below the bridge plate.
In further structure, described plum blossom bridge is provided with the bridge floor fixture, and its fixing point is clamped chain by two iron plates, and two iron plates connect with screw.
The utility model collection precipice cross wall, rope ladder, the prompt drop rope, the ski-running bar, bridge cut-off, the plum blossom bridge, Wall for climbing, the seesaw bridge, aerial horizontal bar, high ladder, the rope bridge, multiple training device such as interdependence is in one, it is many to have function, floor space is little, save material, low cost of manufacture, multidisciplinary can be trained simultaneously, time saving and energy saving, advantage such as easy to use, compact conformation compared with prior art, rationally, show through the test result on trial, by the incremental training of certain hour, can make the trainee overcome mental handicape, adapt to complicated dangerous environment, thereby improve psychological training and physical training effect effectively, be applicable to that military multidisciplinary is trained simultaneously and various physical training.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the vertical view that the utility model adds lateral conductor.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in further detail.
Description of reference numerals is as follows:
1---high hollow wooden bridge 2---netting
3---seesaw bridge 4---precipice cross wall
5---prompt drop rope 6---ski-running bar
7---rope ladder 8---single-plank bridge
The aerial horizontal bar of 9---Wall for climbing 10---
11---high ladder 12---plum blossom bridge
13---bridge cut-off 14---rope bridge
15---interdependence 16---cable-suspended bridge
17---climb and step on column 26---backguy
18,19,20,21,22,23,24,25---column
As Fig. 1, shown in 2, this exercising device is with the high hollow wooden bridge 1 of branch training device, netting 2, seesaw bridge 3, precipice cross wall 4, prompt drop rope 5, ski-running bar 6, rope ladder 7, single-plank bridge 8, Wall for climbing 9, aerial horizontal bar 10, high ladder 11, plum blossom bridge 12, bridge cut-off 13, rope bridge 14, interdependence 15 and cable-suspended bridge 16 combination of sets are coupled on the main body framework, main body framework is by eight root posts 18,19,20,21,22,23,24,25 and many be linked to be with the crossbeam group that to overlook to falling trapezoidal both sides be the structure of two dels, the top of del with fall trapezoidal long limit on same straight line; Between a column 18 and No. two columns 19, install high hollow wooden bridge 1, high hollow wooden bridge below installing netting 2, between No. two columns 19 and No. three columns 20, install precipice cross wall 4, precipice cross wall below installing rope ladder 7, prompt drop rope 5, ski-running bar 6 and vertical ladder, between No. three columns 20 and a column 18, install seesaw bridge 3, seesaw bridge 8 is provided with interlock and buffer unit, with chain two bridge plates are linked to each other, step on first bridge plate like this, last piece bridge plate also can and then make progress or move downward, Here it is linkage, the rubber blanket below can bumping against when bridge plate moves downward plays cushioning effect; Between No. three columns 20 and No. four columns 21, install single-plank bridge 8, between No. four columns 21 and No. five columns 22, install Wall for climbing 9, between No. five columns 22 and No. six columns 23, install aerial horizontal bar 10, aerial horizontal bar 9 is provided with the device that can regulate the horizontal bar distance, three pulleys by aerial horizontal bar top and rope are in the distance of crossbeam adjusted horizontal bar, one end of rope is tied up on the horizontal bar, rope is at first walked around a pulley of horizontal bar far-end by clockwise order, walk around two pulleys of horizontal bar near-end again, the other end with rope ties up on the horizontal bar at last, and the rope that pulls between two coasters of near-end just can be regulated the horizontal bar distance; Between No. six columns 23 and No. seven columns 24, install high ladder 11, high ladder is provided with beam and chain jockey, the side of making, beam two ends body, and carve a ring recess at square body middle part, buckle into two sections band irons making spill in the groove relatively, such two sections band irons are just waled beam, connect with chain at two of band iron, just can hang on a beam under another root beam by two chains; Between No. seven columns 24 and No. eight columns 25, install bridge cut-off 13, bridge cut-off is provided with the device that can regulate bridge cut-off fracture width, bridge cut-off is divided into two ends, one end is a stiff end, and the other end is the adjustable side, and the adjustable side can be divided into main bridge and Zi Qiao, pushing away handle and sub-bridge can be released sub-bridge along the slide rail of main bridge inside from main bridge is inner by promotor site bridge side, on the slide rail of main bridge inside bearing is housed, positioning port is also left in main bridge side, and the group bridge can be with pushing handle card stator bridge on positioning port after shifting the appropriate location onto; Install plum blossom bridge 12 between No. eight columns 25 and No. six columns 23, plum blossom bridge 6 is provided with the bridge floor fixture, and its fixing point is clamped chain by two iron plates, and two iron plates connect with screw; Install rope bridge 14 and interdependence 15 between No. two columns 19 and No. seven columns 24, rope bridge and interdependence are provided with the steel wire rope adjusting device, are provided with set screw at the two ends of steel wire rope, can reconcile the degree of tightness of steel wire rope arbitrarily; Between No. three columns 20 and No. six columns 23, install cable-suspended bridge 16; Be fitted with lateral conductor 26 on the column of main body framework respectively; and step on climbing of the column of main body framework and aerial horizontal bar and to be shaped on terraced ear on the column 17 so that climb; for guaranteeing training of safety, improve training effect, can be above being provided with between the crossbeam of main body framework or column protection system.
During use, on this exercising device, can once all finish interdependence, walk the rope bridge, climb step on high ladder, cross over bridge cut-off, jump use leisure moments middle horizontal bar, by training programs such as precipice cross wall, plum blossom bridge, seesaw bridge, slide bar, sliding ropes; Perhaps select wherein several training subjects according to actual needs.Show by training and the practice that has sports: climb and step on high ladder and can temper people's team sense, strong will, the spirit of utter devotion; Cross over bridge cut-off and can strengthen the courage that overcomes difficulties, improve the frightened ability that overcomes, cultivate and dare to be spirit and strong self-confidence; Jump use leisure moments in horizontal bar can experience challenge and success, cultivate positive, bravery, all-out action quality; Pass the rope bridge and can overcome fear and pressure, cultivate precipitant good psychological quality; Slide bar and sliding rope can be grasped basic operational capability, promote physical efficiency, temper courage and insight, cultivate self stimulation, dare to the spirit that breaks through the oneself, work hard to full capacity; Interdependence can be cultivated courage and self-confidence, by with other people effective cooperation, simultaneously trust the other side completely, can obtain common success; The seesaw bridge can be tempered courage and insight, strengthens the courage and the confidence that overcome difficulties, develops self-potential, carries out Thinking Innovation; The plum blossom bridge can strengthen confidence and courage, tempers firm and resolute behavior quality, cultivates and dares to be spirit, fully excavates self potential; The precipice cross wall can be broken away from negative feeling, faces and overcomes difficulties, and forges indomitable spirit.
Certainly, the utility model also can be designed to the multi-functional psychological behavior integration exercising device that other syndeton is formed according to training and the needs of taking exercise.
The utility model is not limited to above-mentioned preferred forms, and anyone can draw other various forms of products under enlightenment of the present invention.Though but on its shape or structure, do any variation, every identical with the utility model or akin technical scheme is all within its protection domain.

Claims (10)

1, a kind of pair of triangle falls trapezoidal psychological behavior training apparatus, this exercising device is coupled to multiple branch training device combination of sets on the main body framework, it is characterized in that, described main body framework is linked to be by the crossbeam group between eight root posts and the upper end thereof that to overlook to falling trapezoidal both sides be the structure of two dels, the top of del with fall trapezoidal long limit on same straight line.
2, according to claim 1 pair of triangle falls trapezoidal psychological behavior training apparatus, it is characterized in that described branch training device comprises high hollow wooden bridge, netting, seesaw bridge, precipice cross wall, prompt drop rope, ski-running bar, rope ladder, single-plank bridge, Wall for climbing, aerial horizontal bar, high ladder, plum blossom bridge, bridge cut-off, rope bridge, interdependence and cable-suspended bridge.
3, according to claim 2 pair of triangle falls trapezoidal psychological behavior training apparatus, it is characterized in that, the column of described main body framework is divided into one to No. eight from left to right successively, between a column and No. two columns, install high hollow wooden bridge, high hollow wooden bridge below installing netting, between No. two columns and No. three columns, install the precipice cross wall, precipice cross wall below installing rope ladder, the prompt drop rope, ski-running bar and vertical ladder, between No. three columns and a column, install the seesaw bridge, between No. three columns and No. four columns, install single-plank bridge, between No. four columns and No. five columns, install Wall for climbing, between No. five columns and No. six columns, install aerial horizontal bar, between No. six columns and No. seven columns, install high ladder, between No. seven columns and No. eight columns, install bridge cut-off, between No. eight columns and No. six columns, install the plum blossom bridge, between No. two columns and No. seven columns, install rope bridge and interdependence, between No. three columns and No. six columns, install cable-suspended bridge.
4, according to claim 3 pair of triangle falls trapezoidal psychological behavior training apparatus, it is characterized in that, is shaped on terraced ear on the column of described main body framework, and the below of aerial horizontal bar is provided with to climb steps on column, also is shaped on terraced ear on it.
5, according to claim 3 pair of triangle falls trapezoidal psychological behavior training apparatus, it is characterized in that, is connected with lateral conductor on the column of described main body framework.
6, according to claim 3 pair of triangle falls trapezoidal psychological behavior training apparatus, it is characterized in that, is provided with the top protection system between the crossbeam of described main body framework or column.
7, according to claim 3 pair of triangle falls trapezoidal psychological behavior training apparatus, it is characterized in that, described aerial horizontal bar is provided with the device that can regulate the horizontal bar distance, comprise three pulleys and a rope, one end of rope ties up on the horizontal bar, rope is at first walked around a pulley of horizontal bar far-end by clockwise order, walks around two pulleys of horizontal bar near-end again, and the other end with rope ties up on the horizontal bar at last.
8, according to claim 3 pair of triangle falls trapezoidal psychological behavior training apparatus, it is characterized in that, described bridge cut-off is provided with the device that can regulate bridge cut-off fracture width, and bridge cut-off is divided into two ends, and an end is a stiff end, the other end is the adjustable side, the adjustable side is divided into main bridge and Zi Qiao, on the slide rail of main bridge inside bearing is housed, and positioning port is left in main bridge side, the Zi Qiao side be provided with can with sub-bridge along the slide rail of main bridge inside from main bridge inner release push away handle, push away handle and positioning port clamping mutually.
9, according to claim 3 pair of triangle falls trapezoidal psychological behavior training apparatus, it is characterized in that, described high ladder is provided with beam and chain jockey, the side of making, beam two ends body, and in the middle part of square body, carve a ring recess, and two sections band irons making spill are buckled in the groove relatively, two sections band irons are waled beam, two at band iron connects with chain, by two chains a beam is hung under another root beam.
10, according to claim 3 pair of triangle falls trapezoidal psychological behavior training apparatus, it is characterized in that described rope bridge and interdependence are provided with the steel wire rope adjusting device, is provided with the screw of regulating the steel wire rope degree of tightness at the two ends of steel wire rope; Described seesaw bridge is provided with interlock and buffer unit, by chain two bridge plates is linked to each other, and first bridge plate and last piece bridge plate linkage from top to bottom have been provided with the rubber blanket of cushioning effect below the bridge plate; Described plum blossom bridge is provided with the bridge floor fixture, and its fixing point is clamped chain by two iron plates, and two iron plates connect with screw.
CNU2008201335229U 2008-08-29 2008-08-29 Double-triangle reverse trapezoid psychosocial behavior training appliance Expired - Lifetime CN201248985Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201335229U CN201248985Y (en) 2008-08-29 2008-08-29 Double-triangle reverse trapezoid psychosocial behavior training appliance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201335229U CN201248985Y (en) 2008-08-29 2008-08-29 Double-triangle reverse trapezoid psychosocial behavior training appliance

Publications (1)

Publication Number Publication Date
CN201248985Y true CN201248985Y (en) 2009-06-03

Family

ID=40744659

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201335229U Expired - Lifetime CN201248985Y (en) 2008-08-29 2008-08-29 Double-triangle reverse trapezoid psychosocial behavior training appliance

Country Status (1)

Country Link
CN (1) CN201248985Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105833472A (en) * 2016-05-06 2016-08-10 新乡医学院 Basketball fitness training system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105833472A (en) * 2016-05-06 2016-08-10 新乡医学院 Basketball fitness training system

Similar Documents

Publication Publication Date Title
US11235188B2 (en) Exercise device and method of exercising using said device
CN201248985Y (en) Double-triangle reverse trapezoid psychosocial behavior training appliance
CN201248989Y (en) Double-triangle isosceles trapezoid psychosocial behavior training appliance
CN201248987Y (en) Double- rhombus psychosocial behavior training appliance
CN201248986Y (en) Hexagonal psychosocial behavior training appliance
CN201248988Y (en) Single-rhombus transverse triangle psychosocial behavior training appliance
CN204411553U (en) The multi-functional supplemental training device of physical education
CN204485181U (en) Physical training is climbed jump trainer
CN201291016Y (en) Mind behavior training combination apparatus
CN2899857Y (en) Multifunction physical agility and psychological behavour training equipment
CN203663328U (en) Outdoor outward training combining device
CN201006224Y (en) Novel psychology behavior exercising device
CN205850081U (en) Multifunctional locomotor
DE202007000434U1 (en) Sport practice equipment e.g. for performing stretching, has column with several elements built from column with elements being C-shaped handles having two horizontal sides which connect to vertical brackets
CN203899094U (en) Roller skating exercise auxiliary exerciser
CN206730399U (en) A kind of ligament tension device
CN103785182A (en) Safe hurdle
CN206152205U (en) Multifunction physical agility and psychological behavour training equipment
RU2710695C1 (en) Simulator for increasing human growth
CN214714208U (en) Sports psychological behavior training apparatus
CN215995451U (en) Traversing device
CN201101845Y (en) Multifunctional mentality action exercising apparatus
CN201291014Y (en) Large mind and behavior training combination apparatus
CN207429573U (en) A kind of climbing device for physical education for children education
RU44527U1 (en) SPORTS APPLIANCE FOR CLIMBING

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20090603

CX01 Expiry of patent term