CN201236518Y - Twin-foot guyed tower - Google Patents

Twin-foot guyed tower Download PDF

Info

Publication number
CN201236518Y
CN201236518Y CNU2008201504509U CN200820150450U CN201236518Y CN 201236518 Y CN201236518 Y CN 201236518Y CN U2008201504509 U CNU2008201504509 U CN U2008201504509U CN 200820150450 U CN200820150450 U CN 200820150450U CN 201236518 Y CN201236518 Y CN 201236518Y
Authority
CN
China
Prior art keywords
tower
guyed
legged
backguys
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201504509U
Other languages
Chinese (zh)
Inventor
陈志坚
李卫
张自强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Posts & Telecommunication Designing Consulting Institute Co., Ltd.
Original Assignee
Shanghai Posts & Telecommunications Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Posts & Telecommunications Design Institute Co Ltd filed Critical Shanghai Posts & Telecommunications Design Institute Co Ltd
Priority to CNU2008201504509U priority Critical patent/CN201236518Y/en
Application granted granted Critical
Publication of CN201236518Y publication Critical patent/CN201236518Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Support Of Aerials (AREA)

Abstract

A two-foot guyed tower comprises a tower body and two guy wires. The tower body comprises a central rod and two tower feet which are fixedly connected; the central rod is vertical to a connecting line between the two feet; the central axis of the central rod is arranged on the middle point of the connecting line between the two feet; any tower foot is connected with a tower body foundation part through a hinging structure; upper ends of two guy wires are respectively connected with both sides of the position with identical height on the central rod, and the lower ends thereof are respectively connected with a guy wire foundation pile; and the two guy wires form an angle of 180 degrees on the horizontal plane. A central rod body can rotate along the connecting line between the tower feet as an axis. The guyed tower body adopts a truss structure or a steel pipe structure, so as to ensure enough strength and stability in the plane direction, thereby eliminating the need of the guy wires to fix; and the two guy wires are arranged in the direction vertical to the connecting line between the tower feet, thereby effectively supporting the direction outside the plane. The utility model reduces the processing difficulty of the guyed tower, is convenient to install, and has brief outer appearance.

Description

Double-legged guyed tower
Technical field:
The utility model relates to the building and the communications field, relates in particular to steel building, particularly iron tower, and concrete is a kind of double-legged guyed tower.
Background technology:
Extensively adopt the Guywire tower of steel work to support cable in the fields such as communication, electric power, radio and television.In the prior art, Guywire tower adopts towline and two kinds of members of body of the tower to carry out combined bay and stands, and body of the tower adopts single pin to link to each other with ground, relies on towline to fix, towline must evenly be arranged at three or four direction, require the area in place bigger, Guywire tower is frequent because the place is former thereby can't set up the construction technology complexity, during on-the-spot the installation, need to regulate the towline of several directions, could guarantee that body of the tower is upright, facade is in disorder in addition.
Summary of the invention:
The purpose of this utility model is to provide a kind of double-legged guyed tower, and described this double-legged guyed tower will solve the towline of Guywire tower in the prior art and arrange the technical problem that floor space is big, construction technology is complicated and facade is in disorder.
This double-legged guyed tower of the present utility model is made of body of the tower and two backguys, wherein, described body of the tower is fixedlyed connected with two column foots by a center-pole and is constituted, the central axis of described center-pole is vertical with line between two column foots, the central axis of center-pole is arranged on the mid point of line between two column foots, any one described column foot all is connected with a body of the tower basic part by articulated structure separately, the upper end of described two backguys is connected to the both sides of sustained height position on the center-pole, the lower end of two backguys is connected with a guyed foundation stake separately, and two backguys become 180 degree angles in horizontal plane.
Further, described two backguys are respectively perpendicular to the line between two column foots.
Further, the upper end of described body of the tower is provided with antenna and lightning rod.
Further, any one described column foot all is connected with described body of the tower basic part by hinge separately, and the axis of described hinge all is located along the same line.
Further, described center-pole and two column foots are made of by welding angle steel.
Perhaps, described center-pole and two column foots are connected and composed by bolt and flange arrangement by steel pipe.
Further, described backguy is steel hinge line or wire rope.
Operating principle of the present utility model is: hinged between two column foots and the basis, the axis of column foot hinge is located along the same line, and the center shaft can be along the line between column foot as rotational.The backguy body of the tower can adopt trussed construction or steel tubular structure, and planar direction has guaranteed enough intensity and stability, does not need backguy to fix; Two backguys be arranged on and column foot between the perpendicular direction of line on, can effectively support direction outside the plane.Guywire tower when mounted, can be on ground in the face of body of the tower carry out assembly unit, carry out being connected of column foot and basis then, again by backguy with the body of the tower pull-up, the stressed verticality even and body of the tower of stay cord for the treatment of both direction reaches requirement and gets final product.
The utility model is compared with prior art, and its effect is actively with tangible.The utility model is provided with two column foots in Guywire tower, and is connected through the hinge between column foot and the body of the tower basis, only need get final product perpendicular to the hinge axes direction backguy being set, and has reduced the difficulty of processing of Guywire tower, and is easy for installation, good looking appearance.
Description of drawings:
Fig. 1 is the main TV structure schematic diagram of double-legged guyed tower of the present utility model.
Fig. 2 is the left TV structure schematic diagram of Fig. 1.
The specific embodiment:
Embodiment 1:
Shown in Fig. 1 and Tu, double-legged guyed tower of the present utility model is made of body of the tower 1 and two backguys 2, wherein, described body of the tower 1 is fixedlyed connected with two column foots 4 by a center-pole and is constituted, the central axis of described center-pole is vertical with line between two column foots 4, the central axis of center-pole is arranged on the mid point of line between two column foots 4, any one described column foot 4 all is connected with a body of the tower basic part 5 by articulated structure separately, the upper end of described two backguys 2 is connected to the both sides of sustained height position on the center-pole, the lower end of two backguys 2 is connected with a guyed foundation stake 3 separately, and two backguys 2 become 180 degree angles in horizontal plane.
Further, described two backguys 2 are respectively perpendicular to the line between two column foots 4.
Further, the upper end of described body of the tower 1 is provided with antenna 6 and lightning rod 7.
Further, any one described column foot 4 all is connected with described body of the tower basic part 5 by hinge separately, and the axis of described hinge all is located along the same line.
Further, described center-pole and two column foots 4 are made of by welding angle steel.
Perhaps, described center-pole and two column foots 4 are connected and composed by bolt and flange arrangement by steel pipe.
Further, described backguy 2 is steel hinge line or wire rope.
Operating principle of the present utility model is: hinged between two column foots 4 and the basis, the axis of column foot 4 hinges is located along the same line, and the center shaft can be along the line of 4 of column foots as rotational.Backguy 2 bodies of the tower 1 can adopt trussed construction or steel tubular structure, and planar direction has guaranteed enough intensity and stability, do not need backguy 2 fixing; On the direction that two backguys 2 are arranged on and the line of 4 of column foots is perpendicular, can effectively support direction outside the plane.Guywire tower when mounted, can be on ground in the face of body of the tower 1 carry out assembly unit, carry out being connected of column foot 4 and basis then, again by backguy 2 with body of the tower 1 pull-up, the stressed verticality even and body of the tower 1 of stay cord for the treatment of both direction reaches requirement and gets final product.

Claims (6)

1. double-legged guyed tower, constitute by body of the tower and two backguys, it is characterized in that: described body of the tower is fixedlyed connected with two column foots by a center-pole and is constituted, the central axis of described center-pole is vertical with line between two column foots, the central axis of center-pole is arranged on the mid point of line between two column foots, any one described column foot all is connected with a body of the tower basic part by articulated structure separately, the upper end of described two backguys is connected to the both sides of sustained height position on the center-pole, the lower end of two backguys is connected with a guyed foundation stake separately, and two backguys become 180 degree angles in horizontal plane.
2. double-legged guyed tower as claimed in claim 1 is characterized in that: described two backguys are respectively perpendicular to the line between two column foots.
3. double-legged guyed tower as claimed in claim 1 is characterized in that: the upper end of described body of the tower is provided with antenna.
4. double-legged guyed tower as claimed in claim 1 is characterized in that: any one described column foot all is connected with described body of the tower basic part by hinge separately, and the axis of described hinge all is located along the same line.
5. double-legged guyed tower as claimed in claim 1 is characterized in that: described center-pole and two column foots are connected and composed by bolt and flange arrangement by steel pipe.
6. double-legged guyed tower as claimed in claim 1 is characterized in that: described backguy is steel hinge line or wire rope.
CNU2008201504509U 2008-06-30 2008-06-30 Twin-foot guyed tower Expired - Lifetime CN201236518Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201504509U CN201236518Y (en) 2008-06-30 2008-06-30 Twin-foot guyed tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201504509U CN201236518Y (en) 2008-06-30 2008-06-30 Twin-foot guyed tower

Publications (1)

Publication Number Publication Date
CN201236518Y true CN201236518Y (en) 2009-05-13

Family

ID=40649258

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201504509U Expired - Lifetime CN201236518Y (en) 2008-06-30 2008-06-30 Twin-foot guyed tower

Country Status (1)

Country Link
CN (1) CN201236518Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101619628B (en) * 2008-06-30 2010-12-29 上海邮电设计咨询研究院有限公司 Double-legged guyed communication tower
CN104882821A (en) * 2015-06-01 2015-09-02 国家电网公司 Rotation elevating apparatus of overhead ground wire of power transmission line
CN105442906A (en) * 2014-09-01 2016-03-30 国家电网公司 Tower foot structure of guyed tower
CN105888353A (en) * 2016-04-13 2016-08-24 国核电力规划设计研究院 Single-phase bracing wire tension support and application thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101619628B (en) * 2008-06-30 2010-12-29 上海邮电设计咨询研究院有限公司 Double-legged guyed communication tower
CN105442906A (en) * 2014-09-01 2016-03-30 国家电网公司 Tower foot structure of guyed tower
CN104882821A (en) * 2015-06-01 2015-09-02 国家电网公司 Rotation elevating apparatus of overhead ground wire of power transmission line
CN105888353A (en) * 2016-04-13 2016-08-24 国核电力规划设计研究院 Single-phase bracing wire tension support and application thereof
CN105888353B (en) * 2016-04-13 2018-03-23 国核电力规划设计研究院 A kind of single-phase bracing wire anchor support and its application

Similar Documents

Publication Publication Date Title
CN101619628B (en) Double-legged guyed communication tower
CN201236518Y (en) Twin-foot guyed tower
CN203795942U (en) Tower reinforcing support structure
CN103547527A (en) Rotating tower crane
CN202745400U (en) Adjustable inclined strut with vertical prefabricated part
CN201176728Y (en) Communication iron tower integrating stay cable self-supporting tower body and machinery room
CN203729440U (en) Stay bar lower joint of rigid supporting dome structure
RU2449093C2 (en) Frame of rapidly erected structure and method of its assembly
CN205531399U (en) Interim support frame is installed in high -order steel truss segmentation
CN202785387U (en) Indoor cantilever crane
CN107201779B (en) A kind of batter post couples the structure of stress with wide span house cap
CN211523708U (en) Ceiling truss connecting rod zipper structure
CN105625795A (en) Adjustable leading rope spreading arm frame
CN204126297U (en) A kind of temporary support of steel truss roof
CN216235744U (en) Super high-rise structure tower crane conversion section and tower crane adopting same
CN216949703U (en) Power transformation framework
CN202248995U (en) Rapid integration communication device suitable for mountainous regions
CN201526180U (en) Tower mast with communication machine room
CN205000514U (en) Stand loss prevention structure
CN205024920U (en) Portable glass steel house beam structure for house
CN203922533U (en) A kind of anti-deformation climbing support safety device
CN211447891U (en) Assembled steel truss buffering hysteresis type bearing structure
CN204189939U (en) The ruggedized construction of original support lever frame of communication antenna transformation
CN207221307U (en) A kind of support device of list column ferris wheel
CN207244832U (en) A kind of vault and the vestibule containing the vault

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI POST AND TELECOMMUNICATIONS DESIGN AND CO

Free format text: FORMER NAME: SHANGHAI POST AND TELEGRAPH DESIGN INSTITUTE LTD.

CP03 Change of name, title or address

Address after: Shanghai city Yangpu District Guokang Road 38, zip code: 200092

Patentee after: Shanghai Posts & Telecommunication Designing Consulting Institute Co., Ltd.

Address before: Shanghai Guokang Road 38, zip code: 200092

Patentee before: Shanghai Posts & Telecommunications Design Institute Co., Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20090513

Effective date of abandoning: 20080630