CN201236318Y - Arch case prefabricated end socket positioning base - Google Patents

Arch case prefabricated end socket positioning base Download PDF

Info

Publication number
CN201236318Y
CN201236318Y CNU2008201042995U CN200820104299U CN201236318Y CN 201236318 Y CN201236318 Y CN 201236318Y CN U2008201042995 U CNU2008201042995 U CN U2008201042995U CN 200820104299 U CN200820104299 U CN 200820104299U CN 201236318 Y CN201236318 Y CN 201236318Y
Authority
CN
China
Prior art keywords
angle steel
positioning
arc
contact surface
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201042995U
Other languages
Chinese (zh)
Inventor
庞博新
黄绍结
蒙立和
李宗文
韩玉
秦大燕
李彩霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Road and Bridge Engineering Group Co Ltd
Original Assignee
GUANGXI ZHUANG NATIONALITY AUTONOMOUS REGION HIGHWAY BRIDGE ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI ZHUANG NATIONALITY AUTONOMOUS REGION HIGHWAY BRIDGE ENGINEERING Co filed Critical GUANGXI ZHUANG NATIONALITY AUTONOMOUS REGION HIGHWAY BRIDGE ENGINEERING Co
Priority to CNU2008201042995U priority Critical patent/CN201236318Y/en
Application granted granted Critical
Publication of CN201236318Y publication Critical patent/CN201236318Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a positioning seat for a prefab end of an arc box, which is a positioning structure for controlling the precision of a segmental prefab connector of a reinforced concrete arch box. The positioning seat comprises a door-type frame including a concrete column, angle steels and a supporting rod; a steel plate is pre-embedded on the concrete column; a positioning angle steel is fixed on the steel plate; the supporting rod is welded with an end contact surface angle steel to form the door-type frame which is fixed on the positioning angle through screw bolts; and the end contact surface angle steel is mounted at an inclination angle according to the design of the end of the arc box. The angle steel of the connector of the arc box is connected with the end contact surface angle steel, and both ends of the an arc vaulting are provided with the positioning seats, so that the connectors of adjacent arc box segments are coupled together to avoid repeated measurements of connector angle steels of the positioning arc boxes, the key problems of control of the end of an arc segment, and the like are solved, and the precision of the connector of the arc box is guaranteed, so the construction quality is guaranteed.

Description

The prefabricated termination of arch case positioning seat
Technical field
The utility model relates to a kind of when striding the bigger bridge construction in footpath, for the location structure of reinforced concrete arch case prefabricate joint precision control.
Background technology
At present, adopt the bridge span footpath of cable lifting construction increasing, along with the increase of striding the footpath, the increase of segmental hoisting sections, the joint precision of prefabricated arch case becomes influence arch case lifting accuracy factors, and the arch case connects inaccuracy, and joint connects contact not exclusively, and then the even transmission of influence arch case axial force, influence safety and reliability that cable lifts.Mostly joint angle steel installing and locating when the arch case is prefabricated is to be fixed on the template of termination, the position that all needs repeated measurement termination template during each the installation, each error of measuring has caused the scale error of arch case termination, have a strong impact on the installation accuracy of its arch case, and repeatedly the workload of Ce Lianging is also big, and effect is not high.
Summary of the invention
The purpose of this utility model is the restive problem of the prefabricated precision of arch case that overcomes prior art for the box arch bridge work progress, a kind of auxiliary location structure is provided, make it can guarantee adjacent two segment arch case joint realization coupling, the accurately prefabricated location of the arch case pedestal of control arch case preparation joint precision.
The technical scheme that its technical problem that solves the utility model adopts is: the positioner that a special location arch case joint angle steel is set at two of prefabricated ground of arch case tire, utilize positioner will encircle the fixed-site of case joint angle steel by one-shot measurement, avoid repeatedly measurement and positioning arch case joint angle steel, improve the prefabricated precision of arch case, also improved effect simultaneously greatly.Be characterized in: form the portal frame positioning seat by concrete column and angle steel, pole, on concrete column, be embedded with steel plate, be fixed with the location angle steel on the steel plate, pole 4 and termination contact surface angle steel be welded into portal frame by bolt on the angle steel of location, so just form a firm positioning seat.Termination contact surface angle steel, install according to design inclination angle, arch case termination, to encircle case joint angle steel is connected on the contact surface angle steel of termination with bolt, play a part location arch case joint angle steel, that is to say, the inclination angle of the joint angle steel on the arch case and the design inclination angle of prefabricated positioning seat termination contact surface angle steel coincide, and so just can guarantee the precision of joint when two arch casees connect.
The beneficial effects of the utility model are, at arch tire two positioning seat are set, and make adjacent arch case sections joint realize coupling, avoided repeatedly measurement and positioning arch case joint angle steel, key issues such as arch section end position control are guaranteed to encircle case joint precision, thereby have been guaranteed construction quality.
Description of drawings
Fig. 1 is the prefabricated location of an arch case pedestal elevation.
Fig. 2 is that the B of Fig. 1 is to view.
Fig. 3 is that the C of Fig. 1 is to view.
Among the figure: 1. reinforced concrete post, 2. pre-embedded steel slab, 3. location angle steel, 4. pole angle steel, 5. termination contact surface angle steel, 6. bolt, 7. arch case joint angle steel, 8. arch case, 9. prefabricated ground of arch case tire, 10. ground.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
As shown in the figure, the frame type pedestal that the prefabricated location of arch case pedestal is made of concrete column and angle steel, by termination contact angle steel 5 and 7 couplings of arch case joint angle steel, concrete location pedestal is set at arch tire 9 two, prefabricated ground of case, location angle steel 3 is fixing with concrete column 1 by being welded on the pre-embedded steel slab 2, pole angle steel 4 is welded into a portal frame with termination contact surface angle steel 5 and fixes by bolt 6 and location angle steel 3, when arch case 8 is prefabricated, will encircles case joint angle steel 7 and be bolted on the termination contact surface angle steel 5 by bolt 6.The inclined plane that constituted of termination contact surface angle steel 5 keeps consistent with design inclination angle, arch case 8 terminations up and down, makes arch case 8 realize accurate the coupling in no support cable hoisting process, and the assurance contact surface is smooth, accurate.After arch case 8 prefabricated the finishing, remove bolt 6, just can take down the portal frame that pole angle steel 4 and termination contact surface angle steel 5 are formed, just can hang away arch case 8 then.

Claims (1)

1, the prefabricated termination of a kind of arch case positioning seat, it is characterized in that: the portal frame that it is made up of concrete column (1) and angle steel, pole (4), on concrete column (1), be embedded with steel plate (2), be fixed with location angle steel (3) on the steel plate (2), pole (4) is welded into portal frame with termination contact surface angle steel 5 and is fixed on the location angle steel (3) by bolt (6), termination contact surface angle steel 5 is installed according to design inclination angle, arch case termination, and the arch case joint angle steel (7) that will encircle two setting of prefabricated ground of case tire (9) is connected on the termination contact surface angle steel (5) with bolt (6).
CNU2008201042995U 2008-06-10 2008-06-10 Arch case prefabricated end socket positioning base Expired - Lifetime CN201236318Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201042995U CN201236318Y (en) 2008-06-10 2008-06-10 Arch case prefabricated end socket positioning base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201042995U CN201236318Y (en) 2008-06-10 2008-06-10 Arch case prefabricated end socket positioning base

Publications (1)

Publication Number Publication Date
CN201236318Y true CN201236318Y (en) 2009-05-13

Family

ID=40649056

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201042995U Expired - Lifetime CN201236318Y (en) 2008-06-10 2008-06-10 Arch case prefabricated end socket positioning base

Country Status (1)

Country Link
CN (1) CN201236318Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867392A (en) * 2018-07-26 2018-11-23 广西长长路桥建设有限公司 Precast beam adjustable type tire construction method
CN110747748A (en) * 2019-10-30 2020-02-04 中铁建大桥工程局集团第三工程有限公司 Arc concrete precast pedestal arch ring segment beam moving construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867392A (en) * 2018-07-26 2018-11-23 广西长长路桥建设有限公司 Precast beam adjustable type tire construction method
CN110747748A (en) * 2019-10-30 2020-02-04 中铁建大桥工程局集团第三工程有限公司 Arc concrete precast pedestal arch ring segment beam moving construction method

Similar Documents

Publication Publication Date Title
CN111851565B (en) Steel structure stand column alignment structure with cup-mouth type foundation and construction method thereof
CN102926538B (en) Reaction box and construction method of reaction wall
CN204982667U (en) Prestressing force rubber tube poling machine
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN109403213B (en) Bridge prefabrication pier body installation, positioning and guiding device and construction method thereof
CN114541652B (en) Construction method of V-shaped steel column
CN111896364A (en) Adjustable precast stair and precast floor slab static load test supporting system
CN201236318Y (en) Arch case prefabricated end socket positioning base
CN206306232U (en) A kind of ballastless track slab mold
CN105274940B (en) A kind of bridge arch rib integral installation method
CN103174155A (en) Reverse construction method for erecting steel column and pouring concrete foundation later and steel support for construction
CN204455862U (en) A kind of steel box-girder seam angle rackwork
CN101261125A (en) Large-sized rotating curved face foundation surface calibration method and apparatus
CN108360825A (en) A kind of foundation bolt location centralizing device and application method
CN212078678U (en) Airport field way beam slab bearing structure
CN201448561U (en) Bench type simple fixing structure of foundation bolts
CN212406169U (en) Prefabricated assembled reinforced concrete post butt joint positioner
CN108411794B (en) Precise positioning device and positioning method for positioning framework of spherical hinge under swivel bridge
CN209855824U (en) Tunnel bow member assembled construction equipment
CN208073012U (en) A kind of foundation bolt location centralizing device
CN203174618U (en) Steel support for reverse construction of firstly erecting steel column and then pouring concrete foundation
CN114575371B (en) Cup-mouth foundation H-shaped steel column positioning method
CN215640015U (en) A anti-seismic performance detection device for cable-stay bridge
CN215618973U (en) Fine adjustment frame and adjustment system for subway prefabricated plate type ballastless track
CN110082080B (en) PC track beam static load test pedestal suitable for different beam lengths and curvatures

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 530011 No. 17 Zhonghua Road, the Guangxi Zhuang Autonomous Region, Nanning

Patentee after: Guangxi road and bridge engineering Group Co., Ltd

Address before: 530011 No. 17 Zhonghua Road, the Guangxi Zhuang Autonomous Region, Nanning

Patentee before: Guangxi Zhuang Nationality Autonomous Region Highway Bridge Engineering Company

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090513