CN201234358Y - Welding connection construction for electric heat tube and flange - Google Patents

Welding connection construction for electric heat tube and flange Download PDF

Info

Publication number
CN201234358Y
CN201234358Y CNU2008201202759U CN200820120275U CN201234358Y CN 201234358 Y CN201234358 Y CN 201234358Y CN U2008201202759 U CNU2008201202759 U CN U2008201202759U CN 200820120275 U CN200820120275 U CN 200820120275U CN 201234358 Y CN201234358 Y CN 201234358Y
Authority
CN
China
Prior art keywords
flange
welding
electrothermal tube
sheath
welding connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201202759U
Other languages
Chinese (zh)
Inventor
吕越斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Heatwell Mechanical & Electrical Co Ltd
Original Assignee
Hangzhou Heatwell Mechanical & Electrical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Heatwell Mechanical & Electrical Co Ltd filed Critical Hangzhou Heatwell Mechanical & Electrical Co Ltd
Priority to CNU2008201202759U priority Critical patent/CN201234358Y/en
Application granted granted Critical
Publication of CN201234358Y publication Critical patent/CN201234358Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a structure for welded joint of an electrothermal tube and a flange. A protective sheath is arranged on the electrothermal tube which is positioned above the flange, one end of the protective sheath is in welded joint with the flange, and the other end thereof is in welded joint with the tube opening of the electrothermal tube (2). The structure has the advantages of (1) effectively preventing the electrothermal tube wall being burnt off due to indirect argon-arc welding on the tube wall, (2) improving the welding strength of the argon-arc welding, and obviating the process of production of a clamping apparatus during braze welding in a furnace,and (3) increasing the contact length during braze welding in the furnace so as to improve the welding quality.

Description

Electrothermal tube and flange welding connection structure
Technical field
The utility model relates to the electrothermal tube field, mainly is a kind of electrothermal tube and flange welding connection structure.
Background technology
When furnace brazing is adopted in the welding of electrothermal tube and flange, the mode that at first needs electrothermal tube and flange are adopted argon arc welding spot welding is fixedly shown in Fig. 1 such as the A, prevent the process generation relative displacement that electrothermal tube and flange weld in stove, product size after causing welding is undesirable, is coated with scolder then in the welding position and enters the position that is coated with soldering paste when welding the B place for furnace brazing in the stove.There is following defective in above structure: 1, be easy to the burn-through tube wall when electrothermal tube and flange argon arc welding spot welding, cause the decreasing insulating of electrothermal tube.2, because spot welding intensity is bad, need make special-purpose anchor clamps when often welding, prevent that flange and electrothermal tube are subjected to displacement when welding.
Summary of the invention
The utility model will solve above-mentioned existing shortcoming, and a kind of electrothermal tube and flange welding connection structure are provided.
The utility model solves the technical scheme that its technical problem adopts: this electrothermal tube and flange welding connection structure, mainly comprise flange and electrothermal tube, at flange sheath of electrothermal tube position increase with top, one end and the flange of sheath are welded to connect, and the mouth of pipe of the other end of sheath and electrothermal tube 2 is welded to connect.
Described sheath one end is pressed on flange upper surface and welding with it, and described sheath is a cylindrical shape.
The effect that the utility model is useful is: 1, owing to directly do not carry out argon arc welding at the tube wall position, can effectively prevent the risk of electrothermal tube tube wall burn-through.2, increase the weld strength of argon arc welding, when furnace brazing, can remove the process of making anchor clamps from.Contact length when 3, welding in the increase stove improves welding quality.
Description of drawings
Fig. 1 is the prior art constructions schematic diagram;
Fig. 2 is the utility model master TV structure schematic diagram;
Description of reference numerals: flange 1, electrothermal tube 2, sheath 3.
Embodiment
Below in conjunction with drawings and Examples the utility model is described in further detail.
As shown in Figure 2, this electrothermal tube and flange welding connection structure, mainly comprise flange 1 and electrothermal tube 2, at flange 1 columnar sheath 3 of electrothermal tube 2 positions increase with top, one end of sheath 3 is pressed on flange 1 upper surface and argon arc welding connection with it, and the mouth of pipe argon arc welding of the other end of sheath 4 and electrothermal tube 2 is connected.
In Fig. 2, the B place is coated with the position of soldering paste during for furnace brazing, and the sheath and the mouth of pipe are fixed in the arc-welding of C place, and sheath and flange are fixed in the arc-welding of D place.Owing to directly do not carry out argon arc welding at the tube wall position, can effectively prevent the risk of electrothermal tube tube wall burn-through.Increase the weld strength of argon arc welding, when furnace brazing, can remove the process of making anchor clamps from.Increase the contact length when welding in the stove, improve welding quality.
In addition to the implementation, the utility model can also have other execution modes.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection range of the utility model requirement.

Claims (3)

1, a kind of electrothermal tube and flange welding connection structure, mainly comprise flange (1) and electrothermal tube (2), it is characterized in that: at electrothermal tube (2) the position increase sheath (3) of flange (1) with top, one end of sheath (3) and flange (1) are welded to connect, and the mouth of pipe of the other end of sheath (4) and electrothermal tube (2) is welded to connect.
2, electrothermal tube according to claim 1 and flange welding connection structure is characterized in that: described sheath (3) one ends are pressed on flange (1) upper surface and welding with it.
3, electrothermal tube according to claim 1 and 2 and flange welding connection structure is characterized in that: described sheath (3) is a cylindrical shape.
CNU2008201202759U 2008-06-24 2008-06-24 Welding connection construction for electric heat tube and flange Expired - Fee Related CN201234358Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201202759U CN201234358Y (en) 2008-06-24 2008-06-24 Welding connection construction for electric heat tube and flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201202759U CN201234358Y (en) 2008-06-24 2008-06-24 Welding connection construction for electric heat tube and flange

Publications (1)

Publication Number Publication Date
CN201234358Y true CN201234358Y (en) 2009-05-06

Family

ID=40620745

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201202759U Expired - Fee Related CN201234358Y (en) 2008-06-24 2008-06-24 Welding connection construction for electric heat tube and flange

Country Status (1)

Country Link
CN (1) CN201234358Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103433631A (en) * 2013-09-09 2013-12-11 芜湖苏立实业有限公司 Nickel-base brazing process of heating tube
CN106151694A (en) * 2016-08-18 2016-11-23 新兴铸管股份有限公司 Ductile iron pipe for jacking construction
CN106304438A (en) * 2016-08-31 2017-01-04 安徽苏立电热科技股份有限公司 A kind of electrothermal tube reinforcement structure and manufacturing process thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103433631A (en) * 2013-09-09 2013-12-11 芜湖苏立实业有限公司 Nickel-base brazing process of heating tube
CN106151694A (en) * 2016-08-18 2016-11-23 新兴铸管股份有限公司 Ductile iron pipe for jacking construction
CN106151694B (en) * 2016-08-18 2019-02-01 新兴铸管股份有限公司 Ductile iron pipe for jacking construction
CN106304438A (en) * 2016-08-31 2017-01-04 安徽苏立电热科技股份有限公司 A kind of electrothermal tube reinforcement structure and manufacturing process thereof

Similar Documents

Publication Publication Date Title
CN106825874B (en) A kind of submerged-arc welding single face welding and double face shaping technique
CN102303178B (en) Semi-automatic gas shield welding construction technology for aluminum conductors
CN207771081U (en) A kind of Cu-AL pipe butt welding machine
CN204148700U (en) A kind of remote tungsten electrode argon arc welding gun
CN106825875A (en) A kind of steel pipe vertical seam double-submerged arc technique
CN201234358Y (en) Welding connection construction for electric heat tube and flange
CN104889527A (en) Pipeline steel pipe welding technology
CN110480133A (en) A kind of submerged-arc welding single face welding and double face shaping technique
CN102581424A (en) Welding method for copper wire and aluminum wire
CN1445044A (en) Method for red copper transition welding without preheating metal alloy
CN101740987A (en) Solid-state welding production method of high-performance conducting rod
CN107252955A (en) The welding procedure of offshore wind farm jacket basis bracket
CN102974925A (en) Method for optimizing aluminum/steel metal inert-gas (MIG) soldered joint through tungsten inert gas (TIG) voltaic arc cooperating with heating
CN202491035U (en) Flange piece and tool
CN102528248A (en) Narrow-gap tungsten inert gas (TIG) welding gun
CN202701573U (en) Longitudinal welded pipe on-line carbon dioxide arc welding apparatus
CN103143852A (en) Braze welding connector and method for welding connector
CN203147094U (en) Copper aluminum pipe resistance welding connector
CN201195224Y (en) Manual direct current argon tungsten-arc welding air cooling type welding gun
CN201442147U (en) Electric conduction nozzle having long dry-extension
CN107755862A (en) One kind series connection electrode double-submerged arc method
CN205967779U (en) Copper aluminum pipe thermal resistance welding set
CN106493460A (en) A kind of double joint tungsten electrode formula argon arc welding gun
CN102513661B (en) CO2 (carbon dioxide) gas shielded welding method for flux-cored wires of marine engineering lifting pile leg
CN107570873A (en) Swing arc laserHybrid welding

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangshan Rewei Metal Manufacturing Co., Ltd.

Assignor: Hangzhou Heatwell Mechanical & Electrical Co., Ltd.

Contract fulfillment period: 2009.7.21 to 2014.7.30

Contract record no.: 2009330002034

Denomination of utility model: Welding connection construction for electric heat tube and flange

Granted publication date: 20090506

License type: Exclusive license

Record date: 20090819

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.7.21 TO 2014.7.30; CHANGE OF CONTRACT

Name of requester: JIANGSHAN REWEI METAL MANUFACTURING CO., LTD.

Effective date: 20090819

EC01 Cancellation of recordation of patent licensing contract

Assignee: Jiangshan Rewei Metal Manufacturing Co., Ltd.

Assignor: Hangzhou Heatwell Mechanical & Electrical Co., Ltd.

Contract record no.: 2009330002034

Date of cancellation: 20110714

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090506

Termination date: 20130624