CN201224884Y - Anchor rod tamping system - Google Patents
Anchor rod tamping system Download PDFInfo
- Publication number
- CN201224884Y CN201224884Y CNU2008200231909U CN200820023190U CN201224884Y CN 201224884 Y CN201224884 Y CN 201224884Y CN U2008200231909 U CNU2008200231909 U CN U2008200231909U CN 200820023190 U CN200820023190 U CN 200820023190U CN 201224884 Y CN201224884 Y CN 201224884Y
- Authority
- CN
- China
- Prior art keywords
- anchor pole
- anchor rod
- construction
- anchor
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200231909U CN201224884Y (en) | 2008-05-30 | 2008-05-30 | Anchor rod tamping system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200231909U CN201224884Y (en) | 2008-05-30 | 2008-05-30 | Anchor rod tamping system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201224884Y true CN201224884Y (en) | 2009-04-22 |
Family
ID=40597770
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200231909U Expired - Lifetime CN201224884Y (en) | 2008-05-30 | 2008-05-30 | Anchor rod tamping system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201224884Y (en) |
-
2008
- 2008-05-30 CN CNU2008200231909U patent/CN201224884Y/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105840207B (en) | Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body | |
CN104612162B (en) | A kind of Deep Foundation Pit of Metro Stations excavation construction method | |
CN101122131B (en) | Foundation pit supporting pile using pipe casting pile embedding in rock | |
CN105780763B (en) | Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile | |
CN103306289B (en) | Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof | |
CN103132908B (en) | Device for drilling rock and embedding rock-socketed prestressed pipe pile by down-hole hammer and construction method of device | |
CN100455731C (en) | Guide pit type manual pot holing pile reinforing and underpinning method for building foundation and composite supporting pile | |
US20140026518A1 (en) | Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts | |
CN102383431B (en) | Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof | |
CN108517877B (en) | Supporting construction method combining consolidation grouting of hybrid filling ultra-deep foundation pit with double-row steel pipe piles | |
CN109024651B (en) | Steel pipe concrete mixed pile foundation and construction method | |
CN111058443B (en) | Precast pile composite foundation construction method for eliminating loess collapsibility | |
CN105442532A (en) | Construction method for pile-head-expanded bored pile | |
CN104329020B (en) | A kind of reinforced long spire embedding rock construction equipment and technique thereof | |
CN111501781A (en) | Supporting method and structure combining consolidation grouting of hybrid filling ultra-deep foundation pit with double rows of steel pipe piles | |
CN108643214A (en) | It is a kind of to backfill miscellaneous native composite foundation structure and its construction method | |
CN106837382A (en) | A kind of subway tunnel country rock pre grouting from the surface reinforcement process | |
CN102995647B (en) | Underground water control method used for grouting and seepage insulation of pile hole | |
CN113969581A (en) | Construction method for rock-entering pile planting | |
CN105064334A (en) | Construction method for cast-in-situ bored pile | |
CN101871218A (en) | Trenchless construction method of underground station space and arc-shaped freezing pipe construction equipment thereof | |
CN111270665A (en) | Construction method of triaxial mixing pile | |
CN204225100U (en) | The construction equipment of concrete pile | |
CN103015435A (en) | Long auger down hole hammer vibration rotary-jet steel reinforced cement-soil pile foundation pit water-resisting and supporting method | |
CN105840209A (en) | Construction method for controlling deformation of anchor piles at barrel segment of tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: SINOPEC OILFIELD SERVICE CORPORATION Free format text: FORMER OWNER: SHENGLI ENGINEERING CONSTRUCTION (GROUP) CORPORATION LTD. OF SHENGLI OIL FIELD Effective date: 20150106 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 257000 DONGYING, SHANDONG PROVINCE TO: 100029 CHAOYANG, BEIJING |
|
TR01 | Transfer of patent right |
Effective date of registration: 20150106 Address after: 100029 Beijing City, Chaoyang District Hui Street No. six twelfth floor Patentee after: SINOPEC OILFIELD SERVICE CORPORATION Address before: 257000 No. two, 755 North Road, Dongying District, Shandong, Dongying Patentee before: Shengli Engineering Construction (Group) Co.,Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20090422 |
|
CX01 | Expiry of patent term |