Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
As shown in Figure 1, the utility model city expressway interchange traffic flow character parameter acquisition system comprises data acquisition module, data processing module and the data outputting module that connects with computing machine respectively, and described data acquisition module comprises that a plurality of vehicle magnetic reflection traffic analysis, vehicle somatotype statistical system, GPS, video camera, camera and manual counter etc. also comprise other article and consumptive material such as tape measure, grade rod, ail gun, hammer, nail, adhesive tape, reflective vest, hard shoulder or the like.Described data acquisition module and connecting of computing machine are the connecting of each instrument port and computer port in the described data acquisition module.Described data processing module comprises data process subsystem and AutoCAD computer-aided design (CAD) module and the document process module that is arranged in each instrument.
The utility model city expressway interchange traffic flow character parameter acquisition system, wherein, described vehicle magnetic reflection traffic analysis has been selected advanced in the world NC-97 type vehicle magnetic reflection traffic analysis, its function is recording traffic flow, the speed of a motor vehicle, length over ends of body, and wet and slippery aridity and road utilization rate etc. are shown in record road table temperature, road; Can calculate time headway, density etc.Described vehicle somatotype statistical system adopts MetroCount vehicle somatotype statistical system, and its function is can calculate speed, flow, time headway, wheelbase, the number of axle etc. by the moment of writing down axletree process sensor.The GPS GPS can provide high-precision vehicle location information, record travel speed, time and driving trace.Set up video camera aloft, take road and traffic conditions, write down road conditions, the volume of traffic, traffic composition and main line and ring road interleaving process; Can together use with above-mentioned relevant acquisition instrument, reject the fail data that volume of traffic Acquisition Instrument collects; Combining road is executed the graticule of drawing, and carries out the vehicle position calibration of changing trains.Computing machine is used for being provided with the essential information of data collecting instrument and stores data.Camera is used for taking the scene photograph of each side such as road conditions, transportation condition, instrument laying.Manual counter cooperates stopwatch to be used for synchronous recording and divides the peak hour traffic of interflow district and interwoven region.
The data collection task main contents comprise in the city expressway interchange traffic flow character parameter acquisition system, the manual research of Turning movement on the bridge and under the bridge, the data acquisition of basic highway section, branch/interflow district, interwoven region and ring road, and running qualities of a wagon observation etc.These measured datas are used for the analysis of grade separation traffic characteristics on the one hand, are used for demarcation, checking and the emulation experiment of theoretical analysis, realistic model on the other hand.The basic road traffic delay in through street observed to obtain the through street traffic stream characteristics, for planning, design and the management of through street provides foundation.
Embodiment:
Below with on the through street, inner city, Tianjin to defend upright three collections with through street interchange traffic flow character parameter of typical case's representative of elder brother's grade separation, Tianjin, Tianjin elder brother's grade separation and Tianjin Jin Tang be that example is described instrument layout of the present utility model, data acquisition, processing and output procedure:
(1) laid polylith NC-97 Acquisition Instrument on two-way 8 tracks in basic highway section, through street, write down other track vehicle for preventing NC-97, instrument is staggeredly arranged, Fig. 2 is instrument layout figure.
(2) branch/interflow district traffic characteristics is than basic highway section complexity.Especially the traffic characteristics of outermost track before and after branch/junction of two streams can change.Mainly adopt the sectional observation method during observation.Use NC-97 and MetroCount, can obtain the data such as speed, the volume of traffic, time headway of each track branch vehicle, interflow district instrument layout as shown in Figure 3, the shunting zone instrument layout is as shown in Figure 4.
(3) interwoven region is the most complicated zone of traffic flow operation, also is the key factor that influences the interchange traffic capacity.For the ease of analyzing the traffic characteristics of interwoven region, respectively interwoven region and ring road gateway are carried out data acquisition, concrete instrument layout is as shown in Figure 5.Mainly adopt sectional observation method and artificial counting method during observation.Use NC-97 and MetroCount, can obtain the data such as speed, the volume of traffic, time headway of each track branch vehicle.The artificial observation point is set simultaneously, uses mechanical counter, record is by the vehicle flowrate data and the weaving vehicles situation of observation station.
(4) ring road is the important channel of viaduct and peripheral path contact, and the form of ring road has determined the form of interchange.The horizontal curve of ring road and the array configuration of longitudinal gradient are to also more complicated of the influence of the traffic capacity.Three viaducts of above-mentioned selection have comprised all ring roads than common type, comprise left-hand rotation semi-directional ring road, S type right-hand rotation ring road and loop ramp.Adopt the specific road section observation method.Use NC-97 and MetroCount, can obtain the data such as speed, the volume of traffic, time headway of each track branch vehicle.
For the semi-directional ring road (for example: Tianjin elder brother's grade separation), every day is early during evening peak, the vehicle that commutes urban district and Beijing, airport, Tanggu District in a large number all passes through this semi-directional ring road, and the volume of traffic is bigger, this ring road is carried out careful observation help to analyze its traffic capacity by measured data.NC-97 is distributed in each key point of ring road gathers, at the end, slope and top, slope the speed of two MetroCount calculating vehicles on the end, slope and top, slope is installed respectively simultaneously.
For directed ring road (for example: Tianjin, Tianjin elder brother's grade separation), every day is early during evening peak, the vehicle that commutes urban district and Tanggu District in a large number all passes through this directed ring road, and the volume of traffic is bigger, this ring road is carried out careful observation help to analyze its traffic capacity by measured data.NC-97 is distributed in each key point of ring road gathers, at the end, slope and top, slope the speed of two MetroCount calculating vehicles on the end, slope and top, slope is installed respectively simultaneously.For the instrument layout of semi-directional ring road and directed ring road as shown in Figure 6.
For S type right-hand rotation ring road (for example: Tianjin Jin Tang grade separation),, a NC-97 has been installed, has gathered the speed of a motor vehicle, be used for demarcating the vehicle desired speed of realistic model at linear least favorable and speed of a motor vehicle lowest part.
For loop ramp (for example: Tianjin Jin Tang grade separation) because its four radiuses are all less, have near minimum limit value, therefore very typical.Because the flow of ring road whole day is little, study its traffic capacity with method of emulation, so mainly adopt the speed of NC-97 recording traffic stream, the speed of a motor vehicle that is used to demarcate this ring road.For the instrument layout of S type right-hand rotation ring road and belt ring road as shown in Figure 7.
The collecting method of position of changing trains is: at first from an end of interflow district and interwoven region, spray a white line every 10 meters on the road surface, up to the other end.The frame video camera is taken the vehicle operating process aloft then, by the later stage statistical study, calibrate vehicle generally change trains track pitch from pressure change trains track pitch from.Field conduct such as Fig. 8 and shown in Figure 9.Wherein, 31 meters and 27 meters of interwoven region upstream and downstream triangle end water conservancy diversion line lengths, the interwoven region dashed centre line is 2 meters-4 meters, the main line dashed centre line is 6 meters-9 meters; 45 meters+36 meters=81 meters of interflow district upstream triangle end water conservancy diversion line lengths, interflow district center dotted line is 6 meters-9 meters.
Global position system GPS can the shortest position coordinates every 0.1 second registration of vehicle place, thereby can calculate the speed and the acceleration of vehicle.Therefore, utilizing this power of GPS can carry out on the acceleration-deceleration characteristic observation of typical vehicle and the various ring road changes in vehicle speed characteristic observes.The ring road that adopts GPS to observe comprises: right-hand rotation ring road, semi-directional ring road, loop ramp, S type right-hand rotation ring road.Typical case's vehicle comprises minicar (as: Xiali), minibus (as: Beijing jeep), motor bus (as the gold dragon), load-carrying lorry (as the many sharp cards of east wind).
Go through traffic study in many days, collected through street, above-mentioned three Tianjin typical case interchange several more than 300 hours traffic flow data, form the data processing summary sheet through the processing of data processing module, as shown in the table.
The data processing summary sheet
More than Guan Ce data can be analyzed with instrument its data processing module or related-data handling module, for traffic circle test car licence plate data and gps data, can adopt traffic circle ratio of turning program under two kinds of different priority of " craspedodrome-left-hand rotation-right-hand rotation " and " craspedodrome-right-hand rotation-left-hand rotation ", per 5 minutes license plate data to be mated statistics respectively, obtain the traffic direction of each car that enters the mouth, thereby determine ratio of turning.In addition, the gps data handling procedure can intercept the data of random time section, utilizes the document process module to generate the document that comprises coordinate and time behind the rejecting invalid data, and adopts AutoCAD computer-aided design (CAD) module to mark the CAD figure of vehicle driving trace.Finally, data outputting module is with different file layouts such as data form, chart or graphic form output result, and the through street traffic stream characteristics that is obtained is for planning, design and the management of through street provides a large amount of scientific basic data.
In sum, utilize the utility model parameter acquisition system, collected basic highway section, through street, the traffic flow character parameter of interchange branch/interflow district, interwoven region and various ring roads by to the district's observation of city expressway typical case interchange; For the later stage is set up the Traffic Capacity Analysis model that corresponding database and traffic capacity theoretical analysis model, the speed of determining service level and density, foundation are fit to this city expressway interchange traffic stream characteristics, finally instruct the design of city expressway interchange type selecting to lay a good foundation with this model.
Although in conjunction with the accompanying drawings the utility model has been carried out foregoing description; but the utility model is not limited to above-mentioned embodiment; above-mentioned embodiment only is schematic; rather than it is restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; under the situation that does not break away from the utility model aim, can also make a lot of distortion, these all belong to the row of protection of the present utility model.