CN201217775Y - 系杆拱桥双向临时抗推装置 - Google Patents
系杆拱桥双向临时抗推装置 Download PDFInfo
- Publication number
- CN201217775Y CN201217775Y CNU200820059841XU CN200820059841U CN201217775Y CN 201217775 Y CN201217775 Y CN 201217775Y CN U200820059841X U CNU200820059841X U CN U200820059841XU CN 200820059841 U CN200820059841 U CN 200820059841U CN 201217775 Y CN201217775 Y CN 201217775Y
- Authority
- CN
- China
- Prior art keywords
- arch bridge
- embedded board
- embedded plate
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
本实用新型公开了一种系杆拱桥双向临时抗推装置,设置在拱桥的端横梁底面与桥墩立柱内侧壁之间;包括一斜置的工字梁,还包括分别设置在端横梁底面上的第一预埋板及设置在桥墩立柱内侧壁上的第二预埋板;第二预埋板上倾斜固定有两并列的连接板;工字梁的第一端与第一预埋板固定连接,工字梁的第二端插入两并列的连接板之间并与第二预埋板固定连接;工字梁的第一端与第一预埋板、工字梁的第二端与第二预埋板之间还分别设置有缓冲层。本实用新型具有工程量小,占用空间不大,受力明确等优点,抗剪能力和抗拉能力均较强,整个钢结构造型轻盈,强度好。
Description
技术领域
本实用新型涉及路桥施工技术领域,尤其涉及一种系杆拱桥双向临时抗推装置。
背景技术
简支系杆拱桥的临时抗推装置对整个系杆拱桥的建设起着至关重要的作用。
对简支系杆拱桥来说,在采用常用的先拱后梁的施工时,由于拱的受力特性使得拱在承受竖向荷载(包括拱肋自重,横梁自重,纵梁自重,桥面板自重,铺装和防撞墙自重等)时,在拱的支点位置会产生指向河岸方向的水平推力。最后成桥后,这些水平推力都要由张拉的水平预应力系杆所产生的指向河心方向的水平力来平衡。
具体到一步步的施工过程,随着每一步施工引起的竖向力的增加,水平推力都是在不断增加的,在水平推力达到预先所设定的阀值一时,可张拉一部分水平预应力系杆(可以是分批的,也可以是分级的)以抵消这个水平推力并使该水平推力反向指向河心并小于预先所设定的阀值二,随着其后一步步施工引起的竖向力的增加,指向河心的水平推力又会渐渐减小,又逐渐转变为指向河岸的水平推力,循环该控制过程,直至整个桥梁施工完成。显然,在上述反复循环的过程中,在拱的支点位置会循环产生指向或背离河心方向的水平推力。
由于简支系杆拱两支点的支座都不能承受多大的水平向荷载,所以在每一个循环内,当指向河岸的水平推力达到阀值一前,或当指向河心的水平推力达到阀值二前,该水平推力都需要由临时抗推装置来承受,并且需要该临时抗推装置具有双向的抗剪能力。
现有技术中,一般采用临时固结方式使用支撑立柱解决临时抗推问题,但支撑立柱的工程量大,施工复杂,需要场地和结构空间大。
现有技术中也有较多地采用混凝土限位块或钢结构限位块来提供限位保证。但这两种挡块式结构所采用的混凝土或钢材料的抗剪能力皆较差,传递水平推力的方式都不直接,因此实际使用时效果不好。特别是,混凝土限位块存在抗剪设计方法不明确的技术缺陷,而钢限位块则存在抗剪焊缝质量不稳定等实际施工问题。
因此,本领域的技术人员致力于开发一种结构简单、双向抗剪压效果好、施工方便的系杆拱桥双向临寸抗推装置。
实用新型内容
有鉴于现有技术的上述缺陷,本实用新型所要解决的技术问题是提供一种结构简单、双向抗剪压效果好、施工方便的系杆拱桥双向临时抗推装置。
为实现上述目的,本实用新型提供了一种系杆拱桥双向临时抗推装置,设置在所述拱桥的端横梁底面与桥墩立柱内侧壁之间;包括一斜置的工字梁,还包括分别设置在所述端横梁底面上的第一预埋板及设置在所述桥墩立柱内侧壁上的第二预埋板;所述第二预埋板上倾斜固定有两并列的连接板;所述工字梁的第一端与所述第一预埋板固定连接,所述工字梁的第二端插入所述两并列的连接板之间并与所述第二预埋板固定连接;所述第一端与所述第一预埋板、所述第二端与所述第二预埋板之间还分别设置有缓冲层。
较佳地,还包括一与所述拱桥的端横梁底面固定连接的侧向限位块;所述侧向限位块设置在背离所述工字梁的一侧。
较佳地,所述缓冲层为橡胶垫层。
本实用新型的双向临时抗推装置由于采用上述结构,具有工程量小,占用空间不大,受力明确等优点。特别是,由于采用工字钢梁为中间连接件,并将工字钢梁插设在两连接板之间固定连接,使整个双向临时抗推装置在水平推力双向转换时抗剪能力和抗拉能力较强,整个钢结构造型轻盈,强度好。
在具体实施时,可根据设定的受力阀值的大小来确定工字钢梁的截面尺寸或装置数量。
以下将结合附图对本实用新型的构思、具体结构及产生的技术效果作进一步说明,以充分地了解本实用新型的目的、特征和效果。
附图说明
图1是本实用新型一具体实施例的纵向安装结构示意图;
图2是图1所示实施例的横向安装结构示意图;
图3是图1中第二预埋钢板及连接板的结构示意图;
图4是图3中第二预埋钢板及连接板的侧面结构示意图。
具体实施方式
图1、图2是本实用新型的系杆拱桥双向临时抗推装置,包括一工字钢梁1,还包括钢材料的第一预埋板2及第二预埋板3。
整个临时抗推装置倾斜设置在拱桥的端横梁底面4与桥墩立柱内侧壁5之间。第一预埋板2预埋在拱桥的端横梁底面4上,第二预埋板3预埋在拱桥的桥墩立柱内侧壁5上。从图2中可见,本实施里采用了两组临时抗推装置。
第一预埋板2为一钢板,在一侧设置有锚筋。
参见图3、图4,第二预埋板3与第一预埋板2的结构基本相同,同样在一侧可设置有锚筋31。第二预埋板3在与锚筋31背离的一面上固定有并列的两连接钢板32、33。连接钢板32、33与第二预埋板3可以采用焊接固定连接。
工字钢梁1的一端与第一预埋板2通过焊接固定连接。工字钢梁1的另一端插设在两连接板32、33之间,采用三面围焊的脚焊缝与第二预埋板3固定连接。前述焊接以融透焊为优选。
在工字钢梁1的一端与第一预埋板2之间,工字钢梁1的另一端与第二预埋板3之间,还分别设置有缓冲层(图中未示出)。缓冲层可以采用2mm的橡胶垫层。
在具体实施时,可根据设定的受力阀值的大小来确定工字钢梁的截面尺寸或装置数量。其受力情况与相应的结构设计皆通过结构力学、有限元计算和桥梁规范得到。
在本实用新型的其他实施例中,特别是剪压力比较大的情况下,如图1所示,还可以在端横梁底面4的一侧固定设置一侧向限位块6。侧向限位块6设置在背离工字梁1的一侧,可以更好地实现本装置抵抗指向河心的水平推力。
本实用新型不仅可以用于先拱后梁的拱桥施工,也可以用于先梁后拱的拱桥施工。
本实用新型的装置在施工结束后可以全部割除;也可以仅割除端横梁底面下滑动支座一侧,保留固定支座一侧作为抗震储备。
本实用新型的临时抗推装置由于采用上述结构,具有工程量小,占用空间不大,受力明确。特别是,由于采用工字钢梁为中间连接件,并将工字钢梁插设在两连接板之间固定连接,使整个双向临时抗推装置在水平推力双向转换时抗剪能力和抗拉能力较强,整个钢结构造型轻盈,强度好。
应该理解,在本实用新型的权利要求书、说明书中,所有“包括……”均应理解为开放式的含义,也就是其含义等同于“至少含有……”,而不应理解为封闭式的含义,即其含义不应该理解为“仅包含……”。
综上所述,本说明书中所述的只是本实用新型的几种较佳具体实施例,以上实施例仅用以说明本实用新型的技术方案而非限制。凡本技术领域中技术人员依本实用新型的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在本实用新型的权利要求保护范围之内。
Claims (3)
1、一种系杆拱桥双向临时抗推装置,设置在所述拱桥的端横梁底面与桥墩立柱内侧壁之间;其特征在于:包括一斜置的工字梁,还包括分别设置在所述端横梁底面上的第一预埋板及设置在所述桥墩立柱内侧壁上的第二预埋板;所述第二预埋板上倾斜固定有两并列的连接板;所述工字梁的第一端与所述第一预埋板固定连接,所述工字梁的第二端插入所述两并列的连接板之间并与所述第二预埋板固定连接;所述第一端与所述第一预埋板、所述第二端与所述第二预埋板之间还分别设置有缓冲层。
2、如权利要求1所述的系杆拱桥双向临时抗推装置,其特征在于:还包括一与所述拱桥的端横梁底面固定连接的侧向限位块;所述侧向限位块设置在背离所述工字梁的一侧。
3、如权利要求1所述的系杆拱桥双向临时抗推装置,其特征在于:所述缓冲层为橡胶垫层。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820059841XU CN201217775Y (zh) | 2008-06-17 | 2008-06-17 | 系杆拱桥双向临时抗推装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820059841XU CN201217775Y (zh) | 2008-06-17 | 2008-06-17 | 系杆拱桥双向临时抗推装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201217775Y true CN201217775Y (zh) | 2009-04-08 |
Family
ID=40540608
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU200820059841XU Expired - Fee Related CN201217775Y (zh) | 2008-06-17 | 2008-06-17 | 系杆拱桥双向临时抗推装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201217775Y (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101793010A (zh) * | 2010-03-16 | 2010-08-04 | 中交二航局第二工程有限公司 | 大吨位多跨组合拱桥带拱整体顶推方法 |
CN102251477A (zh) * | 2011-04-19 | 2011-11-23 | 中铁二十三局集团第三工程有限公司 | 系杆拱横移施工方法 |
CN102261039A (zh) * | 2011-04-25 | 2011-11-30 | 长沙理工大学 | 网状系杆拱桥的整体顶推施工法 |
CN108252330A (zh) * | 2018-04-02 | 2018-07-06 | 兰州交通大学 | 一种大断面预制综合管廊连接结构及其防水处理方法 |
-
2008
- 2008-06-17 CN CNU200820059841XU patent/CN201217775Y/zh not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101793010A (zh) * | 2010-03-16 | 2010-08-04 | 中交二航局第二工程有限公司 | 大吨位多跨组合拱桥带拱整体顶推方法 |
CN101793010B (zh) * | 2010-03-16 | 2012-08-29 | 中交二航局第二工程有限公司 | 大吨位多跨组合拱桥带拱整体顶推方法 |
CN102251477A (zh) * | 2011-04-19 | 2011-11-23 | 中铁二十三局集团第三工程有限公司 | 系杆拱横移施工方法 |
CN102251477B (zh) * | 2011-04-19 | 2013-01-09 | 中铁二十三局集团第三工程有限公司 | 系杆拱横移施工方法 |
CN102261039A (zh) * | 2011-04-25 | 2011-11-30 | 长沙理工大学 | 网状系杆拱桥的整体顶推施工法 |
CN102261039B (zh) * | 2011-04-25 | 2013-02-20 | 长沙理工大学 | 网状系杆拱桥的整体顶推施工法 |
CN108252330A (zh) * | 2018-04-02 | 2018-07-06 | 兰州交通大学 | 一种大断面预制综合管廊连接结构及其防水处理方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dan et al. | Theoretical and experimental study on composite steel–concrete shear walls with vertical steel encased profiles | |
Restrepo et al. | Tests on connections of earthquake resisting precast reinforced concrete perimeter frames of buildings | |
CN201217775Y (zh) | 系杆拱桥双向临时抗推装置 | |
CN106988200B (zh) | 纵向不抗剪开孔钢板抗拔连接件及其施工方法 | |
CN108643602B (zh) | 一种适用于混凝土梁柱节点的外包锚钢加固结构 | |
CN110468691B (zh) | 一种灾后可更换装配式混凝土防摇摆桥墩体系 | |
CN206256622U (zh) | 具有自复位功能的损伤可修复装配式组合柱 | |
CN108914765B (zh) | 一种可更换装配式减震桥墩 | |
CN215482258U (zh) | 节段拼装单柱墩分离式uhpc摇摆承台多重减震体系 | |
CN211312233U (zh) | 一种落梁施工用梁端辅助装置 | |
CN108505407A (zh) | 一种全预制装配式混凝土货运悬挂式单轨结构的施工方法 | |
Li et al. | Effects of axial compression load and eccentricity on seismic behavior of nonseismically detailed interior beam-wide column joints | |
CN205242238U (zh) | 一种应用于自锚式悬索桥的主梁结构 | |
Qaisrani | Interior post-tensioned flat plate connections subjected to vertical and biaxial lateral loading | |
CN117500989A (zh) | V连接用于混凝土构件交叉接头和剪力键 | |
CN201217780Y (zh) | 系杆拱桥单向临时抗推装置 | |
Anggadjaja et al. | Edge-column slab connections under gravity and lateral loading | |
Kim et al. | Experimental evaluation of joints consisting of parallel perfobond ribs in steel-PSC hybrid beams | |
CN116335017A (zh) | 一种分离式摇摆承台全装配式桥梁结构体系 | |
CN216474462U (zh) | 含三种耗能措施的摇摆-自复位双层双柱墩桥梁排架结构 | |
CN212477446U (zh) | 一种现浇连续梁0#块托架预压装置 | |
CN111926690A (zh) | 一种新型预制拼装桥墩 | |
Chong et al. | Numerical analysis on nonlinear behavior of the superimposed wall under quasi-static reversed cyclic loading | |
CN100334313C (zh) | 高层建筑物移位的抗倾覆和抗震方法 | |
CN216277061U (zh) | 一种消除既有填充墙震中压杆形成路径的加固构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090408 Termination date: 20150617 |
|
EXPY | Termination of patent right or utility model |