CN201210095Y - Slag breaking device of melt iron tank for measuring temperature of melt iron and sample analysis - Google Patents

Slag breaking device of melt iron tank for measuring temperature of melt iron and sample analysis Download PDF

Info

Publication number
CN201210095Y
CN201210095Y CNU2008200533805U CN200820053380U CN201210095Y CN 201210095 Y CN201210095 Y CN 201210095Y CN U2008200533805 U CNU2008200533805 U CN U2008200533805U CN 200820053380 U CN200820053380 U CN 200820053380U CN 201210095 Y CN201210095 Y CN 201210095Y
Authority
CN
China
Prior art keywords
cylinder
translation
hinged
piston rod
vertical beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200533805U
Other languages
Chinese (zh)
Inventor
尹振芝
梁新亮
谢集祥
周明伟
熊必勇
卢科文
刘丰农
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lysteel Co Ltd
Original Assignee
Lysteel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lysteel Co Ltd filed Critical Lysteel Co Ltd
Priority to CNU2008200533805U priority Critical patent/CN201210095Y/en
Application granted granted Critical
Publication of CN201210095Y publication Critical patent/CN201210095Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigating And Analyzing Materials By Characteristic Methods (AREA)

Abstract

The utility model discloses a slag breaking device of a hot metal ladle, which is used for the temperature measurement of molten iron and sampling analysis. A translation cylinder is horizontally placed in a translation beam; the head part of the piston rod of the translation cylinder is fixedly connected with the inner cavity of the translation beam; and the translation beam which is arranged in the space consisting of four guide wheels is vertically and fixedly connected with the outer wall of a vertical beam. A lifting cylinder is sleeved at the periphery of the upper end of the vertical beam; the tail part of the cylinder body of the lifting cylinder is fixedly connected in the vertical beam; the end part of the piston rod of the vertical beam is fixedly connected with the top end of the inner cavity of the lifting cylinder; a slag breaking cylinder is arranged at one side of the lifting cylinder; and a slag breaking head is positioned at the end head of the piston rod of the slag breaking cylinder. A first supporting seat and a second supporting seat are arranged at the other side of the lifting cylinder; the tail part of the cylinder body of a locking cylinder is hinged on the second supporting seat; the head part of the piston rod of the locking cylinder is hinged with one end of a lever; the middle supporting point of the lever is hinged on the first supporting seat; the other end of the lever is connected with one end of a pull rod through a hinge; and the other end of the pull rod is hinged with a core rod and a brake rod. A spring which is sleeved on the core rod is arranged outside a spring seat, and the ends of the core rod are used for positioning the spring through nuts. The utility model can reliably complete the slag breaking task, reduce the labor intensity of workers, and simultaneously has the function of temperature measurement and sampling analysis.

Description

A kind of hot-metal bottle break device that is used to measure molten iron temperature and sample analysis
Technical field
The utility model relates to the hot-metal bottle break device that is used to measure molten iron temperature and sample analysis in a kind of metallurgical process for making.
Background technology
Molten iron in the hot-metal bottle must carry out temperature measuring to molten iron earlier before pouring converter into and constituent analysis is carried out in sampling, because molten iron will make the molten iron surface in the hot-metal bottle tie one deck slag through one section course of conveying before running to converter from the blast furnace casting place, therefore this layer molten iron top of the slag is not only thick but also hard sometimes, must first break exposes molten iron and just can carry out temperature measuring and sample analysis.Also do not have desirable device or method to solve this difficult problem before the utility model, normally operative employee's armrest is held the steel rod break, if run into thick slag or grit just can't carry out these work, is unfavorable for steel-making.
Summary of the invention
Task to be solved in the utility model provide a kind of can be under any circumstance to the sample analysis and measure the hot-metal bottle break device of molten iron temperature at any time of the molten iron in the hot-metal bottle.
For solving above-mentioned task, the technical solution adopted in the utility model is: a kind of hot-metal bottle break device that is used to measure the molten iron temperature sample analysis described in the utility model mainly is made up of the adjustment member of horizontal range and the adjustment member of vertical range.
The translation cylinder becomes horizontality to be placed on the inside of translation beam, and the piston rod head of translation cylinder is fixed in the translation beam inner chamber, and the cylinder body afterbody of translation cylinder is fixed on the frame.Translation beam becomes horizontal direction to be installed in the space of being made up of the individual guide wheel of N (integers of N 〉=4), and each guide wheel and frame are affixed, and translation beam vertically is fixed in the outer wall of vertical beam.Lifting tube is contained in the periphery of vertical beam, and lift cylinders is equipped with in the inside of vertical beam, and the cylinder body afterbody of lift cylinders is cemented in the vertical beam, and the piston rod end of lift cylinders is cemented in the top of lifting tube inner chamber.One side of lifting tube is furnished with the break cylinder, and of piston rod who stretches out the break cylinder is equipped with dregs breaking head, and the other end of piston rod is cemented in the inner chamber of break cylinder.Opposite side upper end at lifting tube disposes first bearing and second bearing, and spring base fits over the medium position of a side of lifting tube.The cylinder body afterbody of locking cylinder is hinged on second bearing, and the piston rod head of locking cylinder is hinged on an end of lever, and the middle part fulcrum of lever is hinged on first bearing, and the other end of lever and pull bar one is hinged.Brake rod becomes vertical assembling with lifting tube after passing wall hole on the lifting tube, and the other end of brake rod becomes same axis with the core bar that spring is housed, and brake rod, core bar and pull bar are hinged and connected by one.That the keep plate that stretches into the brake rod of lifting tube inner chamber is in the guide groove inboard of vertical beam.Be sleeved on spring position on the core bar outside spring base.There is the nut retainer spring termination of core bar.
A kind of hot-metal bottle break device that is used to measure molten iron temperature and sample analysis that adopts that as above technical scheme provides compared with prior art, technique effect is:
1. can finish the break task effectively, realize the break function.Former cause ARTIFICIAL FORCE amount thick slag, the grit that can not break less than normal now adopts the motor-driven break of liquid transmission (driving) cylinder (or hydraulic cylinder), and strength is big, can break thick slag, grit;
2. when configuration temperature measuring head and sampling head, can finish thermometric and sampling work, alleviate labour intensity molten iron.
Description of drawings
Accompanying drawing is a kind of hot-metal bottle break apparatus structure synoptic diagram that is used to measure molten iron temperature and sample analysis described in the utility model, also is Figure of abstract of the present utility model.
Embodiment
Below in conjunction with accompanying drawing embodiment of the present utility model is described in further detail.
As shown in drawings, a kind of hot-metal bottle break device that is used to measure molten iron temperature and sample analysis described in the utility model comprises frame 1, translation cylinder 2, translation beam 3, guide wheel 4, vertical beam 5, nut 6, spring 7, core bar 8, pull bar 9, lever 10, locking cylinder 11, first bearing 12, second bearing 13, lifting tube 14, lift cylinders 15, break cylinder 16, brake rod 17, spring base 20, dregs breaking head 21.Wherein be made of the adjustment member of horizontal range of the present utility model frame 1, translation cylinder 2, translation beam 3, guide wheel 4, it is realized by the translation that fluid (as hydraulic oil) transmission drives translation beam 3; And mainly constitute vertical adjustment member apart from note by lifting tube 4 and brake rod 17 etc.
Its cylinder body afterbody is fixed in the inside that 2 one-tenth horizontalitys of translation cylinder on the frame 1 are placed on translation beam 3, the piston rod head of translation cylinder 2 is fixed in the inner chamber of translation beam 3,3 one-tenth horizontal directions of translation beam are installed in quantity and are equal to or greater than the space (this case shows the space that is made of four guide wheels 4) that four guide wheel 4 constitutes, and each guide wheel 4 is affixed with frame 1.Four guide wheels 4 can retrain translation beam 3 about, and distance of separation is arranged in the stage casing of translation beam 3.Translation beam 3 vertically is fixed in the outer wall of vertical beam 5.When translation cylinder 2 under the hydraulic oil effect, the piston rods in the translation cylinder 2 can drive translation beam 3 (or left) motion to the right, (or left) to the right motion of translation beam 3 drives vertical beam 5 (or left) motion to the right.Lifting tube 14 is sleeved on the periphery of vertical beam 5 upper ends, the inboard of vertical beam 5 upper ends is processed with guide groove 19, lift cylinders 15 is equipped with in the inside of vertical beam 5, and the cylinder body afterbody of lift cylinders 15 is cemented in the vertical beam 5, and the piston rod end of lift cylinders 15 is cemented in the top of lifting tube 14 inner chambers.Piston rod under the hydraulic oil effect in (under the fluid drives) lift cylinders 15 do the oscilaltion campaign drive lifting tube 14 along the outer wall of vertical beam 5 do the oscilaltion campaign.Dispose vertically downward break cylinder 16 in a side of lifting tube 14, of piston rod who stretches out break cylinder 16 is equipped with dregs breaking head 21 (or temperature measuring head), and the other end of piston rod is cemented in the inner chamber of break cylinder 16.Break cylinder 16 can be broken slag blanket if break cylinder 16 moves down the grit layer that dregs breaking head 21 can be inserted on the hot-metal bottle with the moving up and down and move up and down of lifting tube 14, and meanwhile temperature measuring head can be to the molten iron thermometric.Opposite side upper end at lifting tube 14 disposes first bearing 12 and second bearing 13, the cylinder body afterbody of locking cylinder 11 is hinged on second bearing 13, and the piston rod head of locking cylinder 11 is hinged on an end of lever 10, the middle part fulcrum of lever 10 is hinged on second bearing 12, the other end of lever 10 and pull bar 9 one is hinged, the other end of pull bar 9 and core bar 8, brake 17 hinged, brake rod 17 passes behind the wall hole on the lifting tube 14 and 14 one-tenth vertical assemblings of lifting tube, the 8 one-tenth same axis in the other end of brake rod 17 and the core bar that is set with spring 7, be sleeved on spring 7 positions on the core bar 8 outside spring base 20, spring base 20 is configured in the medium position of lifting tube 14 1 sides.There are nut 6 retainer springs 7 termination of core bar 8, and the keep plate that stretches into the brake rod 17 of lifting tube 14 inner chambers is in the guide groove inboard on vertical beam 5 tops.
When lifting tube 14 moves downward desired location, make locking cylinder 11 action withdrawal piston rods in (or under fluid drives) under the hydraulic oil effect, the action of piston rod drives lever 10, pull bar 9 actions brake rod 17 is promoted to move and the inwall that makes keep plate on the brake rod 17 be close to lifting tube 14 is earlier accurately located lifting tube 14 to the left side as shown in drawings.
After finishing in the thick slag of 21 pairs of hot-metal bottles of dregs breaking head or grit break the molten iron sample analysis or the temperature test work of hot-metal bottle (or to), start locking cylinder 11 respectively and stretch out brake rod 17, startup lift cylinders 15 is mentioned lifting tube 14 makes dregs breaking head 21 leave hot-metal bottle, start translation cylinder 2 drive translation beams 3 and vertical beam 5 to moving, finish a working routine as the figure left side.So circulation reaches purpose described in the utility model.

Claims (1)

1, a kind of hot-metal bottle break device that is used to measure molten iron temperature and sample analysis, comprise frame (1), translation cylinder (2), translation beam (3), guide wheel (4), vertical beam (5), nut (6), spring (7), core bar (8), pull bar (9), lever (10), locking cylinder (11), first bearing (12), second bearing (13), lifting tube (14), lift cylinders (15), break cylinder (16), brake rod (17), spring base (20) and dregs breaking head (21), it is characterized in that: the translation cylinder (2) that the cylinder body afterbody is fixed on the frame (1) becomes horizontality to be placed on the inside of translation beam (3), the piston rod head of translation cylinder (2) is fixed in the inner chamber of translation beam (3), translation beam (3) becomes horizontal direction to be installed in quantity to be equal to or greater than in the space that four guide wheel (4) constitutes, and each guide wheel (4) is affixed with frame (1); Translation beam (3) vertically is fixed in the outer wall of vertical beam (5); Lifting tube (14) is sleeved on the periphery of vertical beam (5) upper end, the inboard of vertical beam (5) upper end is processed with guide groove (19), lift cylinders (15) is equipped with in the inside of vertical beam (5), the cylinder body afterbody of lift cylinders (15) is cemented in the vertical beam (5), and the piston rod end of lift cylinders (15) is cemented in the top of lifting tube (14) inner chamber; Dispose vertically downward break cylinder (16) in a side of lifting tube (14), of piston rod who stretches out break cylinder (16) is equipped with dregs breaking head (21), and the other end of piston rod is cemented in the inner chamber of break cylinder (16); Opposite side upper end at lifting tube (14) disposes first bearing (12) and second bearing (13), the cylinder body afterbody of locking cylinder (11) is hinged on second bearing (13), the piston rod head of locking cylinder (11) is hinged on an end of lever (10), the middle part fulcrum of lever (10) is hinged on first bearing (12), the other end of lever (10) and pull bar (9) one is hinged, the other end of pull bar (9) and core bar (8), brake rod (17) is hinged, brake rod (17) becomes vertical assembling with lifting tube (14) after passing wall hole on the lifting tube (14), the other end of brake rod (17) becomes same axis with the core bar that is set with spring (7) (8), be sleeved on spring (7) position on the core bar (8) outside spring base (20), there is nut (6) retainer spring (7) termination of core bar (8).
CNU2008200533805U 2008-06-04 2008-06-04 Slag breaking device of melt iron tank for measuring temperature of melt iron and sample analysis Expired - Fee Related CN201210095Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200533805U CN201210095Y (en) 2008-06-04 2008-06-04 Slag breaking device of melt iron tank for measuring temperature of melt iron and sample analysis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200533805U CN201210095Y (en) 2008-06-04 2008-06-04 Slag breaking device of melt iron tank for measuring temperature of melt iron and sample analysis

Publications (1)

Publication Number Publication Date
CN201210095Y true CN201210095Y (en) 2009-03-18

Family

ID=40480832

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200533805U Expired - Fee Related CN201210095Y (en) 2008-06-04 2008-06-04 Slag breaking device of melt iron tank for measuring temperature of melt iron and sample analysis

Country Status (1)

Country Link
CN (1) CN201210095Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108746516A (en) * 2018-06-07 2018-11-06 武汉科技大学 A kind of ladle thermometric sampler
CN111707387A (en) * 2020-06-24 2020-09-25 广东韶钢松山股份有限公司 Refining furnace temperature measuring gun lifting device and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108746516A (en) * 2018-06-07 2018-11-06 武汉科技大学 A kind of ladle thermometric sampler
CN108746516B (en) * 2018-06-07 2019-11-08 武汉科技大学 A kind of ladle thermometric sampler
CN111707387A (en) * 2020-06-24 2020-09-25 广东韶钢松山股份有限公司 Refining furnace temperature measuring gun lifting device and method

Similar Documents

Publication Publication Date Title
RU2351433C1 (en) Pouring ladle trolley with lifting gear
CN102717039A (en) Automatic plate blank continuous casting machine tundish pouring method and automatic pouring system
CN103162986B (en) Slag sampler and its use method
CN110508769B (en) Copper alloy vacuum water-cooling continuous casting equipment
CN201210095Y (en) Slag breaking device of melt iron tank for measuring temperature of melt iron and sample analysis
CN211374167U (en) Continuous different depth molten steel sampler
CN110860679A (en) LF furnace steel ladle covering and uncovering device and using method thereof
CN103240408A (en) Hydraulic turnover device of hot metal ladle
CN205851862U (en) Swinging steel ladle covering/uncovering device
KR20110088070A (en) Probe of sublance for converter
CN103223482A (en) Device for capping and decapping steel ladle
CN216502291U (en) Full-automatic casting device for aluminum round ingot
CN202033219U (en) Molten steel sampler for electrolysis of small sample
Little et al. Factors affecting the reoxydation of molten steel during continuous casting
CN202420895U (en) Slag sampler
CN209550590U (en) A kind of positioning of continuous casting production vehicle weighing frame and high-speed adjustment device
CN201534881U (en) Guide device of slag remover
CN2848423Y (en) Continuous casting plug rod control flow and fast changing pouring basket gate mechanism
CN206767541U (en) RH vacuum refining ladle lowering or hoisting gears
CN208004789U (en) A kind of steel ladle capping drive car
CN208432414U (en) A kind of melting sampling car
Kurz About initial solidification in continuous casting of steel
CN111197971A (en) Automatic centering and weighing system for material rod of electroslag remelting furnace
SU846077A1 (en) Apparatus for protecting metal jet from ladle at metal continuous casting
CN217252794U (en) Continuous casting tundish arm beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090318

Termination date: 20130604