CN201197059Y - Cable winding/unwinding apparatus - Google Patents
Cable winding/unwinding apparatus Download PDFInfo
- Publication number
- CN201197059Y CN201197059Y CNU2008200126207U CN200820012620U CN201197059Y CN 201197059 Y CN201197059 Y CN 201197059Y CN U2008200126207 U CNU2008200126207 U CN U2008200126207U CN 200820012620 U CN200820012620 U CN 200820012620U CN 201197059 Y CN201197059 Y CN 201197059Y
- Authority
- CN
- China
- Prior art keywords
- disc
- cable
- cable reel
- speed control
- rolling bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a cable reel unwinding device in the field of building electrical instrument engineering construction. The unwinding device consists of an upper chassis, a lower chassis, a rolling bearing and a speed control device; the rolling bearing is arranged between the upper chassis and the lower chassis; the outer edge part of the rolling bearing is provided with the speed control device; the speed control device is arranged between the upper chassis and the lower chassis; and on the central position of the upper chassis, a steel pipe preventing a cable reel from leaping is vertically welded to the upper chassis. Compared with the prior art, the unwinding device has the advantages of simple structure, low cost, high work efficiency, labor power conservation and material conservation. After the cable reel is lifted and horizontally placed on the cable reel unwinding device through a crane, the cable reel can be held up only by one person, and the person can also control the rotation speed of the cable reel simultaneously, thereby avoiding the phenomenon that cables fall off because of excessively strong tensile force.
Description
Technical field
The utility model relates to the cable coil putting device in the architectural electricity instrumentation engineering construction field.
Background technology
Payout is one of very important work of electric meter construction enterprises, puts power cable in the prior art and generally by crane cable hank is sling and set level, and is holding up cable hank by two people or a plurality of people, rotates by the rotation that pulling force makes cable hank pass through suspension hook.Crane takies always simultaneously, has put until cable.Payout pulling force sometimes is excessive, makes the cable hank rotation too fast, holds up the personnel of cable hank to lose control of the cable hank rotary speed, cable is come off from cable hank, but also the personnel that might cause injures and damage cable.
In a word, the shortcoming that traditional payout method exists is: waste of manpower, material resources, cause personal injury easily, and also might damage cable.
Summary of the invention
The purpose of this utility model is in order to solve the deficiencies in the prior art part, a kind of simple in structure, high efficiency is provided, uses manpower and material resources sparingly and cable coil putting device that can the control cable disc spin speed.
For achieving the above object, the utility model is realized by the following technical solutions:
Cable coil putting device, form by top bottom-disc, low bottom-disc, rolling bearing, speed control unit, between top bottom-disc and low bottom-disc, be provided with rolling bearing, be provided with speed control unit in the rolling bearing edge portion, speed control unit is located between top bottom-disc and the low bottom-disc, and center and top bottom-disc vertical welding are connected to the steel pipe that prevents the cable hank play on top bottom-disc.
Speed control unit is made up of rubber brake sheet, back-moving spring, pole, control lever, pedal, support bar, and the rubber brake sheet is by control lever connecting pin pedal, and the control lever bottom is provided with pole, and pole is welded on the low bottom-disc; Between pole and rubber brake sheet, be provided with back-moving spring, be provided with support bar in rubber brake sheet bottom.
Compared with prior art, the beneficial effects of the utility model are:
Simple in structure, cost is low, high efficiency, use manpower and material resources sparingly.With crane cable hank being sling lies on the cable coil putting device, holds up cable hank to get final product with a people, and also may command cable hank rotary speed of this person has avoided the excessive cable obscission of Yin Lali to take place simultaneously.
Description of drawings
Fig. 1 is the structural representation of cable coil putting device.
Fig. 2 is the structural representation of speed control unit.
Among the figure: 1, top bottom-disc 2, rolling bearing 3, low bottom-disc 4, speed control unit 4-1, rubber brake sheet 4-2, back-moving spring 4-3, pole 4-4, control lever 4-5, pedal 4-6, support bar 5, cable hank 6, steel pipe
Embodiment
See Fig. 1, cable coil putting device, form by top bottom-disc 1, low bottom-disc 3, rolling bearing 2, speed control unit 4, between top bottom-disc 1 and low bottom-disc 3, be provided with rolling bearing 2, be provided with speed control unit 4 in rolling bearing 2 outer edge, speed control unit 4 is located between top bottom-disc 1 and the low bottom-disc 3, the control cable disc spin speed that this device can be artificial, the loss of having avoided the excessive cable of Yin Lali to come off and cause.Center and top bottom-disc vertical welding are connected to the steel pipe 6 that prevents cable hank 5 plaies on top bottom-disc 1.
See Fig. 2, speed control unit 4 is made up of rubber brake sheet 4-1, back-moving spring 4-2, pole 4-3, control lever 4-4, pedal 4-5, support bar 4-6, rubber brake sheet 4-1 is by control lever 4-4 connecting pin pedal 4-5, control lever 4-4 bottom is provided with pole 4-3, and pole is welded on the low bottom-disc 3; Between pole 4-3 and rubber brake sheet 4-1, be provided with back-moving spring 4-2, be provided with support bar 4-6 in rubber brake sheet 4-1 bottom.
When using this device to carry out the cable hank unwrapping wire, cable hank 5 is placed on the top bottom-disc 1, cable hank 5 centre bores and steel pipe 6 are pegged graft, and give cable by the application of force, because the effect of rolling bearing 2, can require great effort can be with the cable hank unwrapping wire.When stopping, foot-treadle 4-5, the effect by pole 4-3 (balance pivot) passes to rubber brake sheet 4-1 by control lever 4-4 with power, and rubber brake sheet 4-1 moves upward, and rubber brake sheet 4-1 contacts top bottom-disc 1, the speed of control cable disc spins.During return, back-moving spring 4-2 plays reset response.
This device can arbitrarily be adjusted control lever according to unwrapping wire cable hank size, and the rubber brake sheet can be changed at any time.
Claims (3)
1, cable coil putting device, it is characterized in that, this device is made up of top bottom-disc, low bottom-disc, rolling bearing, speed control unit, between top bottom-disc and low bottom-disc, be provided with rolling bearing, be provided with speed control unit in the rolling bearing edge portion, speed control unit is located between top bottom-disc and the low bottom-disc.
2, cable coil putting device according to claim 1 is characterized in that, center and top bottom-disc vertical welding are connected to the steel pipe that prevents the cable hank play on top bottom-disc.
3, cable coil putting device according to claim 1, it is characterized in that, described speed control unit is made up of rubber brake sheet, back-moving spring, pole, control lever, pedal, support bar, the rubber brake sheet is by control lever connecting pin pedal, the control lever bottom is provided with pole, and pole is welded on the low bottom-disc; Between pole and rubber brake sheet, be provided with back-moving spring, be provided with support bar in rubber brake sheet bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200126207U CN201197059Y (en) | 2008-05-12 | 2008-05-12 | Cable winding/unwinding apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200126207U CN201197059Y (en) | 2008-05-12 | 2008-05-12 | Cable winding/unwinding apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201197059Y true CN201197059Y (en) | 2009-02-18 |
Family
ID=40416688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200126207U Expired - Fee Related CN201197059Y (en) | 2008-05-12 | 2008-05-12 | Cable winding/unwinding apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201197059Y (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101905828A (en) * | 2010-08-19 | 2010-12-08 | 上海市基础工程有限公司 | Cable turntable |
CN102055148B (en) * | 2009-10-30 | 2013-12-25 | 国家电网公司 | Electric pay-off rack |
CN103683115A (en) * | 2012-09-07 | 2014-03-26 | 中国葛洲坝集团机械船舶有限公司 | Electric cable laying device |
CN103825226A (en) * | 2014-03-20 | 2014-05-28 | 国家电网公司 | Cable pay-off reel and manufacturing method thereof |
CN104460674A (en) * | 2014-12-01 | 2015-03-25 | 衡阳合力工业车辆有限公司 | Motor tractor and driving control system thereof |
CN105429057A (en) * | 2015-12-01 | 2016-03-23 | 国网河南栾川县供电公司 | Cable laying device |
-
2008
- 2008-05-12 CN CNU2008200126207U patent/CN201197059Y/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102055148B (en) * | 2009-10-30 | 2013-12-25 | 国家电网公司 | Electric pay-off rack |
CN101905828A (en) * | 2010-08-19 | 2010-12-08 | 上海市基础工程有限公司 | Cable turntable |
CN103683115A (en) * | 2012-09-07 | 2014-03-26 | 中国葛洲坝集团机械船舶有限公司 | Electric cable laying device |
CN103825226A (en) * | 2014-03-20 | 2014-05-28 | 国家电网公司 | Cable pay-off reel and manufacturing method thereof |
CN103825226B (en) * | 2014-03-20 | 2016-09-07 | 国家电网公司 | A kind of paying out drum and manufacture method thereof |
CN104460674A (en) * | 2014-12-01 | 2015-03-25 | 衡阳合力工业车辆有限公司 | Motor tractor and driving control system thereof |
CN105429057A (en) * | 2015-12-01 | 2016-03-23 | 国网河南栾川县供电公司 | Cable laying device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201197059Y (en) | Cable winding/unwinding apparatus | |
CN105460826A (en) | Lifting device for electric power maintenance | |
CN101580192A (en) | Cable coil putting device | |
CN203531496U (en) | Falling type double-holding-rod pole erecting device | |
CN210313196U (en) | Climbing cable hoisting system | |
CN202016812U (en) | Hoist frame used at window | |
CN209161324U (en) | It is a kind of it is for building with function of weighing overload can intelligent reminding hanging equipment | |
CN103738861A (en) | Integral hoisting method for A type column of steel pipe of ultra-high voltage transformer station | |
CN203558395U (en) | Hoisting mechanism of stacker loading platform | |
CN206232339U (en) | A kind of small-sized lifting machine for building | |
CN206799058U (en) | A kind of city power distribution power network weight transfer device | |
CN202829361U (en) | Small-size hoisting machine | |
CN201907924U (en) | Spreading wing-type winding drum lifting device | |
CN202558444U (en) | Steel penstock hoisting balance beam device | |
CN111634798B (en) | Anti-deformation hoisting base of cloth bag type switch cabinet and hoisting method thereof | |
CN106364994A (en) | Waste cable recoverer | |
CN206680024U (en) | Anti-falling safety device for construction lift scene resetting means | |
CN205114898U (en) | Tower owner hangs antiwind device of wire rope | |
CN106364980A (en) | Distribution cable recovery device | |
CN204588361U (en) | Elevator governor is de-rope dress rope device fast | |
CN108489727A (en) | Dual slope reel steel wire ropes multi-lay winding system performance detection device and detection method | |
CN212503707U (en) | Maintenance crane of wind generating set | |
CN209702165U (en) | A kind of cement chassis boom hoisting | |
CN206156589U (en) | Transport lifting hook that electric power pole was used | |
CN214590225U (en) | Portable pay-off auxiliary frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090218 Termination date: 20150512 |
|
EXPY | Termination of patent right or utility model |