CN201190108Y - Fluidized bed chlorination furnace - Google Patents

Fluidized bed chlorination furnace Download PDF

Info

Publication number
CN201190108Y
CN201190108Y CN 200820300312 CN200820300312U CN201190108Y CN 201190108 Y CN201190108 Y CN 201190108Y CN 200820300312 CN200820300312 CN 200820300312 CN 200820300312 U CN200820300312 U CN 200820300312U CN 201190108 Y CN201190108 Y CN 201190108Y
Authority
CN
China
Prior art keywords
furnace
sieve plate
furnace bottom
stationary installation
boiling chloridizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200820300312
Other languages
Chinese (zh)
Inventor
陆平
程晓哲
杨仰军
黄家旭
杨文�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panzhihua Iron and Steel Group Corp
Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd
Original Assignee
Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd filed Critical Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd
Priority to CN 200820300312 priority Critical patent/CN201190108Y/en
Application granted granted Critical
Publication of CN201190108Y publication Critical patent/CN201190108Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a boiling chlorination furnace which can adapt various grades of raw materials and has extensive applicability. The boiling chlorination furnace comprises a furnace top (1), a furnace body (2) and a furnace bottom (3), wherein, an air inlet (6) and a slag discharging hole (7) are arranged on the furnace bottom (3), and a screen plate (4) detachably connected with the furnace bottom (3) is arranged on the furnace bottom (3). The screen plate (4) can be connected with the furnace bottom (3) through a screen plate fixing device arranged on the furnace bottom (3). Through separating the screen plate (4), the switchover between the screen plate furnace building mode and the non-screen plate furnace building mode can be realized by disassembling and assembling the screen plate (4) so as to achieve the effect that one furnace has multiple functions, and effectively improve the flexibility and the adaptability of the boiling chlorination furnace, the chlorination furnace can be ensured to use the chlorination materials of greatly different grades, and the process condition can be correspondingly changed. The furnace is especially suitable for the chlorination field of the titanium-containing raw material.

Description

Boiling chloridizing furnace
Technical field
The utility model relates to a kind of chloridization process production unit, the boiling chloridizing furnace that especially a kind of chlorination titaniferous materials is used.
Background technology
In the fluidizing chlorination explained hereafter, boiling chloridizing furnace is the nucleus equipment of this technology, and the design of boiling chloridizing furnace furnace bottom is the emphasis place of problems such as the distribution of control air-flow, bed depth, fluidized state.Generally speaking, industrial boiling chloridizing furnace comprises furnace roof, shaft and furnace bottom few component parts.According to furnace bottom part mounted sieve whether, boiling chloridizing furnace can be divided into two kinds of sieve plate boiling chloridizing furnace and fluidized bed chlorinator without perforated-plate are arranged.When the titaniferous materials that adopts low calcium and magnesium content carried out chlorination, the general employing had the sieve plate boiling chloridizing furnace, helps being evenly distributed of gas; When the titaniferous materials of high contents of calcium and magnesium content is carried out chlorination, generally adopt fluidized bed chlorinator without perforated-plate, realize the smooth and easy operation when boiling chloridizing furnace uses the high contents of calcium and magnesium raw material.No matter be the boiling chloridizing furnace that sieve plate is arranged or do not have sieve plate, after in a single day body of heater built up, its employed raw material and technology were just definite, can't change, and lacked extensive applicability.
The utility model content
Lack extensive adaptive deficiency to raw material in order to overcome existing boiling chloridizing furnace, technical problem to be solved in the utility model provides a kind of grade raw materials at different levels that can adapt to, the boiling chloridizing furnace with broad applicability.
The technical scheme that its technical problem that solves the utility model adopts is: boiling chloridizing furnace, comprise furnace roof, shaft and furnace bottom, and furnace bottom is provided with inlet mouth and slag-drip opening, and furnace bottom is provided with the sieve plate that removably connects with furnace bottom.
The beneficial effects of the utility model are: by sieve plate is separated, can realize that sieve plate is arranged and do not have sieve plate and build switching between the stove pattern by the dismounting sieve plate, realize multi-use, can improve the handiness and the adaptability of boiling chloridizing furnace effectively, make this chlorination furnace can use the widely different chlorizated raw material of grade, and change processing condition accordingly.
Description of drawings
Fig. 1 is a front view of the present utility model.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the synoptic diagram of sieve plate stationary installation.
Fig. 4 is the right view of Fig. 3.
Fig. 5 is the B-B sectional view of Fig. 4.
Fig. 6 is the synoptic diagram of another sieve plate stationary installation.
Fig. 7 is the left view of Fig. 6.
Fig. 8 is the C-C sectional view of Fig. 7.
Fig. 9 is the synoptic diagram of sieve plate.
Figure 10 is that the utility model adopts the synoptic diagram of ceramic ring as the sieve plate stationary installation.
Be labeled as among the figure, the 1-furnace roof, the 2-shaft, the 3-furnace bottom, the 4-sieve plate, the 5-liner plate, 5 '-liner plate, 6-inlet mouth, 7-slag-drip opening, 8-mud hole, 9-sieve plate pickup groove, 10-step, 11-ceramic ring group, the ceramic ring of 12-band mud hole, 13-sealing.
Embodiment
Below in conjunction with accompanying drawing the utility model is further specified.
As Fig. 1~shown in Figure 9, boiling chloridizing furnace of the present utility model, comprise furnace roof 1, shaft 2 and furnace bottom 3, furnace bottom 3 is provided with inlet mouth 6 and slag-drip opening 7, furnace bottom 3 is provided with the sieve plate 4 that removably connects with furnace bottom 3, thereby can change the sieve plate 4 that adapts with raw material easily according to the difference of raw material, perhaps removes sieve plate 4, to improve the adaptability of boiling chloridizing furnace, save and build the stove cost.
As shown in Figure 1, in order to simplify the manufacturing of furnace bottom 3, sieve plate 4 is connected on the furnace bottom 3 by the sieve plate stationary installation, and the sieve plate stationary installation is provided with the mud hole 8 suitable with slag-drip opening 7.
As shown in Figure 1, more convenient in order to make on furnace bottom 3 mounted sieve 4 and fixed screen deck stationary installation, adopt flange to connect between furnace bottom 3 and the shaft 2.When need changing or removing the used sieve plate 4 of furnace bottom 3, earlier furnace roof 1 and shaft 2 are separated with furnace bottom 3, operate accordingly again, very convenient, and be convenient to the maintenance and the maintenance of body of heater.
As shown in Figure 1, considering comes into operation body of heater the back is general inconvenient operates from the furnace bottom lower end, and furnace bottom 3 is provided with step 10, and described sieve plate stationary installation is arranged on the step 10.During operation, convenient the sieve plate stationary installation is spacing by step from furnace bottom upper end mounted sieve stationary installation, is easy to guarantee to be in place.
As Fig. 3~shown in Figure 8, the sieve plate stationary installation is provided with at least two group sieve plate fixed sturctures, can make sieve plate adjust its relative height according to processing requirement, to adapt to the variation of raw material variation back corresponding process parameters such as air-flow distribution, bed depth, fluidized state etc., improve the efficient of boiling chloridizing furnace.
As Fig. 3~shown in Figure 8, the sieve plate stationary installation be the suitable semi-circular liner plate 5,5 of a pair of and furnace bottom 3 internal diameters ', the sieve plate fixed sturcture is a sieve plate pickup groove 9, this is to liner plate 5,5 ' be combined to form hollow cylinder, and be bearing on the step 10, this to liner plate 5,5 ' on sieve plate pickup groove 9 suitable with sieve plate 4, wherein a liner plate 5 is provided with mud hole 8.During installation, earlier sieve plate 4 is fit into this, with liner plate 5,5 ' be installed on the step 10 slag-drip opening 7 that mud hole 8 is aimed on the furnace bottoms 3 to liner plate 5,5 ' go up in corresponding sieve plate pickup groove 9.Carrying out inverse operation during dismounting gets final product.
Described sieve plate stationary installation also can adopt the ceramic ring group of forming with the suitable ceramic ring of furnace bottom 3 internal diameters by at least two 11, and mud hole 8 is arranged on one of them ceramic ring 12, and sieve plate 4 is installed between the ceramic ring.During installation, earlier sieve plate 4 is bearing on the step 10, reinstalls ceramic ring, behind the sieve plate 4 of packing into, reinstall the ceramic ring 12 of band mud hole 8 and make mud hole 8 aim at slag-drip opening 7.As required, can adjust the number of the ceramic ring between sieve plate 4 and ceramic ring 12, the step 10, thereby adjust the installation site of sieve plate 4.
When sieve plate 4 is installed by the sieve plate stationary installation, also can be between sieve plate 4 and described sieve plate stationary installation, and sealing 13 is set between sieve plate stationary installation and the furnace bottom 3.Sealing 13 can be adopted annular graphite grazing, and is softer because of graphite matter, can protect contact surface.

Claims (10)

1. boiling chloridizing furnace comprises furnace roof (1), shaft (2) and furnace bottom (3), and furnace bottom (3) is provided with inlet mouth (6) and slag-drip opening (7), it is characterized in that: furnace bottom (3) is provided with the sieve plate (4) that removably connects with furnace bottom (3).
2. boiling chloridizing furnace as claimed in claim 1 is characterized in that: sieve plate (4) is connected on the furnace bottom (3) by the sieve plate stationary installation, and the sieve plate stationary installation is provided with and the suitable mud hole (8) of slag-drip opening (7).
3. boiling chloridizing furnace as claimed in claim 2 is characterized in that: connect for flange between furnace bottom (3) and the shaft (2).
4. as claim 2 or 3 described boiling chloridizing furnaces, it is characterized in that: furnace bottom (3) is provided with step (10), and described sieve plate stationary installation is arranged on the step (10).
5. boiling chloridizing furnace as claimed in claim 4 is characterized in that: the sieve plate stationary installation is provided with at least two group sieve plate fixed sturctures.
6. boiling chloridizing furnace as claimed in claim 4, it is characterized in that: the sieve plate stationary installation is a pair of and the suitable semi-circular liner plate (5 of furnace bottom (3) internal diameter, 5 '), the sieve plate fixed sturcture is sieve plate pickup groove (9), and this is combined to form hollow cylinder to liner plate (5,5 '), and be bearing on the step (10), suitable to sieve plate pickup groove (9) on the liner plate (5,5 ') and sieve plate (4) at this, wherein a liner plate (5) is provided with mud hole (8).
7. boiling chloridizing furnace as claimed in claim 4 is characterized in that: the sieve plate stationary installation is and the suitable ceramic ring group of furnace bottom (3) internal diameter.
8. boiling chloridizing furnace as claimed in claim 4, it is characterized in that: sieve plate stationary installation at least two the ceramic ring groups of forming with the suitable ceramic ring of furnace bottom (3) internal diameter (11) of serving as reasons, mud hole (8) is arranged on one of them ceramic ring (12), and sieve plate (4) is installed between the ceramic ring.
9. boiling chloridizing furnace as claimed in claim 2 is characterized in that: between sieve plate (4) and the described sieve plate stationary installation, and be provided with sealing (13) between sieve plate stationary installation and the furnace bottom (3).
10. boiling chloridizing furnace as claimed in claim 9 is characterized in that: annular graphite grazing is adopted in sealing (13).
CN 200820300312 2008-03-06 2008-03-06 Fluidized bed chlorination furnace Expired - Fee Related CN201190108Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200820300312 CN201190108Y (en) 2008-03-06 2008-03-06 Fluidized bed chlorination furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200820300312 CN201190108Y (en) 2008-03-06 2008-03-06 Fluidized bed chlorination furnace

Publications (1)

Publication Number Publication Date
CN201190108Y true CN201190108Y (en) 2009-02-04

Family

ID=40334267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200820300312 Expired - Fee Related CN201190108Y (en) 2008-03-06 2008-03-06 Fluidized bed chlorination furnace

Country Status (1)

Country Link
CN (1) CN201190108Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103950973A (en) * 2014-04-23 2014-07-30 攀钢集团攀枝花钢铁研究院有限公司 Low-temperature fluidizing chlorination method and low-temperature fluidizing chlorination furnace
CN104925855A (en) * 2015-06-01 2015-09-23 攀钢集团攀枝花钢铁研究院有限公司 Preparation method of TiCxOy
CN105903415A (en) * 2016-06-27 2016-08-31 攀钢集团攀枝花钢铁研究院有限公司 Low-temperature boiling chlorination furnace provided with multiple fluidization chambers
CN105984895A (en) * 2015-02-02 2016-10-05 云南新立有色金属有限公司 Baking system of boiling chlorination furnace

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103950973A (en) * 2014-04-23 2014-07-30 攀钢集团攀枝花钢铁研究院有限公司 Low-temperature fluidizing chlorination method and low-temperature fluidizing chlorination furnace
CN103950973B (en) * 2014-04-23 2015-09-16 攀钢集团攀枝花钢铁研究院有限公司 Low-temperature boiling chlorination method and low-temperature boiling chlorination furnace
CN105984895A (en) * 2015-02-02 2016-10-05 云南新立有色金属有限公司 Baking system of boiling chlorination furnace
CN104925855A (en) * 2015-06-01 2015-09-23 攀钢集团攀枝花钢铁研究院有限公司 Preparation method of TiCxOy
CN105903415A (en) * 2016-06-27 2016-08-31 攀钢集团攀枝花钢铁研究院有限公司 Low-temperature boiling chlorination furnace provided with multiple fluidization chambers

Similar Documents

Publication Publication Date Title
CN201190108Y (en) Fluidized bed chlorination furnace
CN102774880B (en) Device of boiling chlorination furnace for continuous slagging and slagging method
CN103818951B (en) Boiling chlorination furnace adapting to fine-graded titanium-rich material
CN107226627A (en) A kind of two grades of suspension calcining devices of active powder lime
CN2923014Y (en) Boiling chlorination furnace with sieving plate
CN103896275A (en) Plasma refining and purifying furnace for producing solar energy polysilicon through metallurgy method
CN104860317B (en) The equipment that a kind of cold hydrogenization method prepares trichlorosilane
CN207002588U (en) A kind of active powder lime two level suspension calcining device
CN206940740U (en) A kind of active powder lime suspension calcining device
CN102407338A (en) Gas atomization device for preparing superfine spherical metal powder with low oxygen content
CN104212469A (en) Pyrolysis, dust removal and catalytic conditioning integrated reaction device
CN104159349B (en) A kind of anti-oxidant carbonaceous electrode of large diameter that adds additive and preparation method thereof
CN201431874Y (en) Spiral fluidizing chlorination furnace without sieve plates
CN205953860U (en) High -efficient lime burning stove
CN206318336U (en) A kind of bucket elevator feed hopper
CN109136428B (en) Dry-method horizontal rotary type smelting steel slag treatment equipment and waste heat recovery method
CN101497015A (en) Cone gas distributor for fluidized bed
AU2008267440A1 (en) Process and apparatus for producing iron sponge
CN108168292B (en) Multifunctional environment-friendly BSK sintering technology shaft kiln and use method thereof
CN1454849A (en) Apparatus and method of preparing titanium tetrachloride for chlorination of titanium-containing mineral
CN1751132A (en) An apparatus for manufacturing molten irons by hot compacting fine direct reduced irons and calcined additives and method using the same
CN214004702U (en) Device for strengthening central gas flow of reduction furnace of Ou metallurgical furnace
CN204672455U (en) The cone rotary drum that a kind of band is forged a knife
CN201376085Y (en) Tundish dual effect flow-stabilizing cushion
CN2804101Y (en) Coal distributor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090204

Termination date: 20160306

CF01 Termination of patent right due to non-payment of annual fee