CN201184022Y - Structure connecting out-roofing high temperature steel chimney and concrete roofing - Google Patents
Structure connecting out-roofing high temperature steel chimney and concrete roofing Download PDFInfo
- Publication number
- CN201184022Y CN201184022Y CN 200820012062 CN200820012062U CN201184022Y CN 201184022 Y CN201184022 Y CN 201184022Y CN 200820012062 CN200820012062 CN 200820012062 CN 200820012062 U CN200820012062 U CN 200820012062U CN 201184022 Y CN201184022 Y CN 201184022Y
- Authority
- CN
- China
- Prior art keywords
- roof
- steel
- chimney
- steel chimney
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a connection structure of a steel chimney and a concrete roof, particularly relates to a connection structure of an out-roof high temperature steel chimney and the concrete roof, which is suitable for a boiler room. The connection structure of the out-roof high temperature steel chimney and the concrete roof comprises a steel chimney wall and a roof slab. A ring beam is arranged below the periphery of an opening where the steel chimney penetrates through the roof slab, a reverse edge of the roof slab is arranged on the ring beam at the periphery of the opening, a fire brick is arranged between the steel chimney wall and the reverse edge of the roof slab, a flat steel bracket is arranged between the ring beam and the steel chimney wall, and an angle steel bracket is arranged between the reverse edge of the roof slab and the steel chimney wall. The connection structure of the out-roof high temperature steel chimney and the concrete roof can efficiently solve the problems of crack and roof structure damage caused by the high temperature chimney on the passed concrete roof, strengthens the pulling and connecting stability of the high temperature chimney and the roof slab, and has the advantages of simple construction, convenient maintenance, structured appearance, low cost and long service life.
Description
Technical field
The utility model relates to the structure that steel stack is connected with concrete roof, particularly relates to a kind of suitable boiler room and goes out the structure that roofing high-temperature steel chimney is connected with concrete roof.
Background technology
In boiler room production run work, go out the gas that produces a large amount of high heat in the chimney above roof, this high-temperature flue gas causes very big influence to the concrete roof plate around the chimney, easily make roof panel produce the crack, destroy roof structure, and then make roof leakage, influence is produced.
The utility model content
Provide a kind of structure that roofing high-temperature steel chimney is connected with concrete roof that goes out in order to solve the problems of the technologies described above the utility model, purpose is to strengthen the durability of its concrete roof plate and avoid leaking.
The utility model is achieved in that out the structure that roofing high-temperature steel chimney is connected with concrete roof in order to achieve the above object, comprise steel stack wall, roof panel, around wearing the roof panel hole, steel stack divides into ring beam, around the hole, establish the anti-edge of roof panel on the ring beam, between steel stack wall and the anti-edge of roof panel, be provided with refractory brick, between ring beam and steel stack wall, be provided with the band steel support, between anti-edge of roof panel and steel stack wall, be provided with angle bar frame.
Described roof panel is provided with roof waterproof layer.
The anti-bolt of continuing to use of described roof waterproof layer and roof panel.
One end of described roof waterproof layer end, angle bar frame is fixed by bolts to roof panel instead along last.
Be provided with metal sleeve between the other end of described angle bar frame and the steel stack wall.
Described band steel support is fixed by bolts on the ring beam.
Be provided with metal sleeve between described band steel support and the steel stack wall.
Be provided with heat-barrier material between described metal sleeve and the steel stack wall.
Described angle bar frame top is provided with aluminium sheet.
Described aluminium sheet one end is fixed on the steel stack wall with iron hoop, and the other end of aluminium sheet is located on the roof waterproof layer.
Be provided with heat-barrier material between described iron hoop and the steel stack wall.
Described aluminium sheet is obliquely installed.
Advantage of the present utility model and effect are as follows:
Adopt the utility model technology, can effectively solve the high temperature chimney to the concrete roof plate of process cause the crack, destroy the roof structure problem, strengthen the stability that sockets of high temperature chimney and roof panel, and construction simply, maintain easily, outward appearance is regular, with low cost, long service life.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Among the figure: 1, refractory brick; 2, steel stack wall; 3, bolt; 4, band steel support; 5, heat-barrier material; 6, metal sleeve; 7, angle bar frame; 8, aluminium sheet; 9, iron hoop; 10, ring beam; 11, roof waterproof layer; 12, the anti-edge of roof panel; 13, roof panel; 14, steel stack; 15, roof panel.
The specific embodiment
Below in conjunction with accompanying drawing the utility model embodiment is described further, but protection domain of the present utility model is not implemented legend and is limit.
As shown in Figure 1, the utility model goes out the structure that roofing high-temperature steel chimney is connected with concrete roof, comprise steel stack wall 2, roof panel 13, steel stack 14 is divided into ring beam 10 around wearing roof panel 15 holes, around the hole, establish roof panel on the ring beam 10 instead along 12, between steel stack wall 2 and roof panel are instead along 12, be provided with refractory brick 1, between ring beam 10 and steel stack wall 2, be provided with band steel support 4, roof panel instead along 12 and steel stack wall 2 between be provided with angle bar frame 7, roof panel 13 is provided with roof waterproof layer 11, roof waterproof layer 11 is instead used bolt along 12 with roof panel, roof waterproof layer 11 ends, one end of angle bar frame 7 is fixed on roof panel instead along on 12 with bolt 3, be provided with metal sleeve 6 between the other end of angle bar frame 7 and the steel stack wall 2, band steel support 4 usefulness bolts 3 are fixed on the ring beam 10, be provided with metal sleeve 6 between band steel support 4 and the steel stack wall 2, be provided with heat-barrier material 5 between metal sleeve 6 and the steel stack wall 2, metal sleeve 6 and angle bar frame 7 and 4 welding of band steel support, metal sleeve 6 is fixed on the steel stack wall 2, angle bar frame 7 tops are provided with aluminium sheet 8, aluminium sheet 8 one ends are fixed on the steel stack wall 2 with iron hoop 9, the other end of aluminium sheet 8 is located on the roof waterproof layer 11, aluminium sheet 8 is obliquely installed, and is provided with heat-barrier material between iron hoop 9 and the steel stack wall 2.
Claims (12)
1, goes out the structure that roofing high-temperature steel chimney is connected with concrete roof, it comprises steel stack wall (2), roof panel (13), being characterised in that steel stack (14) is worn divides into ring beam (10) around roof panel (15) hole, around the hole, to establish roof panel on the ring beam (10) anti-along (12), between steel stack wall (2) and the anti-edge of roof panel (12), be provided with refractory brick (1), between ring beam (10) and steel stack wall (2), be provided with band steel support (4), between anti-edge of roof panel (12) and steel stack wall (2), be provided with angle bar frame (7).
2, according to claim 1ly go out the structure that roofing high-temperature steel chimney is connected with concrete roof, it is characterized in that described roof panel (15) is provided with roof waterproof layer (11).
3, according to claim 2ly go out the structure that roofing high-temperature steel chimney is connected with concrete roof, it is characterized in that described roof waterproof layer (11) and roof panel are anti-to use bolt along (12).
4, according to claim 3ly go out the structure that roofing high-temperature steel chimney is connected with concrete roof, it is anti-along on (12) that an end that it is characterized in that described roof waterproof layer (11) end, angle bar frame (7) is fixed by bolts to roof panel.
5, according to claim 4ly go out the structure that roofing high-temperature steel chimney is connected with concrete roof, it is characterized in that being provided with metal sleeve (6) between the other end of described angle bar frame (7) and the steel stack wall (2).
6, according to claim 1ly go out the structure that roofing high-temperature steel chimney is connected with concrete roof, it is characterized in that described band steel support (4) is fixed by bolts on the ring beam (10).
7, according to claim 6ly go out the structure that roofing high-temperature steel chimney is connected with concrete roof, it is characterized in that being provided with metal sleeve between described band steel support (4) and the steel stack wall (2).
8, describedly go out the structure that roofing high-temperature steel chimney is connected with concrete roof according to claim 5 or 7, it is characterized in that being provided with heat-barrier material between described metal sleeve and the steel stack wall (2).
9, according to claim 5ly go out the structure that roofing high-temperature steel chimney is connected with concrete roof, it is characterized in that described angle bar frame (7) top is provided with aluminium sheet (8).
10, according to claim 9ly go out the structure that roofing high-temperature steel chimney is connected with concrete roof, it is characterized in that described aluminium sheet (8) one ends are fixed on the steel stack wall (2) with iron hoop (9), the other end of aluminium sheet (8) is located on the roof waterproof layer (11).
11, according to claim 10ly go out the structure that roofing high-temperature steel chimney is connected with concrete roof, it is characterized in that being provided with heat-barrier material between described iron hoop (9) and the steel stack wall (2).
12, according to claim 10ly go out the structure that roofing high-temperature steel chimney is connected with concrete roof, it is characterized in that described aluminium sheet (8) is obliquely installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200820012062 CN201184022Y (en) | 2008-04-10 | 2008-04-10 | Structure connecting out-roofing high temperature steel chimney and concrete roofing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200820012062 CN201184022Y (en) | 2008-04-10 | 2008-04-10 | Structure connecting out-roofing high temperature steel chimney and concrete roofing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201184022Y true CN201184022Y (en) | 2009-01-21 |
Family
ID=40271760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200820012062 Expired - Fee Related CN201184022Y (en) | 2008-04-10 | 2008-04-10 | Structure connecting out-roofing high temperature steel chimney and concrete roofing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201184022Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102383600A (en) * | 2011-11-24 | 2012-03-21 | 天津住宅集团建设工程总承包有限公司 | Sealing construction method for preventing rain water from entering room through tower crane outlet on roof |
CN107675841A (en) * | 2017-09-11 | 2018-02-09 | 新奥泛能网络科技股份有限公司 | Chimney fixing device |
-
2008
- 2008-04-10 CN CN 200820012062 patent/CN201184022Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102383600A (en) * | 2011-11-24 | 2012-03-21 | 天津住宅集团建设工程总承包有限公司 | Sealing construction method for preventing rain water from entering room through tower crane outlet on roof |
CN107675841A (en) * | 2017-09-11 | 2018-02-09 | 新奥泛能网络科技股份有限公司 | Chimney fixing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202992524U (en) | Wear-resistant heat-insulating structure of high-temperature flue pipeline | |
CN103574651A (en) | Simple dual-injection-pipe energy-saving cooker with circular windproof bracket with holes | |
CN201184022Y (en) | Structure connecting out-roofing high temperature steel chimney and concrete roofing | |
CN203961152U (en) | A kind of roofing Durchgangshohle position waterproof construction | |
CN202363825U (en) | Sealing device for utward-separated cable penetration | |
CN201652388U (en) | Inner cylinder tiling chimney of reinforced concrete inner-outer cylinder | |
CN204164502U (en) | Piping foundation fixture | |
CN205859979U (en) | A kind of sliding bottom for the low low-level (stack-gas) economizer of power plant coal-burning boiler | |
CN201605736U (en) | Anti-cold bridge node of steel structural roof | |
CN201386113Y (en) | Cantilever type smoke baffle wall | |
CN201574529U (en) | Buried-shirts roof plate longitudinally-connecting structure | |
CN203961142U (en) | A kind of prepared roofing | |
CN204176167U (en) | Intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene working pipe | |
CN202452039U (en) | Combined pipeline bend heat preservation casing | |
CN201660652U (en) | Water seal structure between hearth and furnace wall of rotary hearth furnace | |
CN201461702U (en) | Circumferential and longitudinal segment fastener | |
CN203615752U (en) | Smelting furnace waste heat boiler wall | |
CN205939184U (en) | Wear -resisting flame retardant coating metal -support protection casing of power plant boiler slag pit | |
CN204176131U (en) | There is the prefabricated direct-buried thermal insulation pipe of crosslinked polyethylene reducing work pipe fitting | |
CN201391694Y (en) | Square flange seal structure for inlet of top pressure recovery turbine | |
CN204059788U (en) | Solar energy integrates roofing | |
CN203007313U (en) | Water-cooling cover of continuous steelmaking electric furnace | |
CN203579562U (en) | Tension spring dismounting device of excavator | |
CN203582705U (en) | Closed kiln door for foam glass foaming kiln | |
CN201486009U (en) | Suspended ceiling piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090121 Termination date: 20110410 |