CN201176587Y - 建筑基础施工扩底桩 - Google Patents

建筑基础施工扩底桩 Download PDF

Info

Publication number
CN201176587Y
CN201176587Y CNU2007201851641U CN200720185164U CN201176587Y CN 201176587 Y CN201176587 Y CN 201176587Y CN U2007201851641 U CNU2007201851641 U CN U2007201851641U CN 200720185164 U CN200720185164 U CN 200720185164U CN 201176587 Y CN201176587 Y CN 201176587Y
Authority
CN
China
Prior art keywords
precast pile
pile
pile body
cast
concrete base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2007201851641U
Other languages
English (en)
Inventor
陈宁华
姚健生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group No.2 Construction Engineering Co., Ltd.
Original Assignee
姚健生
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 姚健生 filed Critical 姚健生
Priority to CNU2007201851641U priority Critical patent/CN201176587Y/zh
Application granted granted Critical
Publication of CN201176587Y publication Critical patent/CN201176587Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种适用于是高层建筑地基工程中的建筑基础施工扩底桩。它的结构为:上段预制桩身的外部设置有钢管,内部设有上段预制桩身的下插筋,下段预制桩身内设有下段预制桩身的上插筋和预埋下插筋,下段预制桩身的上插筋与上段预制桩身的下插筋相搭接,再通过上现浇砼底座将上段预制桩身和下段预制桩身锚固连成一体,上段预制桩身和下段预制桩身的连接处设置稳固筋,底座的中心与桩身中心同轴,下段预制桩身的下端设有现浇砼底座,上段预制桩身和下段预制桩身的截面为圆形。它适用范围宽、明显提高了稳固性、材料强度利用率,并增强了桩身的承载力。

Description

建筑基础施工扩底桩
技术领域
本实用新型涉及一种建筑用扩底桩,特别是涉及一种适用于高层建筑地基工程中的建筑基础施工扩底桩。
背景技术
目前用于高层建筑及承载力要求高的建筑地基的桩基工程一般采用沉管扩底桩、预制桩和大直径钻孔灌注桩三种。其中大直径钻孔灌注桩承载力最高,但其造价昂贵、工效低,而且施工时污染严重;预制桩的质量好、承载力也较高,但目前预制桩的造价也高,一般用于安全等级较高的建筑。其中应用最为广泛的是沉管扩底桩,该桩的桩身为现浇钢砼,桩头为预制;在施桩时,先将沉管的预制桩头埋入地基中的硬土层,然后灌砼浇注成桩;但是由于地壳形成的土质年代不同,软土地基随地壳层深度的增加通常软、硬土层呈交替状态,这样在连续打桩施工时,在后的施桩会对土层产生挤压,就会影响到在先灌注而尚未完全凝固的桩,尤其在软土层与硬土层的交界处尤其严重,往往出现断桩、缩颈现象,从而导致约有20%左右的沉管灌注桩的质量达不到要求,迫使设计人员降低单桩承载力的标准,致使下桩密布,引起土体严重变形,甚至危及桩身的质量;该桩的另一个缺点是承载力低,为增大承载力,一般采用在灌砼浇注桩身后加压扩底的办法,但因其利用加压扩底方式使其形状大小不确定和规范,使其应用受到局限。本发明人已申请的建筑基础施工扩底桩的实用新型专利虽然解决了上述问题,但在实际使用过程中发现,桩身的连接处存在着承载力和抗冲击力较弱、稳固性差的问题。
实用新型内容
本实用新型针对现有技术存在的问题,提供了一种建筑基础施工扩底桩,解决了现有技术中桩身的连接处存在着承载力和抗冲击力较弱、稳固性差的问题。
本实用新型解决技术问题所采用的技术方案是:上段预制桩身外部设置有钢管,上段预制桩身的内部设有下插筋,下段预制桩身内设有下段预制桩身的上插筋和预埋下插筋,下段预制桩身的上插筋与上段预制桩身的下插筋相搭接,再通过上现浇砼底座将上段预制桩身和下段预制桩身锚固连成一体,上段预制桩身和下段预制桩身的内部连接处设置交叉型稳固筋,下段预制桩身的下端设有现浇砼底座,现浇砼底座和现浇砼底座的中心与下段预制桩身和上段预制预应力桩身中心同轴,上段预制桩身和下段预制桩身的截面为圆形。
所述的上现浇砼底座和现浇砼底座的纵剖面呈下大上小的梯形。
本实用新型采用多节桩身和两个以上扩底座,由于上底座的对下底座承载力的发挥产生良好影响,各底座的设置对各段桩身摩阻力的发挥有利,使桩始终处于经济合理的状态下工作,明显提高单桩的承载力和材料强度的利用率,增强了稳固性,容易达到设计的预期效果,更好地满足建筑工程的需要,同时适用范围广无论是高层还是低层建筑、安全等级和地基土质情况都能组合成与其相匹配的沉管预制多级扩底桩。
附图说明
图1是本实用新型的预制桩身的主视结构示意图。
图中:1、现浇砼底座;2、上现浇砼底座;3、下段预制桩身;4、上段预制桩身;6、上段预制桩身的下插筋;9、下段预制桩身的上插筋;10、预埋下插筋,11、稳固筋。
具体实施方式
本实用新型的实施例结合附图加以详细描述,但本实用新型的保护范围不受实施例所限。
实施例一
如图1所示的是本实用新型预制桩身现浇砼底座的主视结构示意图,上段预制桩身4的外部设置有钢管,上段预制桩身4的内部设有上段预制桩身的下插筋6,下段预制桩身3内设有下段预制桩身的上插筋9和预埋下插筋10,下段预制桩身的上插筋9与上段预制桩身的下插筋6相搭接,再通过上现浇砼底座2将上段预制桩身4和下段预制桩身3锚固连成一体,上段预制桩身4和下段预制桩身3的内部连接处设置交叉型稳固筋11,下段预制桩身3的下端设有现浇砼底座1,现浇砼底座2和现浇砼底座1的中心与下段预制桩身3和上段预制桩身4中心同轴,上段预制桩身4和下段预制桩身3的截面为圆形。上现浇砼底座2和现浇砼底座1的纵剖面呈下大上小的梯形。本实施例的施工方法可以按照常规工艺进行施工。

Claims (2)

1、建筑基础施工扩底桩,其特征在于它是由下述结构构成:上段预制桩身(4)的外部设置有钢管,上段预制桩身(4)的内部设有上段预制桩身的下插筋(6),下段预制桩身(3)内设有下段预制桩身的上插筋(9)和预埋下插筋(10),下段预制桩身的上插筋(9)与上段预制桩身的下插筋(6)相搭接,再通过上现浇砼底座(2)将上段预制桩身(4)和下段预制桩身(3)锚固连成一体,上段预制桩身(4)和下段预制桩身(3)的内部连接处设置交叉型稳固筋(11),下段预制桩身(3)的下端设有现浇砼底座(1),现浇砼底座(2)和现浇砼底座(1)的中心与下段预制桩身(3)和上段预制桩身(4)中心同轴,上段预制桩身(4)和下段预制桩身(3)的截面为圆形。
2、根据权利要求1所述的建筑基础施工扩底桩,其特征在于所述的上现浇砼底座(2)和现浇砼底座(1)的纵剖面呈下大上小的梯形。
CNU2007201851641U 2007-12-25 2007-12-25 建筑基础施工扩底桩 Expired - Lifetime CN201176587Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201851641U CN201176587Y (zh) 2007-12-25 2007-12-25 建筑基础施工扩底桩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201851641U CN201176587Y (zh) 2007-12-25 2007-12-25 建筑基础施工扩底桩

Publications (1)

Publication Number Publication Date
CN201176587Y true CN201176587Y (zh) 2009-01-07

Family

ID=40216605

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201851641U Expired - Lifetime CN201176587Y (zh) 2007-12-25 2007-12-25 建筑基础施工扩底桩

Country Status (1)

Country Link
CN (1) CN201176587Y (zh)

Similar Documents

Publication Publication Date Title
CN200946270Y (zh) 沉管扩底桩
CN201087410Y (zh) 一种适合高层建筑基础施工用扩底桩
CN201176587Y (zh) 建筑基础施工扩底桩
CN201074328Y (zh) 建筑基础施工扩底桩
CN201087408Y (zh) 建筑基础施工扩底桩
CN201074325Y (zh) 一种适合高层建筑基础施工用扩底桩
CN201074324Y (zh) 高层建筑扩底桩
CN201087400Y (zh) 高承载力沉管灌注扩底桩
CN201087407Y (zh) 抗冲击力建筑基础施工扩底桩
CN201137112Y (zh) 抗冲击力建筑基础施工扩底桩
CN201137105Y (zh) 一种适合高层建筑基础施工用扩底桩
CN201137091Y (zh) 抗冲击力建筑基础施工扩底桩
CN201137061Y (zh) 高层建筑扩底桩
CN201087378Y (zh) 高承载力高层建筑扩底桩
CN201137083Y (zh) 高承载力高层建筑扩底桩
CN201121317Y (zh) 抗冲击力建筑基础施工扩底桩
CN201137075Y (zh) 沉管扩底桩
CN201137062Y (zh) 沉管灌注扩底桩
CN201087349Y (zh) 抗冲击力适合高层建筑用沉管扩底桩
CN201087406Y (zh) 沉管扩底桩
CN201087379Y (zh) 一种适合高层建筑基础施工用高承载力扩底桩
CN201137106Y (zh) 一种适合高层建筑基础施工用高承载力扩底桩
CN201144417Y (zh) 一种抗冲击力建筑用沉管灌注扩底桩
CN201087405Y (zh) 抗冲击力高层建筑扩底桩
CN201087411Y (zh) 一种建筑用沉管灌注扩底桩

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NO.2 CONSTRUCTION ENGINEERING CO., LTD. OF GUANGXI

Free format text: FORMER OWNER: YAO JIANSHENG

Effective date: 20110128

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 315032 FANSHENG PLASTIC FACTORY, GEJIA INDUSTRIAL AREA, JIANGBEI DISTRICT, NINGBO CITY, ZHEJIANG PROVINCE TO: 530022 NO.29, XINZHU ROAD, QINGXIU DISTRICT, NANNING CITY, GUANGXI ZHUANG AUTONOMOUS REGION

TR01 Transfer of patent right

Effective date of registration: 20110128

Address after: 530022 the Guangxi Zhuang Autonomous Region Nanning Qingxiu District Hsinchu Road No. 29

Patentee after: Guangxi Construction Engineering Group No.2 Construction Engineering Co., Ltd.

Address before: 315032 Zhejiang Ningbo District, Jiangbei District, Ge Sheng Industrial Zone plastics factory

Patentee before: Yao Jiansheng

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090107