CN201166461Y - Integrated waterway apparatus - Google Patents

Integrated waterway apparatus Download PDF

Info

Publication number
CN201166461Y
CN201166461Y CNU2007200595949U CN200720059594U CN201166461Y CN 201166461 Y CN201166461 Y CN 201166461Y CN U2007200595949 U CNU2007200595949 U CN U2007200595949U CN 200720059594 U CN200720059594 U CN 200720059594U CN 201166461 Y CN201166461 Y CN 201166461Y
Authority
CN
China
Prior art keywords
water route
water
interface
valve
integrated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200595949U
Other languages
Chinese (zh)
Inventor
王勇
郭建恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GTC GAS TECHONOLOGY COMPONENTS Co Ltd
Original Assignee
GTC GAS TECHONOLOGY COMPONENTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GTC GAS TECHONOLOGY COMPONENTS Co Ltd filed Critical GTC GAS TECHONOLOGY COMPONENTS Co Ltd
Priority to CNU2007200595949U priority Critical patent/CN201166461Y/en
Application granted granted Critical
Publication of CN201166461Y publication Critical patent/CN201166461Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model relates to an integrated waterway device, which is characterized in that a rotor type flow capacity inductor is adopted and the purpose of rapidly and precisely controlling the bathroom water temperature is achieved through the feedback of the flow capacity. The integrated waterway device comprises a waterway main valve body, a rotor component, a Hall detector, a water injection valve component, a current limiting ring, a by-pass valve and a safety valve. The waterway valve body comprises a bathroom water inlet and a bathroom water outlet, a rotor component installing position, a water injection valve installing interface, a water pump interface, current limiting ring and by-pass valve installing positions, a pressure switch or a pressure sensor installing interface, a hydraulic pressure gage installing interface, a safety valve installing interface and other interfaces. The waterway device is a conglomerate which is manufactured through a machinery processing method or a casting method or an injection moulding method, the assembly is more convenient and rapider, the whole machine failure rate can be reduced, and the hydraulic resistance and the outer shape size of the device can be reduced.

Description

A kind of integrated water route device
Technical field
The utility model relates to a kind of integrated water route device, particularly can be used for the inner a kind of integrated water route device of the dual-purpose gas fired-boiler of bushing type heating bathroom (as the wall hanging stove).
Technical background
At present, the inner water route of the dual-purpose gas fired-boiler of sleeve pipe heating bathroom (as the wall hanging stove), fairly simple usually, use fluid flow switch to detect the bathroom flow, temperature control precision is lower, and easy break-down.
The utility model content
At the problems referred to above of the prior art, the utility model purpose is to provide a kind of integrated water route device that adopts the rotator type flow inductor, by the feedback to flow, arrives the purpose of fast, accurately controlling the bathroom water temperature.
The further purpose of the utility model is to make to provide the dual-purpose gas fired-boiler of a kind of suitable bushing type heating bathroom the inner integrated water route device that uses.
Above-mentioned purpose of the present utility model adopts following technical scheme to be achieved:
A kind of integrated water route device, described integrated water route device comprises water route valve body, rotor assembly, hall probes, water injection valve assembly, restrictor ring, by-passing valve.
Described water route valve body comprises multiple interfaces such as bathroom water inlet and delivery port, rotor assembly installation site, water injection valve mounting interface, water pump interface, restrictor ring and by-passing valve installation site, pressure switch or pressure sensor mounting interface, water pressure gauge mounting interface, safety valve mounting interface.
Described rotor assembly is a flow inductor, is arranged in the bathroom water stream channel, the flow velocity of bathroom current is changed into the rotating speed of rotor.Described hall probes is installed near the rotor assembly, and the rotation that is installed in epitrochanterian magnetic by detection obtains the rate signal that rotor rotates, and feeds back to boiler control system again.After boiler control system has obtained the flow velocity of bathroom current, can regulate firepower accurately, realize the accurate control of bathroom water temperature.
Described hall probes is the assembly that Hall element is installed, and it is subjected to the variable effect in magnetic field to produce signal.
Described water injection valve assembly is the parts that the water in the control bathroom accessory system flows into heating system, is in closed condition usually.When the heating system lack of water, open this valve, the water in the bathroom accessory system is injected in the heating system.
Described restrictor ring is arranged in the bathroom water stream channel, the maximum stream flow of restriction bathroom current.
Described by-passing valve is arranged in the heating system passage, is used to protect water pump.
Because the utility model has adopted technique scheme, and then can according to pipeline function needs to major general's part pipeline integrating together, make parts or two with upper-part with machining, casting or injection moulding, material can be brass or engineering plastics, and above the probe that will be correlated with and equipment is installed in, make that volume reduces greatly, interface reduces, assemble more convenient, the complete machine fault rate can be reduced, and the inner water resistance of device can be reduced greatly.The integrated level of corresponding component is very high, can be applied on the dual-purpose gas fired-boiler of the heating bathroom multiple products such as (as the wall hanging stoves), and its clear in structure is simple, raw materials consumption is little.
Description of drawings
Fig. 1 is the structural representation of water route described in the utility model assembly.
Fig. 2 is the structural representation that associated components is specialized and installed to the utility model water route assembly profile.
Fig. 3 is the structural representation that the utility model selects described water route assembly is contained in the wall hanging furnace interior.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
With reference to shown in Figure 1, a kind of integrated water route device, described integrated water route device comprises water route main valve body 1, rotor assembly 2, hall probes 4, water injection valve assembly 13, restrictor ring 5, by-passing valve 8, safety valve 9.
Described water route valve body comprises multiple interfaces such as bathroom water inlet 3 and delivery port 6, rotor assembly installation site, water injection valve mounting interface, water pump interface 10, restrictor ring and by-passing valve installation site, pressure switch or pressure sensor mounting interface 12, water pressure gauge mounting interface 11, safety valve mounting interface.
With reference to shown in Figure 1, rotor assembly 2 and restrictor ring 5 in the bathroom passage, have been arranged.
Described rotor assembly 2 has field element, is used to detect the bathroom water flow velocity.
Described restrictor ring 5 is used to limit the speed of bathroom current, in order to avoid water outlet is hot inadequately.
Described hall probes 4 is arranged in the valve body outside, near rotor assembly 2, with the variation in inductiopn rotor magnetic field.
Described water injection valve assembly 13 is tie points of bathroom passage and heating system.
In the described heating system, arrange by-passing valve 8, safety valve 9, be provided with multiple interfaces such as water pump interface 10, pressure switch or pressure sensor mounting interface 12, water pressure gauge mounting interface 11, main heat exchanger heating hot water connector.
With reference to shown in Figure 2, described integrated water route device comprises water route valve body 1, rotor assembly 2, hall probes 4, water injection valve assembly 13, restrictor ring 5, by-passing valve 8.
Described water route valve body has comprised multiple interfaces such as bathroom water inlet 3 and delivery port 6, rotor assembly 2 installation sites, water injection valve 13 mounting interfaces, water pump interface 10, restrictor ring 5 and by-passing valve 8 installation sites, pressure switch or pressure sensor mounting interface 12, water pressure gauge mounting interface 11, safety valve mounting interface 9.
With reference to shown in Figure 3, described integrated water route device is installed in the inner structure of the dual-purpose gas fired-boiler of heating bathroom (as the wall hanging stove), water pump interface 10 links to each other with water pump, and the main heat exchanger heating hot water connects outlet 7 and links to each other with main heat exchanger, and sanitary outfall mouth 6 links to each other with the bathroom passage of main heat exchanger.
This integrated water route provided by the utility model device, can according to pipeline function needs to major general's part pipeline integrating together, make one or more parts with machining or casting or injection moulding, and above the probe that will be correlated with and equipment is installed in, make that volume reduces greatly, interface reduces, and assembles more convenient.
The above-mentioned embodiment of the utility model only helps understanding inventive concept of the present utility model, rather than it is determinate, and the utility model is not limited to the given details of this specification, but enclosing claims and being equal within the scope of replacement, can improve.

Claims (6)

1, a kind of integrated water route device, described integrated water route device comprises the water route valve body and goes up interface and the installation site that is provided with that it is characterized in that: described integrated water route device comprises water route main valve body, rotor assembly, hall probes, water injection valve assembly, restrictor ring, by-passing valve, safety valve.
2, a kind of integrated water route according to claim 1 device is characterized in that: described water route main valve body comprises multiple interfaces such as bathroom water inlet and delivery port, rotor assembly installation site, water injection valve mounting interface, water pump interface, restrictor ring and by-passing valve installation site, pressure switch or pressure sensor mounting interface, water pressure gauge mounting interface, safety valve mounting interface.
3, a kind of integrated water route according to claim 1 device, it is characterized in that: described rotor assembly has magnetic element.
4, a kind of integrated water route according to claim 1 device is characterized in that: hall probes adopts Hall element to detect the rotation of the magnetic element of described rotor
5, a kind of integrated water route according to claim 2 device, it is characterized in that: the bypass current enter water pump from the water pump side behind main valve body.
6, integrated water route according to claim 5 device, it is characterized in that: described water circulating pump is arranged at the flank of described a kind of integrated water route device.
CNU2007200595949U 2007-11-15 2007-11-15 Integrated waterway apparatus Expired - Fee Related CN201166461Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200595949U CN201166461Y (en) 2007-11-15 2007-11-15 Integrated waterway apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200595949U CN201166461Y (en) 2007-11-15 2007-11-15 Integrated waterway apparatus

Publications (1)

Publication Number Publication Date
CN201166461Y true CN201166461Y (en) 2008-12-17

Family

ID=40191851

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200595949U Expired - Fee Related CN201166461Y (en) 2007-11-15 2007-11-15 Integrated waterway apparatus

Country Status (1)

Country Link
CN (1) CN201166461Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104154950A (en) * 2014-07-11 2014-11-19 北京联创思源测控技术有限公司 Combined-type flow pressure sensor
WO2016086866A1 (en) * 2014-12-03 2016-06-09 佛山市云米电器科技有限公司 Water purification equipment and integrated water path module thereof
WO2016086865A1 (en) * 2014-12-03 2016-06-09 佛山市云米电器科技有限公司 Water purification equipment, integrated water path module thereof and manufacturing method for integrated water path module

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104154950A (en) * 2014-07-11 2014-11-19 北京联创思源测控技术有限公司 Combined-type flow pressure sensor
CN104154950B (en) * 2014-07-11 2017-06-16 北京联创思源测控技术有限公司 Combined type pressure flow sensor
WO2016086866A1 (en) * 2014-12-03 2016-06-09 佛山市云米电器科技有限公司 Water purification equipment and integrated water path module thereof
WO2016086865A1 (en) * 2014-12-03 2016-06-09 佛山市云米电器科技有限公司 Water purification equipment, integrated water path module thereof and manufacturing method for integrated water path module

Similar Documents

Publication Publication Date Title
WO2008142941A1 (en) Heat flowmeter
CN201166461Y (en) Integrated waterway apparatus
CN105091346A (en) Heat pump water heater control method and heat pump water heater
CN101476922B (en) Totally-enclosed open type commutator
CN200996726Y (en) Gas double-pipe fireplace
EP2507427B1 (en) Method to control a filling of a washing machine tub with water, and washing machine that implements such method
CN101464242B (en) Method of determining the viscosity of a fluid
CN201093746Y (en) Running water inlet and injection device for heating water heater
CN205537786U (en) High accuracy hall flowmeter
CN102563883A (en) Water temperature control device
CN202614004U (en) Cooling water leakage and blockage detecting device of heating furnace
CN2893660Y (en) Controllable flow multifunction flow meter
CN104791991A (en) Gas water heater and control method thereof
CN201062864Y (en) Sleeve type wall hanging stove with water control system
CN204027605U (en) The water flow sensing device that gas-heating water heater or water heater are used
CN201352129Y (en) Flow rate pressure-difference device
TWI486542B (en) Water temperature control system and method
CN208431438U (en) A kind of valve with flow detection function
CN201340090Y (en) Integrated water path device
CN109084042A (en) Water valve component, hot-water heating system and control method
CN204922156U (en) Automatic water installations who can be used to bathtub product
CN203413834U (en) Constant temperature circulating water supply system with cold and hot water impulse test function
CN203223590U (en) Hot and cold water proportion regulating valve of water heater
CN106439083A (en) Intelligent ball valve
CN202579466U (en) Heating loop of hydraulic lubricating system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: Jinding Science and Technology Industrial Park, Jinzhou Road 519085 Guangdong city of Zhuhai province No. 12

Patentee after: GTC Gas Techonology Components Co., Ltd.

Address before: 519002, 2, Xinghua Road 113, Guangdong, Zhuhai, Xiangzhou

Patentee before: GTC Gas Techonology Components Co., Ltd.

DD01 Delivery of document by public notice

Addressee: GTC Gas Techonology Components Co., Ltd.

Document name: Notification to Pay the Fees

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081217

Termination date: 20161115