CN201162228Y - Shore-protection structure - Google Patents

Shore-protection structure Download PDF

Info

Publication number
CN201162228Y
CN201162228Y CNU2008200550529U CN200820055052U CN201162228Y CN 201162228 Y CN201162228 Y CN 201162228Y CN U2008200550529 U CNU2008200550529 U CN U2008200550529U CN 200820055052 U CN200820055052 U CN 200820055052U CN 201162228 Y CN201162228 Y CN 201162228Y
Authority
CN
China
Prior art keywords
bored pile
slab
protection
protection structure
bank protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200550529U
Other languages
Chinese (zh)
Inventor
朱丽娟
蒋光遒
黄颖蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Original Assignee
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Investigation Design and Research Institute Co Ltd SIDRI filed Critical Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority to CNU2008200550529U priority Critical patent/CN201162228Y/en
Application granted granted Critical
Publication of CN201162228Y publication Critical patent/CN201162228Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a bank protection structure, which comprises a bored pile, a anti-seepage body, a protection slab and a top breast wall; the anti-seepage body is arranged on the earth-retaining side on the inner side of the bored pile, the protection slab is arranged on the outer side of the bored pile, and the bored pile, the bored pile and the protection slab are connected into a whole. The bank protection structure has the advantages that the fender structure left after the construction is finished is utilized, the resource is saved, the outer shape is clean, the occupied space is small, and the bank protection structure fending the foundation ditch during the construction period can also be considered.

Description

A kind of bank protection structure
Technical field
The utility model relates to the correlative technology field of hydraulic structure construction, specifically a kind of bank protection structure.
Background technology
When straitly distinguishing hydraulic structure such as construction sluice, pumping plant, ship lock in the place, need carry out bracing of foundation pit, bored pile adds a kind of as space enclosing structure of antiseepage body, and construction generally will not utilize after finishing, comparatively waste.Therefore, the permanent shore protection that makes it to become the hydraulic structure both sides by transformation is very significant.On the other hand, bored pile adds the antiseepage body as common bank protection structure, and being applied in the limit, riverbank, the zone of intensive building is arranged also is very suitable, can reduce the engineering quantity of removing.Because the bored pile profile is very not attractive in appearance, also there is the problem of wave scour before the wall, therefore, the surface need add protection slab and make it and combine well with castinplace pile.
The utility model content
The purpose of this utility model has provided the bank protection structure that a kind of outward appearance is clean and tidy, take up an area of less, can take into account the construction period bracing of foundation pit, has solved generally will not utilize after traditional space enclosing structure construction finishes, comparatively Lang Fei problem.
For achieving the above object, the utility model has adopted following technical scheme:
The utility model discloses a kind of bank protection structure, comprise bored pile, antiseepage body, protection slab and top breastwork; Described antiseepage body is arranged at the native side of the inboard retaining of bored pile, and protection slab is arranged at the outside of bored pile, and top breastwork and bored pile and protection slab connect into integral body.
Wherein, described bored pile is a concrete structure.
Described antiseepage body is compact arranged cement mixing pile body of wall, or the compact arranged piling wall body of jet grounting formation.
Described protection slab is a cast-in-place concrete structure, or precast concrete.
Described top breastwork is the concrete structure with bored pile and protection slab monobloc cast.
Advantage of the present utility model is: utilized the space enclosing structure after the space enclosing structure construction finishes, saved resource, and outward appearance is clean and tidy, occupation of land is few, can take into account the bank protection structure of construction period bracing of foundation pit.
Description of drawings
Fig. 1 is a plan structure schematic diagram of the present utility model.
Fig. 2 is a cross-sectional view of the present utility model.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further described.
A kind of bank protection structure as shown in Figure 1, 2, comprises bored pile 1, antiseepage body 2, protection slab 3 and top breastwork 4; Described antiseepage body 2 is arranged at the native side of bored pile 1 inboard retaining, and protection slab 3 is arranged at the outside of bored pile 1, and top breastwork and bored pile 1 and protection slab 3 connect into integral body.
Described bored pile 1 is a concrete structure, and its spacing can be dredged as required can be close, and bored pile 1 bends at the pre-buried horizontal steel bar of the side that meets water and along topping.Antiseepage body 2 is solid matter cement mixing pile bodies of wall, or the close pile body of wall of jet grounting formation.Protection slab 3 adopts concrete structure, and the bottom is goed deep into below the mud face, the top of top and bored pile 1 and breastwork 4 monobloc casts.A kind of scheme of protection slab 3 is cast-in-place, at this moment need the embedded bar in the bored pile 1 is dug out, with steel bar overall welding or the colligation in the protection slab 3, bored pile 1 surface cutter hair is handled, and makes that the protection slab structure 3 after building is connected as a single entity with bored pile 1.The another kind of scheme of protection slab 3 is prefabricated, protection slab 3 precast blocks at this moment, and width on one side the two sides of plate are grooves, is a tenon so that construction is advisable on one side, adopts to set facility and construct cement injection mortar between bored pile 1 and the protection slab 3.Top breastwork 4 adopts cast-in-place concrete structure, with bored pile 1 and protection slab 3 monobloc casts.

Claims (7)

1, a kind of bank protection structure is characterized in that: comprise bored pile (1), antiseepage body (2), protection slab (3) and top breastwork (4); Described antiseepage body (2) is arranged at the native side of the inboard retaining of bored pile (1), and protection slab (3) is arranged at the outside of bored pile (1), and top breastwork and bored pile (1) and protection slab (3) connect into integral body.
2, by the described a kind of bank protection structure of claim 1, it is characterized in that: described bored pile (1) is a concrete structure.
3, by the described a kind of bank protection structure of claim 1, it is characterized in that: described antiseepage body (2) is compact arranged cement mixing pile body of wall.
4, by the described a kind of bank protection structure of claim 1, it is characterized in that: the compact arranged piling wall body that described antiseepage body (2) forms for jet grounting.
5, by the described a kind of bank protection structure of claim 1, it is characterized in that: described protection slab (3) is cast-in-place concrete structure.
6, by the described a kind of bank protection structure of claim 1, it is characterized in that: described protection slab (3) is a precast concrete.
7, by the described a kind of bank protection structure of claim 1, it is characterized in that: described top breastwork (4) is the concrete structure with bored pile (1) and protection slab (3) monobloc cast.
CNU2008200550529U 2008-01-24 2008-01-24 Shore-protection structure Expired - Fee Related CN201162228Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200550529U CN201162228Y (en) 2008-01-24 2008-01-24 Shore-protection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200550529U CN201162228Y (en) 2008-01-24 2008-01-24 Shore-protection structure

Publications (1)

Publication Number Publication Date
CN201162228Y true CN201162228Y (en) 2008-12-10

Family

ID=40183166

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200550529U Expired - Fee Related CN201162228Y (en) 2008-01-24 2008-01-24 Shore-protection structure

Country Status (1)

Country Link
CN (1) CN201162228Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806070A (en) * 2010-04-23 2010-08-18 中船第九设计研究院工程有限公司 Free-standing low pile cap dock wall structure with double rows of piles as foundation
CN105780722A (en) * 2014-11-26 2016-07-20 上海勘测设计研究院有限公司 Novel vertical type bank revetment structure
CN106320267A (en) * 2016-10-12 2017-01-11 上海勘测设计研究院有限公司 Pile type composite retaining wall
CN110939101A (en) * 2019-12-26 2020-03-31 长江勘测规划设计研究有限责任公司 Vertical dike structure and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806070A (en) * 2010-04-23 2010-08-18 中船第九设计研究院工程有限公司 Free-standing low pile cap dock wall structure with double rows of piles as foundation
CN101806070B (en) * 2010-04-23 2011-12-14 中船第九设计研究院工程有限公司 Free-standing low pile cap dock wall structure with double rows of piles as foundation
CN105780722A (en) * 2014-11-26 2016-07-20 上海勘测设计研究院有限公司 Novel vertical type bank revetment structure
CN106320267A (en) * 2016-10-12 2017-01-11 上海勘测设计研究院有限公司 Pile type composite retaining wall
CN106320267B (en) * 2016-10-12 2019-04-26 上海勘测设计研究院有限公司 The stake compound barricade of formula
CN110939101A (en) * 2019-12-26 2020-03-31 长江勘测规划设计研究有限责任公司 Vertical dike structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN100387785C (en) Hydraulic sheeting and use method thereof
CN103321241B (en) Deep water open type combination foundation harbour and construction method thereof
CN201089893Y (en) Foundation pit circle shield prefabricated driven pile
CN107747308B (en) A kind of diaphram wall and construction method
CN103015367B (en) High-efficiency economical construction method for revetment
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN105133620A (en) Supporting structure for pit-in-pit with local fluidal plastic sludge soil mass and construction method of supporting structure
CN101696580A (en) Outboard template construction method of post-pouring belt of outer wall of underground structure
CN1952273A (en) Digging foundation with baffle and its construction method
CN201162228Y (en) Shore-protection structure
CN203701127U (en) Underwater gravity type foundation
CN101260664A (en) Soft soil foundation large scale steel float lock head construction method
KR101169023B1 (en) Method for installing soil nailing and tunnel prevent hole for tidal plant
CN101565952A (en) Method and structure for preventing pit-type building foundation floating
CN201933459U (en) Gravity wharf structure with anti-slide plate
CN203939032U (en) A kind of for upper lower the formula deep footing groove enclosing structure of wall of ground consisting of hard rock
CN101285302B (en) Method for reinforcing caisson of concrete dam
CN104963323A (en) Scour-preventing groove for chain precast block protective surface
CN204080750U (en) Box-type suction foundation sluice structure
CN214738333U (en) Permanent-faced combined box culvert foundation reinforcing structure
CN101812853B (en) Swimming pool base actively anti-floating construction method
CN204849791U (en) Structure of earth-rock cofferdam seepage-proofing system
CN205046537U (en) Naked rock platform of deep water
CN210421151U (en) Prefabricated assembled solidified sludge retaining wall
CN212248322U (en) Single pile structure in underwater artificial reef

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081210

Termination date: 20170124

CF01 Termination of patent right due to non-payment of annual fee