CN201158664Y - Clear water reservoir structure of blast furnace grain slag processing system - Google Patents

Clear water reservoir structure of blast furnace grain slag processing system Download PDF

Info

Publication number
CN201158664Y
CN201158664Y CNU2008200977238U CN200820097723U CN201158664Y CN 201158664 Y CN201158664 Y CN 201158664Y CN U2008200977238 U CNU2008200977238 U CN U2008200977238U CN 200820097723 U CN200820097723 U CN 200820097723U CN 201158664 Y CN201158664 Y CN 201158664Y
Authority
CN
China
Prior art keywords
water
slag
granulated slag
processing system
clear water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200977238U
Other languages
Chinese (zh)
Inventor
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Iron and Steel Co Ltd
Original Assignee
Chongqing Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Iron and Steel Group Co Ltd filed Critical Chongqing Iron and Steel Group Co Ltd
Priority to CNU2008200977238U priority Critical patent/CN201158664Y/en
Application granted granted Critical
Publication of CN201158664Y publication Critical patent/CN201158664Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies

Landscapes

  • Manufacture Of Iron (AREA)

Abstract

The utility model discloses a clear water tank structure of a furnace granulated slag processing system, which comprises a clear water tank, a water inlet and a water outlet. The clear water tank structure is characterized in that an ascension pipe which is connected with the water outlet is arranged on the water inlet; a pipe cap is arranged at the upper end of the ascension pipe, and the opening of the pipe cap communicates with the ascension pipe. The clear water tank structure has the advantages that the granulated slag in the circulating water stays in the tank and cannot enter a header tank along with the water; the pump inlet of an agitating pump can be effectively prevented from being blocked by the granulated slag, thereby the pump is enabled to normally convey water for a long time, a pneumatic elevator is enabled to normally run for a long time, etc.; the service life of the furnace granulated slag processing system is effectively prolonged, and the repair cycle of the furnace granulated slag processing system is prolonged; the water quality is obviously improved, the equipment operating ratio is improved, and the normal operation of a water-cycling system is ensured; a nozzle in the Jiaheng process is unimpeded, and the water quenching effect of the slag is better; the red slag is less, and the yield and the quality of the slag are correspondingly improved.

Description

The clean water basin structure of Handling Blast Furnace Granulated Slag system
Technical field
The utility model relates to the clean water basin structure of appurtenances, especially the Handling Blast Furnace Granulated Slag system of a kind of Handling Blast Furnace Granulated Slag system.
Background technology
Clean water basin are key parts of Handling Blast Furnace Granulated Slag system, are that recirculated water is here rested in peace, and realize the place of slag-water sepn, and the clinker in the recirculated water precipitates, and waste water is discharged by water port.Because of the conditioned disjunction environmental restraint, clean water basin volume of the prior art is less, thereby is formed on the of short duration for some time (about about 3 months) of back of going into operation, and just collects the unfavorable phenomenon of over two hundred ton of slag, has to carry out stop production to overhaul; So after treating this Chi Shui drained in when maintenance (three months turnarounds), carry out scarfing cinder, but finish in maintenance, after system's operation, the disintegrating slag piece that hardens flows into water and stirs pump, can not stop up pumping hole with avoiding, makes normally water delivery of pump; The settling tank accumulated slag can not be realized stirring; Penumatic elevator cisco unity malfunction, serious threat even are interrupted the ordinary production order; Flow into recycle pump and deliver to good permanent method with pipeline, plug nozzle, water tank are baked bad, the slag water quenching weak effect, and slag can not get sufficient shrend cooling in good permanent method, form 10~20% red clinker, also there is potential safety hazard simultaneously in the strap surface glue of scalding, burn.
Summary of the invention
The utility model is at the above-mentioned deficiency of the Handling Blast Furnace Granulated Slag clean water basin of prior art, and a kind of clean water basin of simple in structure, operation hours long, slag-water sepn is good Handling Blast Furnace Granulated Slag system are provided.
The technical solution of the utility model: the clean water basin structure of Handling Blast Furnace Granulated Slag system comprises clean water basin, water-in and water outlet; It is characterized in that: upcast is set on water outlet, and upcast is connected with water outlet.
Further feature is: the upper end at upcast is provided with pipe cap, and the opening of pipe cap is connected with upcast.
The clean water basin structure of Handling Blast Furnace Granulated Slag of the present utility model system with respect to prior art, has following characteristics:
1, the piece slag in the recirculated water is stayed in the pond, no longer enters water leg with water; Can prevent effectively that clinker from stopping up the pumping hole that stirs pump, make pump normally water delivery for a long time, the long-term works better of airlift function etc.; Effectively prolong the work-ing life of Handling Blast Furnace Granulated Slag system, prolong its turnaround.
2, water quality be improved significantly, improve the equipment operation ratio, guarantee that water circulation system runs well.
3, good permanent method inner nozzle is unimpeded, and the slag water quenching effect is better; Red slag has lacked, and the also corresponding raising of slag output and quality directly produces certain benefit.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described:
Accompanying drawing is the utility model structure diagram;
Embodiment
In figure, 1-clean water basin, 2-water-in, 3-water outlet, 4-upcast, 5-pipe cap, the 6-water surface;
The clean water basin of Handling Blast Furnace Granulated Slag of the present utility model system, comprise clean water basin 1, in clean water basin 1, be provided with water-in 2 and water outlet 3, clean water basin 1 are the places of the slag-water sepn of stove grain slag treatment system, water-in 2 is inlets that slag-water enters clean water basin 1, and water outlet 3 is the effusive outlets of the waste water after slag-water sepn.Above as prior art, be not further described at this.
Improvement of the present utility model is that one section upcast 4 is set on water outlet 3, and upcast 4 is connected with water outlet 3, and waste water is flowed out from water outlet 3 behind upcast 4 earlier; The height of upcast 4 preferably surpasses or greater than highly half of clean water basin 1, the caliber of upcast 4 should be not less than water outlet 3, specifically should be determined by processing parameter.The water surface 6 is schematic height that the waste water in the clean water basin 1 reaches.
Simultaneously, the upper end mouth of pipe of considering upcast 4 easily produces vortex because of near the water surface during suction, make current not steady, in the upper end of upcast 4 pipe cap 5 is set, and pipe cap 5 is connected with the endoporus of upcast 4, and perhaps the opening of pipe cap 5 is connected with the endoporus of upcast 4.After so designing and producing installation, waste water promptly pours in the endoporus of upcast 4 from the opening of pipe cap 5 belows or pipe cap 5, flows out through water outlet 3 to enter water leg again; And the clinker after slag-water sepn just is deposited under action of gravity in the clean water basin 1, plays the effect of slag-water sepn.

Claims (3)

1, the clean water basin structure of Handling Blast Furnace Granulated Slag system comprises clean water basin (1), water-in (2) and water outlet (3); It is characterized in that: upcast (4) is set on water outlet (3), and upcast (4) is connected with water outlet (3).
2, the clean water basin structure of Handling Blast Furnace Granulated Slag according to claim 1 system, it is characterized in that: in the upper end of upcast (4) pipe cap (5) is set, pipe cap (5) is connected with upcast (4).
3, the clean water basin structure of Handling Blast Furnace Granulated Slag according to claim 1 and 2 system is characterized in that: the height of upcast (4) is greater than half of clean water basin (1) height.
CNU2008200977238U 2008-02-28 2008-02-28 Clear water reservoir structure of blast furnace grain slag processing system Expired - Fee Related CN201158664Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200977238U CN201158664Y (en) 2008-02-28 2008-02-28 Clear water reservoir structure of blast furnace grain slag processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200977238U CN201158664Y (en) 2008-02-28 2008-02-28 Clear water reservoir structure of blast furnace grain slag processing system

Publications (1)

Publication Number Publication Date
CN201158664Y true CN201158664Y (en) 2008-12-03

Family

ID=40109257

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200977238U Expired - Fee Related CN201158664Y (en) 2008-02-28 2008-02-28 Clear water reservoir structure of blast furnace grain slag processing system

Country Status (1)

Country Link
CN (1) CN201158664Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105925739A (en) * 2016-05-04 2016-09-07 中冶宝钢技术服务有限公司 Cleaning method and unit for water cooling pond of blast furnace INBA method water slag treatment device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105925739A (en) * 2016-05-04 2016-09-07 中冶宝钢技术服务有限公司 Cleaning method and unit for water cooling pond of blast furnace INBA method water slag treatment device
CN105925739B (en) * 2016-05-04 2018-08-07 中冶宝钢技术服务有限公司 The water cooling pond method for cleaning and device of blast furnace INBA method grain slag processing units

Similar Documents

Publication Publication Date Title
CN109161618A (en) A kind of blast-furnace slag processing system and treatment process
CN105885959B (en) Vertical coal gas washing dehydration integral system
CN201158664Y (en) Clear water reservoir structure of blast furnace grain slag processing system
CN204494455U (en) A kind of drawing-in type combustion furnace chimney gives up fume treatment facility
CN207210142U (en) A kind of system for handling metallurgical off-gas acid-making acid waste water
CN201193229Y (en) Environment protection type blast furnace slag processing equipment by OCP method
CN203530347U (en) Granulation-pump-free high temperature slag water quenching system
CN103130358B (en) Steel slag hot-disintegration circulating water treatment device
CN203214458U (en) Air lifter
CN103834818B (en) Oxygen adding system and method for reactor iron removing
CN204530822U (en) The online Accrete clearing device of a kind of pump sump well
CN209353458U (en) A kind of integrated prefabricated pumping plant with energy dissipating diverter function
CN211284416U (en) Blast furnace slag flushing and white removing equipment
CN109469028B (en) Sand discharging device for dam gate system
CN103525958B (en) A kind of without granulation pump-type high temperature furnace slag water quenching technology and system
CN209210837U (en) A kind of blast-furnace slag processing system
CN206385602U (en) A kind of water supply installation with absorbing well, absorption well sludge clearing function
CN205473843U (en) Energy -conserving high -efficient blast furnace water conservancy towards slag system all
CN105126516A (en) Cylindrical vertical-type wet-type explosion-proof compression-resistant desulphurizing and dedusting device
CN205528133U (en) Coal mine water pipeling formula water processing system
CN220012675U (en) Slag flushing water tank with water slag precipitation structure
CN105885961B (en) The horizontal dewatering integrated system of gas washing
CN105885960B (en) Vertical coal gas desalting and dewatering integral system
CN103937916B (en) Slag granulating system
CN204817968U (en) Electric stove secondary cooling water's water supply system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090220

Address after: Li Zilin, Dadukou District of Chongqing zip code: 400081

Patentee after: Chongqing Iron and Steel Co., Ltd.

Address before: Three weir village Chongqing Dadukou District 1 Building No. 1 Steel Group Technology Development Office, zip code: 400080

Patentee before: Chongqing Iron & Steel (Group) Co., Ltd.

ASS Succession or assignment of patent right

Owner name: CHONGQING STEEL CO., LTD.

Free format text: FORMER OWNER: CHONGQING STEEL(GROUP)CO., LTD.

Effective date: 20090220

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081203

Termination date: 20130228