CN201152602Y - Cold and warm air storage apparatus having multiple power sources for selection - Google Patents

Cold and warm air storage apparatus having multiple power sources for selection Download PDF

Info

Publication number
CN201152602Y
CN201152602Y CNU2007201942903U CN200720194290U CN201152602Y CN 201152602 Y CN201152602 Y CN 201152602Y CN U2007201942903 U CNU2007201942903 U CN U2007201942903U CN 200720194290 U CN200720194290 U CN 200720194290U CN 201152602 Y CN201152602 Y CN 201152602Y
Authority
CN
China
Prior art keywords
power supply
storage device
cold
heater
tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201942903U
Other languages
Chinese (zh)
Inventor
叶明祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007201942903U priority Critical patent/CN201152602Y/en
Application granted granted Critical
Publication of CN201152602Y publication Critical patent/CN201152602Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a cool and heat storage device for selecting various power sources, which comprises a power supply selection unit, a cool and heat selection switch, a refrigerator, a heater, and a storage tank, wherein, the power supply selection unit comprises an assignment selector and an uninterruptible power unit, the assignment selector is positioned inside the uninterruptible power unit; the cool and heat selection switch is connected with the power selection switch; a compressor, a condenser, an expansion valve, an evaporator and freezing solution are arranged inside the refrigerator; the heater is connected with the cool and heat selection switch and is provided with a heating pipe; the evaporator pipeline of the refrigerator is connected to one end of the storage tank, the heating pipe of the heater is connected to the other end of the storage tank, and the storage tank comprises a tank body and liquor which is stored in the tank body and used for heating and cooling. The cool and heat storage device has the advantages that various input power sources can be selected, the cool and heat efficiency is enhanced, the energy is saved, and the cool and heat storage device is suitable for air conditioner equipment on various occasions such as families, companies and selling markets or similar environments.

Description

The changes in temperature gas storage device that the multiple power supply of tool is selected
Technical field
The utility model relates to the changes in temperature gas storage device that the multiple power supply of a kind of tool is selected, especially refer to a kind of Combination Design that a power supply is selected equipment, a cold and hot selector switch, an air conditioner, a heater and an accumulator tank of passing through, make to have multiple input power supply selection, changes in temperature gas improved efficiency and save the energy, and be applicable to household, company, sales field ... wait the air-conditioning equipment or the similar environment of various occasions.
Background technology
Owing to be subjected to the greenhouse effects influence that global warming causes, the variations in temperature of all parts of the world is increasing, very hot during summer, very cold during winter, cause temperature contrast to alter a great deal, it is quite important that the use of air-conditioner just seems, air-conditioner has been people in order to relieving summer heat or warming indispensable electric equipment products, and also becomes family, company, department store, each public arena ... wait indispensable electric equipment products.
Yet, general existing air-conditioner is all and uses the electric power of civil power alternating current for its input, in energy starved modern society, the mode that this kind leans on the civil power alternating current to supply power supply is not fully obviously attained economy, air-conditioner will expend many electric power and increase the expenditure of the electricity charge, the selection mode of therefore general civil power alternating current input electric power obviously can't satisfy following market demand.
Use the change of idea along with the energy, because the alternative energy source scheme of solar electrical energy generation is suggested, though the continuous forever energy that provides by the Nature generates electricity, but it still is subjected to many restrictions on using, solar electrical energy generation carries out opto-electronic conversion in the time of also can only by day sunlight being arranged and becomes electricity usage, but indoor temperature in evening still high (or indoor temperature is low excessively), the utilization rate of air-conditioner is still quite frequent, so be subjected to this one to be restricted to main defective.
Summary of the invention
Main purpose of the present utility model is to overcome the deficiencies in the prior art and defective, the changes in temperature gas storage device that the multiple power supply of a kind of tool is selected is proposed, select equipment by a power supply, one cold and hot selector switch, one air conditioner, the Combination Design of one heater and an accumulator tank, this power supply selection equipment is provided with an assignment selector, this assignment selector suitably distributes the delivery of every electric power of input, select supply electric power to give this air conditioner or the running of this heater by this cold and hot selector switch, when do not have the running of solar energy supply electric power evening, existing storage was cold when liquid turned round because of daytime in the cell body of this accumulator tank, also can continue to supply cold air uses, when cold weather uses heating installation, existing heating when liquid started because of daytime in the cell body of this accumulator tank, also can continue to supply heating installation uses, need not to use other power supply, and increase practicality of the present utility model.
Of the present utility model time a purpose is, a kind of solar cold device of air is proposed, select the Combination Design of equipment, a cold and hot selector switch, an air conditioner, a heater and an accumulator tank by a power supply, this accumulator tank further connects a circulatory system, can distribute output cold air or heating installation to indoor each space, and increase convenience of the present utility model.
For reaching above-mentioned purpose, the utility model provides a kind of tool changes in temperature gas storage device that multiple power supply is selected, comprise: a power supply is selected equipment, this power supply selection equipment includes an assignment selector and a UPS device, this assignment selector is positioned at UPS device, and this assignment selector is controlled this power supply and selected the electric power input of equipment to select; One cold and hot selector switch, this cold and hot selector switch is connected with this power supply selection equipment; One air conditioner, this air conditioner is connected with this cold and hot selector switch, be provided with a compressor, a condenser, an expansion valve and an evaporimeter and freezing liquid in this air conditioner, this compressor compresses freezing liquid connects this condenser, after condensing, this condenser heat radiation connects this expansion valve, connect this evaporimeter after this expansion valve expansion step-down, this evaporimeter heat absorption evaporation back connects back this compressor, this compressor, this condenser, this expansion valve and this evaporimeter are interconnected to closed circuit with pipeline, for cool cycles; One heater, this heater is connected with this cold and hot selector switch, and this heater is provided with a heating tube; And an accumulator tank, the evaporator pipeline of this accumulator tank one end and this air conditioner links, and the heating tube of this accumulator tank other end and this heater links, and this accumulator tank includes cell body and liquid, and this fluid storage is in this cell body, for heating cooling usefulness.
The utlity model has following useful technique effect:
1. the utility model is selected equipment by a power supply, one cold and hot selector switch, one air conditioner, the Combination Design of one heater and an accumulator tank, this power supply selection equipment is provided with an assignment selector, this assignment selector suitably distributes the delivery of every electric power of input, select supply electric power to give this air conditioner or the running of this heater by this cold and hot selector switch, when do not have the running of solar energy supply electric power evening, existing storage was cold when liquid turned round because of daytime in the cell body of this accumulator tank, also can continue to supply cold air uses, when cold weather uses heating installation, existing heating when liquid started because of daytime in the cell body of this accumulator tank, also can continue to supply heating installation uses, need not to use other power supply, and increase practicality of the present utility model.
2. the utility model is selected the Combination Design of equipment, a cold and hot selector switch, an air conditioner, a heater and an accumulator tank by a power supply, this accumulator tank further connects a circulatory system, can distribute output cold air or heating installation to indoor each space, and increase convenience of the present utility model.
Other characteristics of the present utility model and specific embodiment can further be understood in the detailed description of following conjunction with figs..
Description of drawings
Fig. 1 is the framework block schematic diagram of the utility model embodiment;
Fig. 2 is the user mode block schematic diagram of the utility model embodiment;
Fig. 3 is that figure is used in the connection of the utility model embodiment;
Fig. 4 is the detailed circuit schematic of the assignment selector of the utility model embodiment.
Symbol description among the figure
10 power supplys are selected equipment
11 assignment selectors
111 electric power quality-improving device/solar energy frequency converters (Power Factor Correction/PV Inverter)
112 maximum power tracing chargers (MPPT charger)
113 maximum power tracing chargers (MPPT charger)
114 converters (DC/DC Converter)
12 UPS devices
121 chargers (Charge)
122 batteries (Battery)
13 solar electrical energy generations
14 wind-power electricity generations
15 hydroelectric generations
16 civil power alternating currents
20 cold and hot selector switches
30 air conditioners
31 compressors
32 condensers
33 expansion valves
34 evaporimeters
341 pipelines
40 heaters
41 heating tubes
50 accumulator tanks
60 circulatory systems
61 parlors
62 bedrooms
63 dining rooms
64 studies
The specific embodiment
See also Fig. 1~4, the utility model provides a kind of tool changes in temperature gas storage device that multiple power supply is selected, and comprising:
One power supply is selected equipment 10, this power supply selects equipment 10 to include an assignment selector 11 and a UPS device 12, this assignment selector 11 is positioned at UPS device 12, these assignment selector 11 selective direct current inputs and alternating current input, adopt solar electrical energy generation 13, wind-power electricity generation 14, hydroelectric generation 15, at least one electric power input in the civil power alternating current 16 distributes the source of electric power input, to reach the electric power decentralized power supply, wherein, this assignment selector 11 is provided with an electric power quality-improving device/solar energy frequency converter (Power Factor Correction/PVInverter) 111, two maximum power tracing chargers (MPPT charger) 112,114 compositions of 113 and one converter (DC/DC Converter), this each maximum power tracing charger (MPPTcharger) 112,113 are connected with converter (DC/DC Converter) 114, with electric power quality-improving device/solar energy frequency converter (Power Factor Correction/PV Inverter) 111 and connect, this UPS device 12 includes a charger (Charge) 121 and a battery (Battery) 122 again.
One cold and hot selector switch 20, this cold and hot selector switch 20 selects equipment 10 to be connected with this power supply, selects output power for switching.
One air conditioner 30, this air conditioner 30 is connected with this cold and hot selector switch 20, be provided with a compressor 31 in this air conditioner 30, one condenser 32, one expansion valve 33 and an evaporimeter 34 and a freezing liquid, this freezing liquid can adopt refrigerant, bittern, any one of ethylene glycol, these compressor 31 compression freezing liquids connect this condenser 32, after condensing, these condenser 32 heat radiations connect this expansion valve 33, connect this evaporimeter 34 after these expansion valve 33 expansion step-downs, these evaporimeter 34 heat absorption evaporation backs connect back this compressor 31, this compressor 31, this condenser 32, this expansion valve 33 and this evaporimeter 34 are interconnected to closed circuit with pipeline, for cool cycles.
One heater 40, this heater 40 is connected with this cold and hot selector switch 20, and this heater 40 is provided with a heating tube 41.
One accumulator tank 50, evaporimeter 34 pipelines 341 of these accumulator tank 50 1 ends and this air conditioner 30 link, the heating tube 41 of these accumulator tank 50 other ends and this heater 40 links, this accumulator tank 50 includes cell body and liquid, this liquid can adopt any one of bittern, water, this fluid storage is used for the heating cooling in this cell body.
This accumulator tank 50 further connects circulatory systems 60, this circulatory system 60 be provided with at least one ventilation duct and at least one fan for distribute output cold air or heating installation to the parlor 61, bedroom 62, dining room 63 and study 64... etc.
In addition, these accumulator tank 50 another embodiments also can be set to two cell bodies (figure does not show), evaporimeter 34 pipelines 341 of one cell body and this air conditioner 30 link, the liquid cooling but in this cell body, the heating tube 41 of another cell body and this heater 40 links, liquid makes this accumulator tank 50 have Chu Leng and heat accumulation effect simultaneously for heating in this cell body.
See also shown in Fig. 1~4, the changes in temperature gas storage device characteristics that the multiple power supply of the utility model tool is selected are to select equipment 10 by a power supply, one cold and hot selector switch 20, one air conditioner 30, the Combination Design of one heater 40 and an accumulator tank 50, this power supply selects the assignment selector 11 of equipment 10 can select solar electrical energy generation 13, wind-power electricity generation 14, hydroelectric generation 15, at least one electric power input in the civil power alternating current 16 distributes the source of electric power input, for example simultaneously carry out the decentralized power supply effect with the direct current input 80% of solar electrical energy generation and civil power alternating current input 20%, or the distribution combination of other arbitrary electric power input, directly output power is supplied with this cold and hot selector switch 20, and this cold and hot selector switch 20 can be selected output power to start these air conditioner 30 runnings or start this heater 40.
When using cold air, when this air conditioner 30 starts by day, using the first preferential solar electrical energy generation 13 input electric power to start air conditioner 30 running supply cold air uses, and evaporimeter 34 pipelines 341 of this accumulator tank 50 and this air conditioner 30 link, utilize solar electrical energy generation 13 electric power input on daytime, liquid is done the heat exchange action in the freezing liquid in these evaporimeter 34 pipelines 341 and the cell body of this accumulator tank 50, and these accumulator tank 50 storages are cold to reach liquid cools.
After evening, this solar electrical energy generation 13 stopped the electric power input, liquid is done the heat exchange action because of the freezing liquid in evaporimeter 34 pipelines 341 of daytime and this air conditioner 30 in the cell body of this accumulator tank 50, the existing storage of liquid is cold in the cell body of this accumulator tank 50, also can continue to supply cold air and use, need not to re-use other non-firm power input and start these air conditioner 30 cooling circuits.
Moreover this accumulator tank 50 further connects a circulatory system 60, and this circulatory system 60 is provided with corresponding plural ventilation duct and fan, for distributing output cold air to indoor each space, as parlor 61, bedroom 62, dining room 63 and study 64... etc.
This main first preferential solar electrical energy generation 13 can't be powered because of weather is bad or dusk during insufficient light again, it is that (for example importing 50% with direct current input 40%, wind-power electricity generation 10% and the civil power alternating current of solar electrical energy generation simultaneously reaches 100% and carry out the decentralized power supply effect in the auxiliary power input that this power supply selects equipment 10 can select to distribute the input of second electric power as wind-power electricity generation 14, hydroelectric generation 15 or other generating, or the distribution combination of other arbitrary electric power input), its air conditioner 30 is effectively reached reduce use civil power alternating current 16 and energy saving.
When using heating installation, this cold and hot selector switch 20 selects to switch output power to this heater 40, this heater 40 can start by day, use solar electrical energy generation 13 input electric power to start this heater 40, the heating tube 41 of liquid and this heater 40 is done the heat exchange action in the cell body of this accumulator tank 50, makes the cell body heat accumulation of this accumulator tank 50.
After evening, this solar electrical energy generation 13 stopped electric power input, when needing to use heating installation, liquid used so also can supply heating installation because of heat accumulation on daytime in the cell body of this accumulator tank 50, need not to re-use other this heater 40 of electric power input startup.This main first preferential solar electrical energy generation 13 can't be powered because of weather is bad or dusk during insufficient light again, this power supply selects equipment 10 can select to distribute the input of second electric power as wind-power electricity generation 14, hydroelectric generation 15 or other generating are that the auxiliary power input (for example imports 50% with the direct current of solar electrical energy generation simultaneously, wind-power electricity generation 20% and civil power alternating current input 30% and reach 100% and carry out the decentralized power supply effect, or the distribution combination of other arbitrary electric power input), its heater 40 is effectively reached reduce use civil power alternating current 16 and energy saving, making the utility model integral body have the multiple power input selects to distribute with planning, the changes in temperature gas improved efficiency and the saving energy, and increase practicality and convenience.
The above only is preferred embodiment of the present utility model, and when can not be in order to limit the enforceable scope of the utility model, all those skilled in the art obviously can do to change and modification, all should be considered as not departing from flesh and blood of the present utility model.

Claims (9)

1. the changes in temperature gas storage device that the multiple power supply of tool is selected is characterized in that, comprising:
One power supply is selected equipment, and this power supply selection equipment includes an assignment selector and a UPS device, and this assignment selector is positioned at UPS device, and this assignment selector is controlled this power supply and selected the electric power input of equipment to select;
One cold and hot selector switch, this cold and hot selector switch is connected with this power supply selection equipment;
One air conditioner, this air conditioner is connected with this cold and hot selector switch, be provided with a compressor, a condenser, an expansion valve and an evaporimeter and freezing liquid in this air conditioner, this compressor compresses freezing liquid connects this condenser, after condensing, this condenser heat radiation connects this expansion valve, connect this evaporimeter after this expansion valve expansion step-down, this evaporimeter heat absorption evaporation back connects back this compressor, this compressor, this condenser, this expansion valve and this evaporimeter are interconnected to closed circuit with pipeline, for cool cycles;
One heater, this heater is connected with this cold and hot selector switch, and this heater is provided with a heating tube; And
One accumulator tank, the evaporator pipeline of this accumulator tank one end and this air conditioner links, and the heating tube of this accumulator tank other end and this heater links, and this accumulator tank includes cell body and liquid, and this fluid storage is used for the heating cooling in this cell body.
2. the changes in temperature gas storage device that the multiple power supply of tool as claimed in claim 1 is selected is characterized in that, selective direct current input of this assignment selector and alternating current input.
3. the changes in temperature gas storage device that the multiple power supply of tool as claimed in claim 1 is selected, it is characterized in that, this electric power input adopts at least one electric power input of solar electrical energy generation, wind-power electricity generation, hydroelectric generation, civil power alternating current that the source of electric power input is distributed, to reach the electric power decentralized power supply.
4. the changes in temperature gas storage device that the multiple power supply of tool as claimed in claim 1 is selected is characterized in that, this freezing liquid adopts any one of bittern, refrigerant, ethylene glycol.
5. the changes in temperature gas storage device that the multiple power supply of tool as claimed in claim 1 is selected is characterized in that the liquid in this cell body adopts any one of bittern, water.
6. the changes in temperature gas storage device that the multiple power supply of tool as claimed in claim 1 is selected is characterized in that, this accumulator tank further connects a circulatory system.
7. the changes in temperature gas storage device that the multiple power supply of tool as claimed in claim 6 is selected is characterized in that, this circulatory system is provided with at least one ventilation duct and at least one fan is exported cold air or heating installation for distributing.
8. the changes in temperature gas storage device that the multiple power supply of tool as claimed in claim 1 is selected, it is characterized in that, this assignment selector is provided with an electric power quality-improving device/solar energy frequency converter, at least one maximum power tracing charger and a converter, this maximum power tracing charger is connected with converter, again with electric power quality-improving device/solar energy frequency converter and connect.
9. the changes in temperature gas storage device that the multiple power supply of tool as claimed in claim 1 is selected is characterized in that this UPS device includes a charger and a battery.
CNU2007201942903U 2007-12-05 2007-12-05 Cold and warm air storage apparatus having multiple power sources for selection Expired - Fee Related CN201152602Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201942903U CN201152602Y (en) 2007-12-05 2007-12-05 Cold and warm air storage apparatus having multiple power sources for selection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201942903U CN201152602Y (en) 2007-12-05 2007-12-05 Cold and warm air storage apparatus having multiple power sources for selection

Publications (1)

Publication Number Publication Date
CN201152602Y true CN201152602Y (en) 2008-11-19

Family

ID=40128281

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201942903U Expired - Fee Related CN201152602Y (en) 2007-12-05 2007-12-05 Cold and warm air storage apparatus having multiple power sources for selection

Country Status (1)

Country Link
CN (1) CN201152602Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106440544A (en) * 2015-08-05 2017-02-22 江苏金源锻造股份有限公司 Wind-driven air conditioner applicable to various wind speeds
CN112747394A (en) * 2019-10-30 2021-05-04 株式会社土谷特殊农机具制作所 Cold and heat source storage system utilizing solar energy for power generation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106440544A (en) * 2015-08-05 2017-02-22 江苏金源锻造股份有限公司 Wind-driven air conditioner applicable to various wind speeds
CN112747394A (en) * 2019-10-30 2021-05-04 株式会社土谷特殊农机具制作所 Cold and heat source storage system utilizing solar energy for power generation

Similar Documents

Publication Publication Date Title
CN102563960B (en) Solar cold thermoelectricity combined supply system
US20090178421A1 (en) Air conditioning system with multiple power selections
CN204373270U (en) PV air-conditioner Teat pump boiler
CN101893299A (en) Solar adsorption type air-conditioning system based on phase change cold accumulation
CN101832611A (en) Optically, electrically and geothermally integrated air conditioning system device
CN210568969U (en) Double-source heat pump system
CN1877208A (en) Solar air conditioning and water heating system
CN203823962U (en) Household photovoltaic direct current transducer air conditioner supplying hot water
KR20200032345A (en) Solar heat pump system with PVT collector connected
CN110631290A (en) Heat pump energy storage system
CN202050251U (en) Cold-hot co-production microgrid system
CN201152602Y (en) Cold and warm air storage apparatus having multiple power sources for selection
CN206488341U (en) Multi-energy complementation intelligent control HVAC system
CN201159514Y (en) Cold air storage device with multiple electric powers for selection
CN111442441A (en) Heat supply and refrigeration integrated system and method of hydrogen energy and natural energy heat pump
CN208671400U (en) A kind of energy supplying system of providing multiple forms of energy to complement each other using renewable energy
CN216716614U (en) Wind-solar-electric-heat complementary cold-hot water dual-supply system
US20090178423A1 (en) Power selection system for air conditioner
CN115751746A (en) Zero-carbon energy supply system of shallow layer and middle and deep layer geothermal energy coupling light storage system
CN201184644Y (en) Heating storage device with multiple power supply selections
CN114646151A (en) Combined cooling heating and power PVT direct-current heat pump system and operation method
JP3148637U (en) Cold energy storage device with multiple power supply options
CN202675729U (en) Solar air-conditioner heat pump
CN102748896A (en) Integrated system combining complementary power supply device, heat supply and refrigeration
CN102243490A (en) Intelligentized central control system for building energy sources

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081119

Termination date: 20141205

EXPY Termination of patent right or utility model