CN201148742Y - Safe enclosure connection clamp tool - Google Patents
Safe enclosure connection clamp tool Download PDFInfo
- Publication number
- CN201148742Y CN201148742Y CNU2007201910298U CN200720191029U CN201148742Y CN 201148742 Y CN201148742 Y CN 201148742Y CN U2007201910298 U CNU2007201910298 U CN U2007201910298U CN 200720191029 U CN200720191029 U CN 200720191029U CN 201148742 Y CN201148742 Y CN 201148742Y
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- holding tank
- anchor clamps
- clamp
- securing member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a connection clamp for safety protection, which comprises a crossbeam for arranging various components; a vertical rod fixedly arranged on the crossbeam and having a connection fixing member arranged thereon; two clamp plates respectively arranged on both ends of the crossbeam oppositely to form a clamp groove; and a positioning fastener arranged on the crossbeam, wherein the front end of the fastener is arranged in the clamping grooves. The clamp can be fixed on a structural steel beam by being positioned and fastened by the positioning fastener through the clamping groove formed by the clamp plates and the crossbeam. The clamp has the advantages of simple structure and simple disassembly, and can obviate damage to the base material of the structural steel beam caused by the conventional welding manner. The positioning and the fastening operations of the clamp are executed on the steel beam to obviate the safety hazards existing in conventional scaffold hoop mounting operation executed at the lower flange of the steel beam.
Description
Technical field
The utility model relates to a kind of anchor clamps, relates in particular to the safety of using in a kind of building operations and goes along with sb. to guard him jockey.
Background technology
At present; go along with sb. to guard him in the job site at various steel work; need set up protective screening and protect the safety of construction; existing protective screening mounts fixing by fender rod is set; this fender rod generally adopts the mode of welding to be welded on the structural steel beam, and the mode that also has a kind of employing to set up the scaffold tubes anchor ear is provided with the protection peg.The inventor finds that there is following problem at least in above-mentioned prior art:
(1) be welded direct on the structural steel beam, this method shortcoming high-altitude welding capacity is big, and welding is inconvenient, destroys the structure mother metal easily, and dismounting is inconvenient.
(2) directly set up anchor ear with scaffold tubes, anchor ear is to girder steel.This kind method workload is very big, and setting up wastes time and energy, and when setting up the scaffold tubes anchor ear, need have potential safety hazard in the operation of girder steel bottom flange.
Summary of the invention
The utility model embodiment provides a kind of safety to go along with sb. to guard him jockey, by the mode that clamps, makes the fender rod that mounts protective screening can conveniently install on structural steel beam, dismantle.
The purpose of this utility model is achieved through the following technical solutions:
The utility model provides a kind of safety to go along with sb. to guard him jockey, and these anchor clamps comprise:
Crossbeam is used to be provided with each parts;
Vertical rod is fixedly installed on the crossbeam, which is provided with and is connected and fixed part;
Clamping plate comprise two, are separately positioned on the crossbeam two ends, all are oppositely arranged the formation holding tank with crossbeam;
The location securing member is arranged on the crossbeam, and the front end of location securing member is arranged in the described holding tank.
Described clamping plate comprise: a strap is arranged on an end of crossbeam, the corresponding formation holding tank with crossbeam of its base plate;
An ambulatory splint is movably arranged on the other end of crossbeam, and its base plate and crossbeam are to seasonable formation holding tank.
Described location securing member adopts bolt, is arranged on the middle part of crossbeam, cooperates with the nut that is provided with on the crossbeam, and the front end of bolt passes crossbeam and is arranged in the holding tank space between two clamping plate.
Described location securing member is two, respectively on the crossbeam of setting and two holding tank correspondence positions.
Described vertical rod comprises two, is equipped with the part that is connected and fixed that fixedly installs scaffold in each vertical rod.
Described clamping plate comprise: two ambulatory splints, be movably arranged on the two ends of crossbeam respectively, and the base plate of two ambulatory splints and crossbeam are to all forming holding tank at once.
The technical scheme that is provided by above-mentioned the utility model embodiment after the utility model embodiment forms holding tank by clamping plate and crossbeam, fasteningly behind securing member location, location then can be fixed on anchor clamps on the structural steel beam as can be seen.This clamp structure is simple, method for dismounting, the damage of the structural steel beam mother metal that prior welding mode causes can not appear, and by securing member location back, location when fastening, it is top-operation at girder steel, in the time of tradition can not occurring and set up the scaffold tubes anchor ear, need there be the problem of potential safety hazard in the operation of girder steel bottom flange.This is gone along with sb. to guard him jockey safely and can go along with sb. to guard him in the construction at steel work, and vertical vertical rod is installed easily and efficiently, saves material, has shortened the scaffold tubes turn around time.
Description of drawings
Fig. 1 goes along with sb. to guard him the structural representation of jockey for the safety of the utility model embodiment;
Fig. 2 goes along with sb. to guard him the structure chart of jockey for the safety of another embodiment of the utility model;
The specific embodiment
The utility model embodiment is that a kind of safety that is applied in the Construction of Steel Structure is gone along with sb. to guard him jockey, vertical rod, two clamping plate are set on crossbeam and locate securing member, clamping plate and crossbeam form holding tank, the location securing member is arranged on the crossbeam and cooperates the anchor clamps that in use can be fixedly clamped with clamping plate, and vertical rod is provided with the part that is connected and fixed that is used to be provided with scaffold.During use, these anchor clamps are arranged on the structural steel beam by holding tank, are fixedly clamped by the location securing member, and vertical rod can be used for mounting protective screening, are connected and fixed the iron pipe that part is used to be provided with scaffold in the vertical rod.This anchor clamps convenient disassembly, damaged structure girder steel has not avoided in the conventional steel structure construction welding to go along with sb. to guard him that the anchor clamps workload is big, the shortcoming of damaged structure girder steel, has also avoided the employing anchor ear that the unsafe problem of fixture operation is set.
For ease of understanding, describe below in conjunction with accompanying drawing and specific embodiment.
Embodiment one
As shown in Figure 1, the utility model embodiment provides a kind of safety to go along with sb. to guard him jockey, can be used for Construction of Steel Structure, and these anchor clamps comprise: crossbeam 3, vertical rod 1, be connected and fixed part 2, clamping plate and location securing member 4; Wherein, crossbeam 3 is used to be provided with each parts, and the two ends of crossbeam 3 are provided with two clamping plate, and the base plate 5,6 of two clamping plate all is oppositely arranged with crossbeam 3 and forms holding tank 8,9, and crossbeam 3 is provided with location securing member 4, and the front end of location securing member 4 is arranged in the described holding tank.Described vertical rod is two and is arranged on the crossbeam 3, be equipped with in each vertical rod fixedly install scaffold be connected and fixed part 2.
Wherein, two clamping plate can be designed to a strap and an ambulatory splint, and strap is arranged on an end of crossbeam 3, its base plate 5 and crossbeam 3 corresponding formation holding tanks 8; Ambulatory splint 7 is movably arranged on the other end of crossbeam 3,3 pairs of seasonable holding tanks 9 that form of its base plate 6 and crossbeam.
Wherein, described location securing member 4 can adopt bolt, and it is arranged on the middle part of crossbeam 3, cooperates with the nut that is provided with on the crossbeam 3, and the front end of bolt passes crossbeam 3 and is arranged in the holding tank space between two clamping plate; The bolt of the fastening usefulness in location also can all be set on the crossbeam of each holding tank correspondence,, but the utility model be construed as limiting because of locate position and the quantity that securing member 4 is provided with on crossbeam as long as can reach fastening to behind the anchor clamps location.
During use, described anchor clamps integral body is put on the girder steel, makes ambulatory splint 7 rotations, proofread and correct the back and confirm that whole anchor clamps are stabilized on the structural steel beam, then tighten location securing member 4 (as bolt), location securing member 4 front ends hold out against structural steel beam, and anchor clamps are fixed.Vertical rod can be used to mount protective screening, or by the part that is connected and fixed in the vertical rod scaffold tubes is installed.
Embodiment two
As shown in Figure 2, described anchor clamps, also two clamping plate can be arranged on the two ends of crossbeam with the mode that flexibly connects, other structure is identical with embodiment one, so in use, can rotate holding tank that two clamping plate form they and crossbeam cooperates firmly with the structural steel beam of clamping after, locate securing member 4 whole anchor clamps are fixed on the crossbeam by tightening again, the anchor clamps of this structure use more flexible.
In sum, the mode of the described anchor clamps of the utility model embodiment by clamping, not only for convenience detach and damaged structure girder steel not.
The above; it only is the preferable specific embodiment of the utility model; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the variation that can expect easily or replacement all should be encompassed within the protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claim.
Claims (6)
1, a kind of safety is gone along with sb. to guard him jockey, it is characterized in that, these anchor clamps comprise:
Crossbeam (3) is used to be provided with each parts;
Vertical rod (1) is fixedly installed on the crossbeam (3), which is provided with to be connected and fixed part (2);
Clamping plate comprise two, are separately positioned on crossbeam (3) two ends, all are oppositely arranged with crossbeam (3) and form holding tank (8,9);
Location securing member (4) is arranged on the crossbeam (3), and the front end of location securing member (4) is arranged in the described holding tank.
2, anchor clamps according to claim 1 is characterized in that, described clamping plate comprise:
A strap is arranged on an end of crossbeam (3), its base plate (5) and the corresponding formation holding tank of crossbeam (3) (8);
An ambulatory splint (7) is movably arranged on the other end of crossbeam (3), and its base plate (6) and crossbeam (3) are to seasonable formation holding tank (9).
3, anchor clamps according to claim 1, it is characterized in that described location securing member (4) adopts bolt, be arranged on the middle part of crossbeam (3), cooperate with the nut that crossbeam (3) go up to be provided with, the front end of bolt passes crossbeam (3) and is arranged in the holding tank space between two clamping plate.
According to claim 1 or 3 described anchor clamps, it is characterized in that 4, described location securing member (4) is two, respectively on the crossbeam of setting and two holding tank correspondence positions.
5, anchor clamps according to claim 1 is characterized in that, described vertical rod comprises two, are equipped with the part that is connected and fixed that fixedly installs scaffold in each vertical rod.
6, anchor clamps according to claim 1 is characterized in that, described clamping plate comprise:
Two ambulatory splints are movably arranged on the two ends of crossbeam respectively, and the base plate of two ambulatory splints and crossbeam are to all forming holding tank at once.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201910298U CN201148742Y (en) | 2007-12-28 | 2007-12-28 | Safe enclosure connection clamp tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201910298U CN201148742Y (en) | 2007-12-28 | 2007-12-28 | Safe enclosure connection clamp tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201148742Y true CN201148742Y (en) | 2008-11-12 |
Family
ID=40116508
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007201910298U Expired - Lifetime CN201148742Y (en) | 2007-12-28 | 2007-12-28 | Safe enclosure connection clamp tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201148742Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101480779A (en) * | 2009-01-24 | 2009-07-15 | 无锡市奥曼特科技有限公司 | Improved silicon rod clamping structure |
CN103163032A (en) * | 2013-03-29 | 2013-06-19 | 四川大学 | System and method for detecting fatigue strength of steel beam of corrugated steel web |
CN109098463A (en) * | 2018-08-31 | 2018-12-28 | 上海二十冶建设有限公司 | Face the fixation device and its application method of side fence for Construction of Steel Structure |
-
2007
- 2007-12-28 CN CNU2007201910298U patent/CN201148742Y/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101480779A (en) * | 2009-01-24 | 2009-07-15 | 无锡市奥曼特科技有限公司 | Improved silicon rod clamping structure |
CN103163032A (en) * | 2013-03-29 | 2013-06-19 | 四川大学 | System and method for detecting fatigue strength of steel beam of corrugated steel web |
CN103163032B (en) * | 2013-03-29 | 2015-08-05 | 四川大学 | The system and method for detection waveform steel web steel beam fatigue strength |
CN109098463A (en) * | 2018-08-31 | 2018-12-28 | 上海二十冶建设有限公司 | Face the fixation device and its application method of side fence for Construction of Steel Structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107152092B (en) | Mounting method of buried water stop at construction joint and fixing frame used by mounting method | |
CN201148742Y (en) | Safe enclosure connection clamp tool | |
CN105350765A (en) | Double-U-shaped clamp-type anti-skidding universal wall-connecting part for scaffold | |
CN112061339A (en) | A fixed support rod for wallboard assembly | |
CN106499201A (en) | A kind of dismountable safety rope tool-type holding clamp and its using method | |
CN105804422A (en) | Construction method of edge protection | |
CN210649236U (en) | Tool for welding cable clamp and clamping plate of electric pump of oil well | |
CN212389042U (en) | Column type protective device for high-altitude operation | |
CN112031415B (en) | Building templates consolidates square tube fastener | |
CN102544145A (en) | Solar support and method for preventing solar photovoltaic panel from being stolen | |
JP3204834U (en) | Mounting structure of master strut for column beam | |
CN219866908U (en) | Plugging structure | |
CN214302261U (en) | Novel detachable steel structure | |
CN216866040U (en) | Electrolytic steel plate mounting buckle | |
JP2014105426A (en) | Expansion device for road bridge joint part, and water cut-off method | |
CN214558787U (en) | Positioning fixture for assisting in welding elbow and straight pipe | |
CN219528498U (en) | Face limit protection system | |
CN217167165U (en) | Temporary supporting device for steel box girder partition plate | |
CN201507531U (en) | Bolt connecting component of fastener | |
CN214947358U (en) | Municipal administration pipeline mounting structure | |
CN214329849U (en) | Cantilever frame fixing device | |
CN217420621U (en) | Protection railing fixing device | |
CN215060043U (en) | Vibration isolation device for high-temperature pipeline | |
CN208734077U (en) | A kind of building template branch stake tool | |
CN216195442U (en) | Square steel structure convenient to installation is fixed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: China Construction Steel Structure Corp., Ltd. Assignor: China Construction Third Engineering Bureau Co., Ltd. Contract record no.: 2010990000139 Denomination of utility model: Safe enclosure connection clamp tool Granted publication date: 20081112 License type: Exclusive License Record date: 20100324 |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20081112 |