CN201142018Y - Data conversion device of carbon production process monitoring and scheduling system - Google Patents
Data conversion device of carbon production process monitoring and scheduling system Download PDFInfo
- Publication number
- CN201142018Y CN201142018Y CNU2007200813110U CN200720081311U CN201142018Y CN 201142018 Y CN201142018 Y CN 201142018Y CN U2007200813110 U CNU2007200813110 U CN U2007200813110U CN 200720081311 U CN200720081311 U CN 200720081311U CN 201142018 Y CN201142018 Y CN 201142018Y
- Authority
- CN
- China
- Prior art keywords
- data
- production process
- real
- data conversion
- database
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 51
- 238000006243 chemical reaction Methods 0.000 title claims abstract description 29
- 238000012544 monitoring process Methods 0.000 title claims abstract description 14
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 title abstract 4
- 229910052799 carbon Inorganic materials 0.000 title abstract 4
- 239000003610 charcoal Substances 0.000 claims description 15
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 abstract description 3
- 229910052782 aluminium Inorganic materials 0.000 abstract description 3
- 238000005868 electrolysis reaction Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 13
- 230000003993 interaction Effects 0.000 description 7
- 230000005856 abnormality Effects 0.000 description 3
- 239000004411 aluminium Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005538 encapsulation Methods 0.000 description 1
- 238000002834 transmittance Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
Abstract
The utility model relates to a carbon production process system, in particular to a data conversion device for a carbon production process monitoring and scheduling system. The data conversion device comprises (1) a device for exchanging data with a real-time database of the production process; (2) a device for exchanging data with a relationship database; and (3) a data transfer device of the real-time database of the production process and the relationship database of a scheduling system. The data conversion device has the advantages that the data conversion system can achieve data exchange with the real-time database 1 of the production process and with the relationship database 3 and data transfer between the real-time database 1 and the relationship database 3, and has compact logic and tight structure during function calling to ensure the success in reading database and abnormity processing, thus ensuring stable operation of the system in data calling. The data conversion system of carbon production process monitor and scheduling system can be used for information exchange between the real-time database of the production process of aluminum electrolysis industry and the enterprise information relationship database.
Description
Technical field
The utility model relates to the plain production technology of a kind of charcoal system, specifically relates to plain production run monitoring of a kind of charcoal and dispatching system DTU (Data Transfer unit).
Background technology
The conversion of plain production run monitoring of charcoal and dispatching system data is bridges of producing information interaction between real-time data base and the IT application in enterprises relational database, is the problem that the plain manufacturing enterprise of electrolytic aluminium charcoal needs to be resolved hurrily aspect production management always.At present, convert the production run real time data to dispatching system with relation data, convert the dispatching system relation data method of production run real time data to, yet there are no record.
Summary of the invention
The technical problems to be solved in the utility model is at the deficiencies in the prior art, provide a kind of and the production run real time data can be converted to the dispatching system relation data, the dispatching system relation data is converted to the plain production run monitoring of charcoal and dispatching system DTU (Data Transfer unit) of production run real time data.
The plain production run of a kind of charcoal of the utility model is monitored with the dispatching system DTU (Data Transfer unit) and is achieved by following technical proposals: the plain production run monitoring of a kind of charcoal of the utility model comprises production run real-time data base, data conversion system, dispatching system relational database with the dispatching system DTU (Data Transfer unit), and described data conversion system is connected with the production real-time data base; Data conversion system is connected with the dispatching system relational database.
The plain production run monitoring of a kind of charcoal of the utility model has following beneficial effect compared with prior art with the dispatching system DTU (Data Transfer unit): the data conversion system 2 of the utility model device can realize data interaction with production run real-time data base 1 by independently developed single-minded function, and logic is tight, structure is tight in function calls; The data conversion system 2 of the utility model device can realize the data interaction with relational database 3, in the function calls process, the DAO standard is followed in strictness, especially in the data opening procedure, guarantees the successful property and the abnormality processing of data base read-write by Try and Catch function; The data conversion system 2 of the utility model device can realize the data transfer of production run real-time data base 1 and relational database 3, in the transmittance process of real time data and relation data, the tabulation of employing Multiple Cycle, that calls before and after guaranteeing is tight, in the process of frequently calling, make corresponding delay process, the assurance system is in frequent data call, not long-time occupying system resources is to guarantee system stable operation.The plain production run monitoring of a kind of charcoal of the utility model and dispatching system DTU (Data Transfer unit) can be applicable to information between aluminium electroloysis industry production process real-time data base and the IT application in enterprises relational database alternately.
Description of drawings
The plain production run monitoring of a kind of charcoal of the utility model has following accompanying drawing with the dispatching system DTU (Data Transfer unit):
Fig. 1 is plain production run monitoring of a kind of charcoal of the utility model and dispatching system DTU (Data Transfer unit) system architecture synoptic diagram.
Wherein: 1, production run real-time data base; 2, data conversion system; 3, dispatching system relational database.
Embodiment
Plain production run monitoring is further described with dispatching system DTU (Data Transfer unit) technical scheme to a kind of charcoal of the utility model below in conjunction with drawings and Examples.
As shown in Figure 1, the plain production run monitoring of a kind of charcoal of the utility model comprises production run real-time data base 1, data conversion system 2, dispatching system relational database 3 with the dispatching system DTU (Data Transfer unit),
Described data conversion system 2 is connected with production real-time data base 1; Data conversion system 2 is connected with dispatching system relational database 3.
Described data conversion system 2 adopts the Multiple Cycle tabulation to realize the data transfer of production run real-time data base 1 and dispatching system relational database 3.
1) undertaken being connected, logining by data conversion system 2 functions with production run real-time data base data interaction device, and carry out the device of the reading and writing data of production run real-time data base by the api function that production run real-time data base 1 provides with production run real-time data base 1;
2) with the data interaction device of dispatching system relational database by the function in the ADO class of data conversion system 2 carry out being connected with dispatching system relational database 3, inquiry, data set read-write, in the data opening procedure, guarantee the successful property of data base read-write and the device of abnormality processing by Try and Catch function;
3) data transfer device of production run real-time data base and dispatching system relational database is realized the data transfer of production run real-time data base 1 and dispatching system relational database 3 by the Multiple Cycle tabulation of data conversion system 2, and is frequently calling the device of making corresponding delay process in the data procedures.
Between production run real-time data base 1 and dispatching system relational database 3, data conversion system 2 is set, the single-minded function of exploitation voluntarily that provides by data conversion system 2 carries out being connected, logining with production real-time data base 1, and carry out the reading and writing data of production run real-time data base 1 by the api function that production run real-time data base 1 provides, realize data interaction with production run real-time data base 1; Function logic in calling is tight, structure is tight.
By the function in the ADO class of data conversion system 2 encapsulation carry out being connected with dispatching system relational database 3, inquiry, data set read-write, in whole invoked procedure, the DAO standard is followed in strictness, especially in the data opening procedure, by Try and Catch function, guarantee the successful property and the abnormality processing of data base read-write.Realize the data interaction of data conversion system 2 and dispatching system relational database 3.
Realize the data transfer of production run real-time data base 1 and dispatching system relational database 3 by data conversion system 2: in the data transfer of production run real-time data base 1 and dispatching system relational database 3, the tabulation of employing Multiple Cycle, that calls before and after guaranteeing is tight, in the process of much frequently calling, make corresponding delay process, the assurance system is in frequent data call, and not long-time occupying system resources is to guarantee system stable operation.
Claims (1)
1, plain production run monitoring of a kind of charcoal and dispatching system DTU (Data Transfer unit), comprise production run real-time data base (1), data conversion system (2) be set, dispatching system relational database (3), it is characterized in that: described data conversion system (2) with produce real-time data base (1) and be connected; Data conversion system (2) is connected with dispatching system relational database (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200813110U CN201142018Y (en) | 2007-09-30 | 2007-09-30 | Data conversion device of carbon production process monitoring and scheduling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200813110U CN201142018Y (en) | 2007-09-30 | 2007-09-30 | Data conversion device of carbon production process monitoring and scheduling system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201142018Y true CN201142018Y (en) | 2008-10-29 |
Family
ID=40069728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007200813110U Expired - Lifetime CN201142018Y (en) | 2007-09-30 | 2007-09-30 | Data conversion device of carbon production process monitoring and scheduling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201142018Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106126511A (en) * | 2015-12-30 | 2016-11-16 | 宁夏巨能机器人系统有限公司 | A kind of data base management system for intelligence production line and data managing method thereof |
-
2007
- 2007-09-30 CN CNU2007200813110U patent/CN201142018Y/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106126511A (en) * | 2015-12-30 | 2016-11-16 | 宁夏巨能机器人系统有限公司 | A kind of data base management system for intelligence production line and data managing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201142018Y (en) | Data conversion device of carbon production process monitoring and scheduling system | |
CN101609449A (en) | A kind of fast comparison system for data blocks based on Bloom Filter | |
CN201726415U (en) | IEC61850 communication-oriented network wave recorder | |
CN202331221U (en) | Water level monitoring system | |
CN201562288U (en) | Standard card with four small cards | |
CN204390459U (en) | A kind of remote reading meter | |
CN202795025U (en) | Multi-level resource scheduling management system | |
CN202534368U (en) | Metal graphite o-shaped ring | |
CN202276197U (en) | Digital-protection measurement and control device | |
CN103386323B (en) | Quality-improving and viscosity-reducing catalyst and preparation method thereof | |
CN202895761U (en) | Corrosion resistant stamping die | |
CN201116978Y (en) | Capability testing structure for electronic hard disk in nuclear power station computer monitoring system | |
CN201330288Y (en) | Gold nanometer membrane electrode used for electrolyzing high-purity gold | |
CN202661811U (en) | Gas terminal control device capable of improving reliability | |
CN201350481Y (en) | Press die | |
CN201259906Y (en) | Die device for manufacturing dry cell carbon cake | |
CN203330237U (en) | Machine shell surface hole punching die | |
CN204962105U (en) | Integral type FRP pipe flange mould | |
CN201306480Y (en) | A check valve | |
CN201617686U (en) | Thermal insulation drinking water tank | |
CN202033814U (en) | Frame controller of 16 times of failure records | |
CN206795339U (en) | A kind of mobile phone charging interface clamp for machining | |
CN202326614U (en) | Self-centering sealing screwed plug device for heat transfer device | |
CN203037241U (en) | Real-time corrector for depth meter | |
CN202575995U (en) | Phosgene generator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20081029 |
|
CX01 | Expiry of patent term |