CN201141483Y CNU2007203105439U CN200720310543U CN201141483Y CN 201141483 Y CN201141483 Y CN 201141483Y CN U2007203105439 U CNU2007203105439 U CN U2007203105439U CN 200720310543 U CN200720310543 U CN 200720310543U CN 201141483 Y CN201141483 Y CN 201141483Y
Authority
CN
China
Prior art keywords
pipe arrangement
pipe
standpipe
support
prefabricated combination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007203105439U
Other languages
Chinese (zh)
Inventor
王亮
戴运华
徐建忠
钟保华
张永红
尹奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
China Construction Third Bureau Group Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CNU2007203105439U priority Critical patent/CN201141483Y/en
Application granted granted Critical
Publication of CN201141483Y publication Critical patent/CN201141483Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a precasting combined standpipe. A plurality of pipings (1) are arranged in a standpipe single body, the pipings (1) and piping supporting frames (2) are assembled into a whole, the distance between pipings (1) is even, the pipings (1) are provided with piping anti-shaking parts (1), the pipings and the piping supporting frames are connected through the connecting holes (9) of the anti-shaking parts, and guiding plates (10) and lifting lugs (11) are arranged at the upper ends of the pipings (1). The precasting combined standpipe has the advantages that the designed structure is reasonable, the construction progress is accelerated, and the danger is reduced; the one-time pouring of the tube well and the floor plate is performed after the installation of the precasting standpipe is accomplished, the tube well and floor plate are formed into a whole, therefore the potential safety hazard and water leakage hazard are reduced.

Description

A kind of prefabricated combination standpipe
Technical field:
A kind of prefabricated combination standpipe of the utility model relates to construction, particularly a kind of prefabricated combination standpipe of concentrating pipe arrangement of building.
Background technique:
Arranging the standpipe of carrying various media thick and fast in the main pipe well of tall building, and these standpipes are like the main artery that is whole building.How to improve the speed of application and the effect of pipe well standpipe, reduce the security risk of pipe well operation, the construction quality of assurance standpipe, how shortening the holding time of job site vertical transportation machinery and the rapid transport in narrow place etc., is the several difficult that is perplexing electromechanical installation all the time.
If method of construction faces several hang-ups of work efficiency, safety and vertical transportation routinely, at the problems referred to above, propose the Systems Theory of prefabricated combination standpipe, and, reach the standard of practical application through detailed designing and calculating.
Summary of the invention:
The purpose of this utility model is that a kind of tall building of design is concentrated the prefabricated processing of pipe arrangement, the standpipe that makes up and assemble.
Technical solutions of the utility model are achieved in that a kind of prefabricated combination standpipe of making assembling in advance in factory, can carrying out integral installation, it is characterized in that monomer is about 10-12m, monomer has many pipe arrangements, pipe arrangement and pipe arrangement rack making are assembled into one, between each pipe arrangement spacing evenly, be artistically decorated.
Each root standpipe is pressed the drawing fixed-site on pipe support during installation, thereby makes between pipeline and the pipe support,
Between frame and the pipe support, form a metastable integral body (joint) between pipeline and the pipeline.When Construction of Steel Structure when the respective storey, utilize tower crane that the prefabricated combination standpipe of every joint is lifted in the pipe well, accurately in place at last, being equivalent to like this construct has once lifted all standpipes of 2~3 layers in a pipe well, save at last with save between dock.
The beneficial effects of the utility model are:
Project organization is reasonable, makes to concentrate pipe arrangement to become standard product, in the factory process assembling, can realize the operation of batch production continuous-flow type, improves the making assembly quality of prefabricated combination standpipe greatly, has accelerated construction speed, has reduced cost.Site operation has reduced lifting number of times and on-the-spot welding number of times, has reduced danger.Compare with the routine construction, have modularization construction effect, site operation be easy to improve, reliable in quality, safety are controlled, product precision height, pipe well shutoff safety, the reliable several characteristics of waterproof, laggard line pipe well of prefabricated standpipe installation and floor disposal pouring, pipe well and floor are one, have reduced potential safety hazard and the hidden danger of leaking.
Description of drawings:
Fig. 1 plane structure chart
Fig. 2 sectional structure chart
Fig. 3-1 vibrationproof travel(l)ing rest schematic representation
Fig. 3-2 vibrationproof fixed support schematic representation
The non-vibrationproof travel(l)ing rest of Fig. 4-1 schematic representation
The non-vibrationproof fixed support of Fig. 4-2 schematic representation
Fig. 5 mounting plane schematic representation
Fig. 6 mounting vertical plane schematic representation
Embodiment:
The utility model is described in further detail below in conjunction with concrete legend.
Ginseng is made a kind of prefabricated combination standpipe of making assembling in advance in factory, can carrying out integral installation of Fig. 1, Fig. 2, Fig. 5 and Fig. 6, it is characterized in that monomer is about 10-12m, monomer has many pipe arrangements 1, and pipe arrangement 1 is made with pipe arrangement support 2 and is assembled into one, and spacing is even between each pipe arrangement 1; Every joint monomer has the many pipe arrangements 1 that caliber is not of uniform size; Pipe arrangement 1 is made with support 2 and is assembled into one; Pipe support 2 is square, and square shrouding is arranged; There is the circular bore 3 of a plurality of spacing unanimities square pipe support side; The 500mm place respectively establishes an interim supporting element 4 apart from pipe arrangement 1 two ends; The every all default sleeve pipe 5 of pipe arrangement 1, sleeve pipe 5 is established support metal part 4, establishes metal fixing 6 between sleeve pipe 5 and the pipe support 2; Respectively there are 2 circular bore metal fixing 6 both sides between pipe arrangement 1 and the pipe support 2; Pipe arrangement 1 is provided with anti-shake spare 8; Pipe arrangement 1 upper end is provided with guide plate 10 and hanger 11, and the 500mm place establishes an interim supporting element 16 apart from pipe arrangement 1 lower end.
In addition, anti-shake support 8 is used for preventing pipe arrangement 1 rocking in installation process and running; Movable pipe support 2 can appropriateness adjustment be installed perpendicular distance; Connecting plate 12 is used for connecting pipe support and agent structure; Interim supporting element 16 carries out temporary fixed in hoisting process; 4 guide plates 10 of every pipe arrangement upper end are used for carrying out the connection that another saves prefabricated combination standpipe.
With reference to Fig. 5, pipe arrangement is provided with 4 guide plates, being connected between reflection pipe arrangement and the girder steel, be used for carrying out being connected of prefabricated combination standpipe and girder steel, and can adopt according to actual conditions and weld or other modes connect.
Ginseng is made Fig. 6, is the signal of the utility model installation back plane, pipe support 2 and the welding of passing through being connected of agent structure to reserve; The prefabricated combination standpipe of one joint can be finished the concentrated pipe arrangement of layer 2-3, saves time, laborsaving handling safety, reliable in quality.
The parts that the utility model relates to all adopt shaped steel or steel pipe to be welded, batch production processing, assembling, the mechanization degree height, substituted the many disadvantages of conventional on-site handwork, pipe well and floor one-time cast-forming, effectively reduce potential safety hazard and the hidden danger of leaking, improved work efficiency and operation reliability.
Each components modeling of mentioning in this legend is the optimum structure moulding, as adopts other similar moulding, and similar structure is arranged but just the change on installation position or the direction all belong to the utility model protection domain.
Embodiment 2
Ginseng is made Fig. 3, and a kind of for used pipe support 2 of the present utility model is the anti-vibration shape.The vibrationproof travel(l)ing rest is made up of anti-shake support 8, vibrationproof part 13, vibration-proof rubber 14, movable pipe support 2 for vertically can appropriate displacement.The vibrationproof fixed support is a fixed, can not carry out the displacement of horizontal or vertical direction, is made up of fixing part 15, vibration-proof rubber 14, movable pipe support 2.
Embodiment 3
Ginseng is made Fig. 4, and a kind of for used pipe support 2 of the present utility model is the non-anti-vibration shape.Non-vibrationproof travel(l)ing rest is made up of anti-shake support 8, movable pipe support 2 for vertically can appropriate displacement.Non-vibrationproof fixed support is a fixed, can not carry out the displacement of horizontal or vertical direction, is made up of fixing part 15, movable pipe support.

Claims (9)

1, a kind of prefabricated combination standpipe is characterized in that being provided with in the monomer many pipe arrangements (1), and pipe arrangement (1) is made with pipe arrangement support (2) and is assembled into one, and spacing is even between each pipe arrangement (1).
2, prefabricated combination standpipe according to claim 1 is characterized in that, the caliber of described pipe arrangement (1) is not of uniform size.
3, prefabricated combination standpipe according to claim 1 is characterized in that pipe arrangement support (2) for square, and square shrouding is arranged.
4,, it is characterized in that described pipe arrangement 1 two ends respectively establish an interim supporting element (4) according to claim 1 or 2 described prefabricated combination standpipes.
5,, it is characterized in that there is the circular bore (3) of a plurality of spacing unanimities pipe arrangement support (2) side according to claim 1 or 3 described prefabricated combination standpipes.
6, according to claim 1,2 or 4 described prefabricated combination standpipes, it is characterized in that all default sleeve pipe (5) of every pipe arrangement (1), between sleeve pipe (5) and the pipe support (2) metal fixing (6) is arranged.
7,, it is characterized in that respectively there is (2) individual circular bore metal fixing (6) both sides between pipe arrangement (1) and the pipe support (2) according to the described prefabricated combination standpipe of one of claim 1-6.
8, according to claim 1,2,4,6 or 7 described prefabricated combination standpipes, it is characterized in that pipe arrangement (1) is provided with pipe arrangement anti-shake spare (8), the two links to each other by anti-shake spare attachment hole (9).
9,, it is characterized in that being provided with guide plate (10) and hanger (11) in pipe arrangement (1) upper end according to claim 1,2,4,6,7 or 8 described prefabricated combination standpipes.
CNU2007203105439U 2007-12-13 2007-12-13 Prefabricated composite stand pipe Expired - Fee Related CN201141483Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007203105439U CN201141483Y (en) 2007-12-13 2007-12-13 Prefabricated composite stand pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007203105439U CN201141483Y (en) 2007-12-13 2007-12-13 Prefabricated composite stand pipe

Publications (1)

Publication Number Publication Date
CN201141483Y true CN201141483Y (en) 2008-10-29

Family

ID=40069194

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007203105439U Expired - Fee Related CN201141483Y (en) 2007-12-13 2007-12-13 Prefabricated composite stand pipe

Country Status (1)

Country Link
CN (1) CN201141483Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603504A (en) * 2013-11-26 2014-02-26 中建二局第三建筑工程有限公司 Method of hoisting super high-rise building electrochemical large-diameter rises along with progress of main structure
CN104060948A (en) * 2014-06-05 2014-09-24 宝鸡石油机械有限责任公司 Assembly welding method for marine riser and auxiliary pipe bracket
CN104149065A (en) * 2014-07-24 2014-11-19 苏州众捷汽车零部件有限公司 Pre-fitted part for connecting vertical tube

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603504A (en) * 2013-11-26 2014-02-26 中建二局第三建筑工程有限公司 Method of hoisting super high-rise building electrochemical large-diameter rises along with progress of main structure
CN104060948A (en) * 2014-06-05 2014-09-24 宝鸡石油机械有限责任公司 Assembly welding method for marine riser and auxiliary pipe bracket
CN104060948B (en) * 2014-06-05 2016-01-20 宝鸡石油机械有限责任公司 The assembly welding method of marine riser, auxiliary pipe holder
CN104149065A (en) * 2014-07-24 2014-11-19 苏州众捷汽车零部件有限公司 Pre-fitted part for connecting vertical tube
CN104149065B (en) * 2014-07-24 2016-06-08 苏州众捷汽车零部件有限公司 Couple standpipe pre-assembled part

Similar Documents

Publication Publication Date Title
CN204524692U (en) Precision controlling frock
CN201141483Y (en) Prefabricated composite stand pipe
CN102518300B (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN203361354U (en) Beam column pitch point connecting device
CN101177933B (en) Bridge rib hoisting and supporting rack integral construction method and device
CN203199913U (en) Assembling and disassembling type hoisting truss
CN104314009A (en) Large segment lifting mechanism and use method thereof
CN107097062A (en) A kind of stacker-reclaimer revolution intersects the replacing options of bearing
CN104233961A (en) Triangular supporting bracket of suspended cast bridge block 0
CN204728217U (en) Positioning plate device for assembling steel box girder segments
CN103806530B (en) Special-shaped overhanging steel structure and construction method thereof
CN203429556U (en) System for quickly installing and positioning cable saddle
CN103334584B (en) Template regulating system for sliding form system
CN103174300B (en) Viscous damper installation construction method
CN204504600U (en) For assistance platform and the bracing or strutting arrangement thereof of the welding of jack up drilling platform spud leg
CN201873949U (en) Bride prestress stretch-draw trolley
CN204676905U (en) The assembled shipping platform of nuclear power CB20 module whole
CN203755167U (en) Assistant mounting device of V-shaped steel pipe frame of tower bridge
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN204823671U (en) Node grout clamp underwater installation complementary unit
CN110820518B (en) Machining and hoisting method for steel arch bridge suspender
CN205205664U (en) Concrete king -post connection structure
CN203867164U (en) Cantilever type scaffold structure with positioning steel pipe
CN113336144A (en) Device convenient to large-scale ball valve dismouting of hydroelectric set and horizontal transport
CN108423120B (en) Construction method of torsion box unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: THE FIRST CONSTRUCTION ENGINEERING COMPANY OF CHI

Free format text: FORMER OWNER: THE FIRST CONSTRUCTION ENGINEERING COMPANY OF CHINA CONSTRUCTION NO.3 BUREAU

Effective date: 20081010

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081010

Address after: No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan Province, China: 430040

Co-patentee after: China Construction three Bureau Construction Engineering Co., Ltd.

Patentee after: China Construction three bureau first construction project limited liability company

Address before: No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan Province, China: 430040

Patentee before: The First Construction Engineering Company of China Construction No.3 Bureau

CU03 Correction of utility model patent gazette

Correction item: Co-patentee

Correct: China Construction Third Engineering Bureau Co., Ltd.

False: China Construction three Bureau Construction Engineering Co., Ltd.

Number: 47

Page: 799

Volume: 24

ERR Gazette correction

Free format text: CORRECT: COMMON ¬ PATENTEE; FROM: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU CORP., LTD. TO: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU CONSTRUCTION ENGINEERING CO., LTD.,

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Huang Gang

Inventor after: Wang Liang

Inventor after: Dai Yunhua

Inventor after: Xu Jianzhong

Inventor after: Zhong Baohua

Inventor after: Zhang Yonghong

Inventor after: Yin Kui

Inventor before: Wang Liang

Inventor before: Dai Yunhua

Inventor before: Xu Jianzhong

Inventor before: Zhong Baohua

Inventor before: Zhang Yonghong

Inventor before: Yin Kui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG LIANG DAI YUNHUA XU JIANZHONG ZHONG BAOHUA ZHANG YONGHONG YIN KUI TO: HUANG GANG WANG LIANG DAI YUNHUA XU JIANZHONG ZHONG BAOHUA ZHANG YONGHONG YIN KUI

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081029

Termination date: 20161213