CN201138035Y - 一种实现能量梯级利用制热水的大中型热水空调机组 - Google Patents
一种实现能量梯级利用制热水的大中型热水空调机组 Download PDFInfo
- Publication number
- CN201138035Y CN201138035Y CNU2007203105335U CN200720310533U CN201138035Y CN 201138035 Y CN201138035 Y CN 201138035Y CN U2007203105335 U CNU2007203105335 U CN U2007203105335U CN 200720310533 U CN200720310533 U CN 200720310533U CN 201138035 Y CN201138035 Y CN 201138035Y
- Authority
- CN
- China
- Prior art keywords
- water
- heat
- compressor
- energy
- condenser
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007203105335U CN201138035Y (zh) | 2007-12-13 | 2007-12-13 | 一种实现能量梯级利用制热水的大中型热水空调机组 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007203105335U CN201138035Y (zh) | 2007-12-13 | 2007-12-13 | 一种实现能量梯级利用制热水的大中型热水空调机组 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201138035Y true CN201138035Y (zh) | 2008-10-22 |
Family
ID=40038722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007203105335U Expired - Fee Related CN201138035Y (zh) | 2007-12-13 | 2007-12-13 | 一种实现能量梯级利用制热水的大中型热水空调机组 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201138035Y (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109442783A (zh) * | 2018-11-06 | 2019-03-08 | 中建五局第三建设有限公司 | 一种超高能效冷热联产区域能源供应方法及系统 |
CN109945366A (zh) * | 2019-03-27 | 2019-06-28 | 珠海格力电器股份有限公司 | 水多联机组控制方法和空调水机系统及其控制方法 |
-
2007
- 2007-12-13 CN CNU2007203105335U patent/CN201138035Y/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109442783A (zh) * | 2018-11-06 | 2019-03-08 | 中建五局第三建设有限公司 | 一种超高能效冷热联产区域能源供应方法及系统 |
CN109945366A (zh) * | 2019-03-27 | 2019-06-28 | 珠海格力电器股份有限公司 | 水多联机组控制方法和空调水机系统及其控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201037719Y (zh) | 一种梯级提升水温的热水热泵机组 | |
CN201476406U (zh) | 低温准双级空气源热泵装置 | |
CN201081367Y (zh) | 热回收型地源热泵装置 | |
CN102022793B (zh) | 基于潜热回收的高效热泵型热源塔溶液再生装置及方法 | |
CN101403540A (zh) | 一种热泵式制热、制冰方法和装置 | |
CN101221007B (zh) | 空气源热泵热水机组 | |
CN201764750U (zh) | 回收中央空调机组冷凝热的水源热泵冷热水节能装置 | |
CN103047802A (zh) | 空气源热泵冬季除霜系统 | |
CN202757346U (zh) | 中央空调和热水一体机 | |
CN102767921B (zh) | 一种双路预冷的高效热泵装置及其控制方法 | |
CN101876496A (zh) | 一种双蒸发器直燃型吸收式冷热水机组 | |
CN101294753B (zh) | 一种内循环复合能供热制冷装置 | |
CN102829588B (zh) | 用于空调系统的除霜装置及循环能源中央空调热水系统 | |
CN200975813Y (zh) | 冷水机组壳管式冷凝器的热回收装置 | |
CN201138034Y (zh) | 一种同时供冷、制取生活热水和开水的中央空调热泵装置 | |
CN105423620A (zh) | 一种高效的大温升两级节流中间冷却热泵热水机 | |
CN101191680A (zh) | 双级全热回收水冷螺杆冷水机组 | |
CN201034400Y (zh) | 一种空气源热泵热水器的除霜装置 | |
CN201875830U (zh) | 基于潜热回收的高效热泵型热源塔溶液再生装置 | |
CN201387143Y (zh) | 一种带储分器的低温空气源热泵高温节能型热水器装置 | |
CN201138035Y (zh) | 一种实现能量梯级利用制热水的大中型热水空调机组 | |
CN201917067U (zh) | 双冷凝器热泵热水器 | |
CN204115286U (zh) | 一种复叠式直热高温热泵 | |
CN203848548U (zh) | 空气源热泵多用机组 | |
CN202675731U (zh) | 一种双路预冷的高效热泵装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Shandong Yateer Group Co., Ltd. Assignor: Zhang Maoyong Contract fulfillment period: 2009.7.1 to 2012.6.30 Contract record no.: 2009990000748 Denomination of utility model: Large and medium hot-water air conditioner set realizing hot water preparation by energy casecade use Granted publication date: 20081022 License type: General permission Record date: 20090714 |
|
LIC | Patent licence contract for exploitation submitted for record |
Free format text: COMMON LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.7.1 TO 2012.6.30; CHANGE OF CONTRACT Name of requester: SHANDONG YATEER GROUP CO., LTD. Effective date: 20090714 |
|
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Shandong Yateer Group Co., Ltd. Assignor: Zhang Maoyong Contract fulfillment period: 2009.10.30 to 2015.10.29 Contract record no.: 2009990001238 Denomination of utility model: Large and medium hot-water air conditioner set realizing hot water preparation by energy casecade use Granted publication date: 20081022 License type: Exclusive license Record date: 20091110 |
|
LIC | Patent licence contract for exploitation submitted for record |
Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.10.30 TO 2015.10.29; CHANGE OF CONTRACT Name of requester: SHANDONG YATEER GROUP CO., LTD. Effective date: 20091110 |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081022 Termination date: 20141213 |
|
EXPY | Termination of patent right or utility model |