CN201137294Y - Scaffold board fixing clip - Google Patents

Scaffold board fixing clip Download PDF

Info

Publication number
CN201137294Y
CN201137294Y CNU200720199578XU CN200720199578U CN201137294Y CN 201137294 Y CN201137294 Y CN 201137294Y CN U200720199578X U CNU200720199578X U CN U200720199578XU CN 200720199578 U CN200720199578 U CN 200720199578U CN 201137294 Y CN201137294 Y CN 201137294Y
Authority
CN
China
Prior art keywords
scaffold
hoist
floor
hole
drag hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200720199578XU
Other languages
Chinese (zh)
Inventor
陈忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CNU200720199578XU priority Critical patent/CN201137294Y/en
Application granted granted Critical
Publication of CN201137294Y publication Critical patent/CN201137294Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A scaffold board fixation card belongs to the building construction technology field, in particular to a design technology of a subsidiary tool of building construction, which is characterized in that the shape of two blocks of cross section looks like a rectangle platform and a slit board whose external side has a hole in the center is separately extended from two ends of the platform towards outsides and is tightly cladded on the scaffold on two ends of the hoist, a drag hook whose one rod has a screw is hooked with the hoist of the scaffold, and the rod pieces the hole on the external side from the bottom to the top and is tightly fixed by a nut which pieces the screw. The utility model has the advantages of having the fixation card for fixing the scaffold on the upper face of the steel pipe of the hoist, making the scaffold and the hoist form an integral, not generating slipping or dropping accidents of the scaffold from the hoist when the workers walk casually, ensuring the safety of the construction.

Description

The fixing card of scaffold floor
Technical field
Belong to technical field of building construction, exactly relate to the designing technique of building operations with aid.
Background technology
In the building operations, often scaffold floor to be placed on the steel pipe scaffold, the workman stands in operation on the scaffold floor, sometimes in order to operate construction, to on scaffold floor, stroll about, just have the situation of the scaffold floor end of stepping on, the other end is sticked up, thereby cause the workman to drop, the generation accident from scaffold.
Summary of the invention
Even the utility model provides the workman scaffold floor end of stepping on, can not cause the other end to stick up yet, the workman can be from the fixing card of the scaffold floor that scaffold is dropped.
The technical scheme that the utility model is taked:
The fixing card of scaffold floor, comprise scaffold and the scaffold floor that is shelved on the scaffold, its scheme is: two cross section shapes such as the protruding platform of rectangle, the long and narrow plate of outside with holes, a center is outwards respectively extended at two ends, wrap tightly the scaffold floor that rests two ends on the scaffold, the threaded drag hook of bar, drag hook catches on the scaffold of leg rest palm, its bar passes the hole of outer sideband from bottom to top, and passes screw threads for fastening by mother sieve.
Good effect behind enforcement the utility model is:
Fixedly card has been arranged, scaffold floor is fixed on above the scaffolding steel pipe, made scaffold floor and scaffold form integral body, how careless workman walks about can not produce the accident that scaffold floor landing or turn over from the scaffold falls yet, and has guaranteed the safety of construction.
Description of drawings
Fig. 1, be the utility model three-dimensional structure diagram;
Fig. 2, be user mode figure
The specific embodiment
Now the utility model is described in further detail in conjunction with the accompanying drawings
The fixing card of scaffold floor, comprise scaffold and the scaffold floor that is shelved on the scaffold, its structure is: two cross section shapes such as the protruding platform of rectangle, the long and narrow plate 2 of outside with holes, a center is outwards respectively extended at two ends, wrap tightly the threaded drag hook 1 of 3, one bars of scaffold floor that rests two ends on the scaffold, drag hook catches on the scaffold 4 of leg rest palm, its bar passes the hole of outer sideband from bottom to top, and passes screw threads for fastening by mother sieve.

Claims (1)

1, the fixing card of scaffold floor, comprise scaffold and the scaffold floor that is shelved on the scaffold, it is characterized in that: two cross section shapes such as the protruding platform of rectangle, the long and narrow plate (2) of outside with holes, a center is outwards respectively extended at two ends, wrap tightly the scaffold floor (3) that rests two ends on the scaffold, a threaded drag hook of bar (1), drag hook catch on the scaffold (4) of leg rest palm, its bar passes the hole of outer sideband from bottom to top, and passes screw threads for fastening by mother sieve.
CNU200720199578XU 2007-12-21 2007-12-21 Scaffold board fixing clip Expired - Fee Related CN201137294Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200720199578XU CN201137294Y (en) 2007-12-21 2007-12-21 Scaffold board fixing clip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200720199578XU CN201137294Y (en) 2007-12-21 2007-12-21 Scaffold board fixing clip

Publications (1)

Publication Number Publication Date
CN201137294Y true CN201137294Y (en) 2008-10-22

Family

ID=40037980

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200720199578XU Expired - Fee Related CN201137294Y (en) 2007-12-21 2007-12-21 Scaffold board fixing clip

Country Status (1)

Country Link
CN (1) CN201137294Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967265A (en) * 2014-05-09 2014-08-06 于法周 Scaffold reinforcing device
CN104453210A (en) * 2014-11-25 2015-03-25 中国一冶集团有限公司 Assembly type fixing device and method for putlock
CN104453211A (en) * 2014-11-25 2015-03-25 中国一冶集团有限公司 Combined type fixing device and method for putlock
CN104453204A (en) * 2014-12-09 2015-03-25 重庆建工第九建设有限公司 Cantilever scaffold board
CN104453209A (en) * 2014-11-25 2015-03-25 中国一冶集团有限公司 Pressing rod type fixing device and method for putlock
CN108532928A (en) * 2018-06-28 2018-09-14 厦门安科科技有限公司 A kind of frame climbing structure easy for installation
GB2563232A (en) * 2017-06-06 2018-12-12 Patrick Connell Joseph Board clamp

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967265A (en) * 2014-05-09 2014-08-06 于法周 Scaffold reinforcing device
CN104453210A (en) * 2014-11-25 2015-03-25 中国一冶集团有限公司 Assembly type fixing device and method for putlock
CN104453211A (en) * 2014-11-25 2015-03-25 中国一冶集团有限公司 Combined type fixing device and method for putlock
CN104453209A (en) * 2014-11-25 2015-03-25 中国一冶集团有限公司 Pressing rod type fixing device and method for putlock
CN104453209B (en) * 2014-11-25 2016-09-21 中国一冶集团有限公司 Putlock pressure lever type fixing device and method
CN104453210B (en) * 2014-11-25 2016-09-21 中国一冶集团有限公司 Putlock assembled fixing device and method
CN104453204A (en) * 2014-12-09 2015-03-25 重庆建工第九建设有限公司 Cantilever scaffold board
GB2563232A (en) * 2017-06-06 2018-12-12 Patrick Connell Joseph Board clamp
CN108532928A (en) * 2018-06-28 2018-09-14 厦门安科科技有限公司 A kind of frame climbing structure easy for installation

Similar Documents

Publication Publication Date Title
CN201137294Y (en) Scaffold board fixing clip
WO2015038479A3 (en) Power lock system for stage truss towers
CN103206074A (en) Elevator shaft template construction method, platform and support
CN105908963B (en) A kind of scaffold standing plate
CN203160674U (en) Scaffold board fixing clamp
CN203116934U (en) Detacher
CN205116589U (en) Foldable stair tread
CN204475182U (en) The mounting tool of a kind of Railway Bridges And Piers pier top hanging basket
CN203129560U (en) Scaffold fall protector
WO2013054274A3 (en) Locking mechanism
CN203114149U (en) Pedal ladder
CN211341671U (en) Scaffold frame for spraying convenient to height-adjusting
CN208456185U (en) A kind of tower crane wall-connecting piece safe walkway
CN203201056U (en) Stair capable of being horizontally placed
CN203925265U (en) A kind of square bar folding ladder
CN207151128U (en) Guardrail before a kind of garden supervisor
CN203175030U (en) Mobile flower disc for scaffold
CN204324837U (en) A kind of telescopic high-altitude operation platform
CN110700542A (en) Scaffold frame for spraying convenient to height-adjusting
CN205476417U (en) Hang footboard suitable for scaffold
CN204357098U (en) Overarm scaffold floor
CN203228169U (en) Tool used for mounting spinning assembly
CN205777888U (en) A kind of transformer station sucked type fence bracing frame
CN204326949U (en) A kind of construction ladder
CN203889955U (en) Tower crane attachment device of bridge tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081022

Termination date: 20131221