CN201137229Y - Novel suspended ceiling overhauling port - Google Patents
Novel suspended ceiling overhauling port Download PDFInfo
- Publication number
- CN201137229Y CN201137229Y CNU2007201820569U CN200720182056U CN201137229Y CN 201137229 Y CN201137229 Y CN 201137229Y CN U2007201820569 U CNU2007201820569 U CN U2007201820569U CN 200720182056 U CN200720182056 U CN 200720182056U CN 201137229 Y CN201137229 Y CN 201137229Y
- Authority
- CN
- China
- Prior art keywords
- access
- secondary joist
- joist
- slide rail
- access hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Residential Or Office Buildings (AREA)
Abstract
The utility model relates to a novel ceiling access port which is mainly composed of an access panel, a slide rail, a primary joist, an access hole and a secondary joist. The secondary joist is installed on the primary joist, the slide rail is mounted on the secondary joist, the access panel for opening and closing the access hole is mounted on the secondary joist through the slide rail, and the access panel is in sliding engagement with the secondary joist. The periphery of the access hole is edged. The novel ceiling access port has the advantages that the novel ceiling access port is simple in structure and easy in resetting the access plate, the ceiling internally pipelines can not be collided, the access board can not be easily lost, and the novel ceiling access port is safe and reliable, convenient in use and beautiful in appearance.
Description
Technical field
The utility model relates to industry and civilian construction decorative engineering field, mainly is a kind of novel furred ceiling access hole.
Background technology
In existing technology, to the setting of furred ceiling access hole, unit in charge of construction generally adopts upper-turn-type access hole or movable detachable access hole.Building furred ceiling interior conduit pipeline is many, and various device, valve are hidden in furred ceiling mostly, access hole frequency of utilization height.Common upper-turn-type access hole, the easy pipeline in the collision furred ceiling in the time of unlatching causes damage to pipeline, and is poor in inspection the reset difficulty, impression of back access hole that finish, and causes the maintenance panel to lose easily, stays potential safety hazard.
The utility model content
The utility model purpose is exactly the deficiency that will overcome above-mentioned technology, and a kind of novel furred ceiling access hole is provided.
The utility model solves the technical scheme that its technical problem adopts: this novel furred ceiling access hole, mainly form by maintenance panel, slide rail, main joist, manhole and secondary joist, secondary joist is installed on the main joist, slide rail is installed on secondary joist, the maintenance panel that is used to open and close manhole is installed in secondary joist by slide rail, and maintenance panel and secondary joist are and are slidingly matched.
Be provided with fringing around the described manhole.
The effect that the utility model is useful is: the utility model simple structure, access panel reset easily, can not collide the furred ceiling gut line, can not cause access panel to be lost, and be safe and reliable, easy to use, good looking appearance.
Description of drawings
Fig. 1 is an access hole plan view of the present utility model;
Fig. 2 is an access hole sectional drawing of the present utility model.
Description of reference numerals: maintenance panel 1, slide rail 2, main joist 3, manhole 4, fringing 5, secondary joist 6.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is described in further detail.
As shown in the figure, this novel furred ceiling access hole, mainly be made up of maintenance panel 1, slide rail 2, main joist 3, manhole 4 and secondary joist 6, this novel furred ceiling access hole is installed when furred ceiling is constructed synchronously, bears the load of whole access hole by main joist 3, secondary joist 6.Secondary joist 6 is installed on the main joist 3, slide rail 2 is installed on secondary joist 6, the maintenance panel 1 that is used to open and close manhole 4 is installed in secondary joist 6 by slide rail 2, and maintenance panel 1 and secondary joist 6 are and are slidingly matched; Be provided with fringing 5 around the manhole 4, fringing 5 adopts the stainless steel fringing, makes access hole more attractive in appearance.
Operating principle: according to moving a principle, slide rail 2 is installed on secondary joist 6, maintenance panel 1 is by being installed in the slide rail 2 on the secondary joist 6, under the maintainer promotes gently, maintenance panel 1 can slide on secondary joist 6 by slide rail 2, open and close manhole 4, easy to use, can not collide entities such as furred ceiling gut line.
In the house decoraton construction stage, furred ceiling interior conduit pipeline is many, and various switches, valve are all hidden in furred ceiling.Access hole quantity is many, frequency of utilization is high, and the quality quality of access hole directly influences the impression and the result of use of furred ceiling.Novel furred ceiling access hole only needs to promote gently the maintenance panel when opening, the maintenance panel slides along slide rail, exposes manhole, resets easily after maintenance finishes, and only needs that access panel is touched back original position and gets final product.
In addition to the implementation, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of the utility model requirement.
Claims (2)
1, a kind of novel furred ceiling access hole, it is characterized in that: mainly form by maintenance panel (1), slide rail (2), main joist (3), manhole (4) and secondary joist (6), secondary joist (6) is installed on the main joist (3), slide rail (2) is installed on secondary joist (6), the maintenance panel (1) that is used to open and close manhole (4) is installed in secondary joist (6) by slide rail (2), and maintenance panel (1) and secondary joist (6) are and are slidingly matched.
2, novel furred ceiling access hole according to claim 1 is characterized in that: be provided with fringing (5) around the described manhole (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201820569U CN201137229Y (en) | 2007-12-21 | 2007-12-21 | Novel suspended ceiling overhauling port |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201820569U CN201137229Y (en) | 2007-12-21 | 2007-12-21 | Novel suspended ceiling overhauling port |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201137229Y true CN201137229Y (en) | 2008-10-22 |
Family
ID=40037915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007201820569U Expired - Fee Related CN201137229Y (en) | 2007-12-21 | 2007-12-21 | Novel suspended ceiling overhauling port |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201137229Y (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102844505A (en) * | 2010-03-22 | 2012-12-26 | 可耐福石膏板有限公司 | Closable inspection opening for dry construction |
CN105178494A (en) * | 2015-09-08 | 2015-12-23 | 上海黑之白建筑设计有限公司 | Manually-operated sliding rail type suspended ceiling |
CN105569250A (en) * | 2016-02-02 | 2016-05-11 | 浙江嘉和装饰有限公司 | GRG suspended ceiling |
CN105587105A (en) * | 2014-10-23 | 2016-05-18 | 深圳市中建南方建设集团有限公司 | Drawer type access hole formed in ceiling |
CN106522449A (en) * | 2016-12-26 | 2017-03-22 | 上海声望声学科技股份有限公司 | Anechoic room inner top sheltering structure |
CN106760124A (en) * | 2016-12-31 | 2017-05-31 | 天津力盾工程检测有限公司 | A kind of plate body structure for being easy to construct |
CN108265873A (en) * | 2018-02-08 | 2018-07-10 | 浙江亚厦装饰股份有限公司 | A kind of furred ceiling finished product maintenance port device that can be opened and closed |
-
2007
- 2007-12-21 CN CNU2007201820569U patent/CN201137229Y/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102844505A (en) * | 2010-03-22 | 2012-12-26 | 可耐福石膏板有限公司 | Closable inspection opening for dry construction |
CN102844505B (en) * | 2010-03-22 | 2015-09-30 | 可耐福石膏板有限公司 | For the closed inspection hole of dry construction |
CN105587105A (en) * | 2014-10-23 | 2016-05-18 | 深圳市中建南方建设集团有限公司 | Drawer type access hole formed in ceiling |
CN105178494A (en) * | 2015-09-08 | 2015-12-23 | 上海黑之白建筑设计有限公司 | Manually-operated sliding rail type suspended ceiling |
CN105569250A (en) * | 2016-02-02 | 2016-05-11 | 浙江嘉和装饰有限公司 | GRG suspended ceiling |
CN105569250B (en) * | 2016-02-02 | 2017-09-12 | 浙江嘉和装饰有限公司 | A kind of GRG ceiling suspended ceilings |
CN106522449A (en) * | 2016-12-26 | 2017-03-22 | 上海声望声学科技股份有限公司 | Anechoic room inner top sheltering structure |
CN106760124A (en) * | 2016-12-31 | 2017-05-31 | 天津力盾工程检测有限公司 | A kind of plate body structure for being easy to construct |
CN108265873A (en) * | 2018-02-08 | 2018-07-10 | 浙江亚厦装饰股份有限公司 | A kind of furred ceiling finished product maintenance port device that can be opened and closed |
CN108265873B (en) * | 2018-02-08 | 2024-02-06 | 浙江亚厦装饰股份有限公司 | Suspended ceiling finished product access hole device capable of being opened and closed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201137229Y (en) | Novel suspended ceiling overhauling port | |
CN202689293U (en) | Curtain box structure | |
CN204081340U (en) | A kind of integrated belt decorative module | |
CN204469862U (en) | A kind of spray equipment of coal pulverizer | |
CN205029996U (en) | Whole control airfield equipment case | |
CN207165028U (en) | Hydroelectric line comprehensive wiring actual training device | |
CN205444625U (en) | Bathroom roof | |
CN203808412U (en) | 3D aluminum-plastic panel | |
CN203796057U (en) | Pneumatic switch watertight door device | |
CN202321885U (en) | Top structure for elevator car | |
CN205174275U (en) | Casual reflection configuration of light trough inner wall | |
CN205475783U (en) | Combination metal wedge | |
CN205543822U (en) | Double -deck box -type substation | |
CN204370654U (en) | A kind of architectural decoration secondary top | |
CN204553453U (en) | The three-dimensional link of medical decorative sheet corner | |
CN204298889U (en) | A kind of vertical luminous fire hydrant | |
CN202809959U (en) | Tertiary top connecting structure of integrated ceiling | |
CN203930623U (en) | A kind of fan door gate machine cabinet with data transmission interface | |
CN203597577U (en) | Combined computer desk | |
CN202772473U (en) | High-low voltage shielded box type transformer station | |
CN202695999U (en) | Illumination power distribution box | |
CN207972600U (en) | Jacking after a kind of school bus | |
CN207484798U (en) | Curve keel fixed connection structure | |
CN202902635U (en) | Buried box of gas water heater | |
CN206034717U (en) | A open subassembly for ceiling mounting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081022 Termination date: 20131221 |