CN201137022Y - Fragment-free rail long steel rail track laying traction machine - Google Patents

Fragment-free rail long steel rail track laying traction machine Download PDF

Info

Publication number
CN201137022Y
CN201137022Y CNU200720082620XU CN200720082620U CN201137022Y CN 201137022 Y CN201137022 Y CN 201137022Y CN U200720082620X U CNU200720082620X U CN U200720082620XU CN 200720082620 U CN200720082620 U CN 200720082620U CN 201137022 Y CN201137022 Y CN 201137022Y
Authority
CN
China
Prior art keywords
rail
tractor
laying
track
wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU200720082620XU
Other languages
Chinese (zh)
Inventor
陈叔
史渡
陶中兴
刘连学
龚成光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
Original Assignee
China Railway Erju Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CNU200720082620XU priority Critical patent/CN201137022Y/en
Application granted granted Critical
Publication of CN201137022Y publication Critical patent/CN201137022Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model discloses a track laying tractor of long rails of ballastless tracks, which comprises a driving cab (1), a hydraulic system (2), a motor (3), a lorry-mounted crane (4), a walking device (5), a traction device (6) and a hydraulic winch (8). The track laying tractor of long rails of ballastless tracks is characterized in that an obstacle evading and detecting device (9) is arranged on bilateral sides in the front of the tractor main body, a plurality of guide means (7) are disposed behind the obstacle evading and detecting device (9) which emits signals to a PLC programmable controller, and the PLC programmable controller receives signals and then controls the guide means (7). The track laying tractor of long rails of ballastless tracks resolves the problem that rail pad rollers are knocked over when the long rails are pushed in the past, eliminates possibility of track fastenings damage and other safety incipient fault, improves construction and economic benefits, can rapidly haul long rails with length of 500 m or less to be used in rail laying constructions, which is in particular adapted for ballastless track rail laying constructions of high-speed railways and has good market outlook.

Description

The ballastless track long steel rail tractor of laying a railway track
Technical field
The utility model relates to a kind of high-speed railway when building 500m and following laying of welded long rails equipment especially relates to a kind of drawing to the ballastless track long steel rail of the track laying position tractor of laying a railway track on will long rail transport vehicle.
Background technology
The structure of ballastless track of high-speed railway is made up of bridge or roadbed, seat concrete or hydraulicity supporting layer, rail fastening on track slab system and rail etc., at first at the seat concrete or the hydraulicity supporting layer of bridge floor of having built or roadbed, and then laid rail guidance tape, the laying of track plate is accurately to adjust disposable up to standardly according to the line design key element, and then lays long rail on the track plate.Traditional ballasted track laying of welded long rails mainly adopts single pillow continuous laying method, the laying of batch (-type) list pillow, long rail to push and lay or change the shop method and carry out at home.These four kinds of paving modes having in the quarrel railway roadbed laying of welded long rails at home used more (Qinhuangdao Shenyang Special Passenger Line); Long rail pushes mainly will lack in factory after the rail welding growth rail, be transported on the existing line by four layers of transport vehicle, unloading the long rail car pusher propelling movement of rail place utilization rail, transport vehicle retreats simultaneously, long rail is unloaded the job practices on the curb that is put in the circuit both sides; Changing shop laying of welded long rails method mainly is at newly-built ew line a kind of laying of welded long rails method of carrying out on the quarrel railway roadbed to be arranged, at first be laid to the short rail track of 25m or 12.5m with track-laying machine, after whole road is up to standard, transport vehicle is transported to the job site with long rail then, unload on the curb that is put in the circuit both sides, utilize and manually will lack the rail dismounting, long rail is changed to a kind of laying method of circuit.These two kinds of methods are mainly used in the common laying construction method that quarrel railway roadbed railway is arranged.Single pillow continuous laying method, batch (-type) list pillow are laid on the long rail of the disposable laying of high-speed railway that is mainly used in the quarrel railway roadbed, and long rail is dragged long rail in the circuit both sides by caterpillar tractor, and the pillow that looses is then received a kind of paving mode of rail.These two kinds of job practicess are mainly used in single pillow method laying of welded long rails construction of quarrel railway roadbed.More than four kinds of methods can satisfy the construction needs having on the quarrel railway roadbed, but on non-fragment orbit, change the shop method owing to do not have rail on the track, track construction equipment can't arrive the job location and can't satisfy the construction needs.Single pillow or continuous laying and single pillow be laying method intermittently, all be to adopt caterpillar tractor to carry out laying of welded long rails, but on the track plate face of having laid on the no tiny fragments of stone, coal, etc. railway roadbed, caterpillar tractor can't traveling, causes railway roadbed to damage because caterpillar tractor walking on no tiny fragments of stone, coal, etc. railway roadbed can damage the track plate.Though the long rail method that pushes can be used for the laying of welded long rails construction of non-fragment orbit, but in the process that pushes long rail,, rail downwarp meeting props up a pad roller or a rail clip because answering back to, cause the security incident that breaks rail clip or cause other, and efficiency of construction is very low.
The utility model content
The purpose of this utility model provides a kind of safe, the ballastless track long steel rail of the high efficiency tractor of laying a railway track.
The utility model in order to achieve the above object, the utility model adopts following technical scheme: a kind of ballastless track long steel rail tractor of laying a railway track, comprise driver's cabin, hydraulic system, motor, truck-mounted crane, running gear, draw-gear, hydraulic wireline winch, be provided with obstacle in the both sides, fuselage the place ahead of tractor and dodge checkout gear, dodge the checkout gear rear at obstacle and be provided with a plurality of guiding devices, obstacle is dodged checkout gear and is sent a signal to the PLC programmable logic controller, controls guiding device after the PLC programmable logic controller received signal.
Described obstacle is dodged checkout gear by detecting wheel, constituting near switch, shock absorber, mount pad, wherein the mount pad upper end is fixed on the installing plate of fuselage both sides, the mount pad inferoanterior is equipped with the detection wheel by hinged journal stirrup, one end of shock absorber is installed on the wheel arm that detects wheel, the other end of shock absorber is installed in the mount pad back lower place, be provided with near switch at middle part, mount pad lower end, be connected with the PLC programmable logic controller near the switch via line.
Described guiding device is made of oil cylinder and guide wheel, and wherein guide wheel is installed on the oil cylinder, and the flexible of oil cylinder controlled by control PLC system device able to programme.
The utility model ballastless track long steel rail is laid a railway track tractor can be by running gear traveling on track plate face edge, can long rail be drawn to the job location of laying a railway track by draw-gear, improved operating efficiency, and lead by guiding device in the tractor traveling process, the safety traffic of tractor on the track panel edges and the stationarity of traction have been guaranteed, and dodge checkout gear by obstacle and realize that guiding device dodges the D type block of track plate side, guaranteed the normal guiding of tractor in the distraction procedure, avoid the tractor sideslip or slide down and cause the damage of equipment and railway roadbed, thereby improved the safety in the distraction procedure.
The beneficial effects of the utility model are: the utility model had solved in the long in the past rail propelling movement and has knocked the problem that rail props up the pad roller over, and the damage of having eliminated rail clip may reach other safe hidden danger, and improved construction and economic benefit.Can draw 500m and the following long rail construction operation of laying a railway track fast.Particularly be applicable to the non-fragment orbit steel rail laying construction of high-speed railway, have fabulous market prospects.
Description of drawings
Fig. 1 is an equipment general assembly drawing of the present utility model;
Fig. 2 is the structural representation that the obstacle in the utility model is dodged checkout gear 9.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
The lay a railway track structure of tractor of a kind of ballastless track long steel rail of the utility model is seen Fig. 1, shown in Figure 2: as to comprise driver's cabin 1, hydraulic system 2, motor 3, truck-mounted crane 4, running gear 5, draw-gear 6, hydraulic wireline winch 8, be provided with obstacle in the both sides, fuselage the place ahead of tractor and dodge checkout gear 9, dodge checkout gear 9 rears at obstacle and be provided with a plurality of guiding devices 7, obstacle is dodged checkout gear 9 and is sent a signal to the PLC programmable logic controller, control guiding device 7 after the PLC programmable logic controller received signal, described obstacle is dodged checkout gear 9 by detecting wheel 10, near switch 11, shock absorber 12, mount pad 13 constitutes, wherein mount pad 13 upper ends are fixed on the installing plate of fuselage both sides, mount pad 13 inferoanteriors are hinged with by journal stirrup and detect wheel 10, on the wheel shaft of one end installation and measuring wheel 10 of shock absorber 12, the other end is installed in 13 times rears of mount pad, be provided with near switch 11 at middle part, mount pad 13 lower ends, be connected with the PLC programmable logic controller near switch 11 via line.Described guiding device 7 is made of oil cylinder 14 and guide wheel 15, and wherein guide wheel 15 is installed on the oil cylinder 14, oil cylinder 14 flexible by the PLC Controlled by Programmable Controller.PLC programmable logic controller in the utility model can adopt existing module or be made of existing components and parts.Can adopt existing product near switch 11.
The utility model ballastless track long steel rail is laid a railway track the normal traveling of tractor when track plate 16, detect wheel 10 lower periphery than the low 20mm in plane on the D type block on the track plate side, when detection travelling wheel 10 is run into D type block, detection wheel 10 is put backward and is rolled on plane on the D type block, drive simultaneously near the inductive switching head rest near switch 11, send " ON " signal near switch 11 inductions and to the PLC programmable logic controller, under the effect of PLC programmable logic controller, oil cylinder 14 is mentioned first guiding device guide wheel 15 fast, strides across D type block.Under the effect of PLC programmable logic controller, distance travelled equally by calculating, also mention other directive wheel successively, stride across D type block.After detection wheel 10 strides across D type block, under the effect of shock absorber 12 springs, detect wheel 10 and recover reset condition again, drive simultaneously near the inductive switching head, send " OFF " signal near switch 11 inductions and to the PLC programmable logic controller away near switch 11.Under the effect of PLC programmable logic controller, oil cylinder 14 puts down first directive wheel 15 fast, again guiding.Under the effect of PLC programmable logic controller, distance travelled equally by calculating, also put down other directive wheel 15 successively, again guiding.
The long rail tractor specific embodiment of laying a railway track of laying a railway track
1,, when loading and transporting long rail, should guarantee that every one steel rail all drops on the space of corresponding interval iron at the long rail car loading operation of long rail storage pad.
2, on six rail fastening down cars of train central authorities, with lock rail device long accordingly rail is locked in pairs, every pair of rail must lock at same rail flat car, at first bus front end and trailer rear end anticollision device, collision-prevention device and safe buting iron is installed simultaneously.
3, long rail transport vehicle arrives the job location and once stopped, obtain the rail transport train to be hung with dividing rail car connection after yard man's instruction, be pushed to the position of laying a railway track (the rail dolly I front-wheel center line that falls is apart from completing the about 350mm of rail end) together with the rail dolly that falls and stop, stamp scotch block.
4, remove to draw on the lock rail car long rail locking device.
5, the anticollision device, collision-prevention device on the dismounting first bus and the soon safe buting iron of dilatory a pair of rail are adjusted to minute rail device lateral and will draw the corresponding position of rail, will divide the side direction roller on the rail device to transfer to maximum position simultaneously.As dilatory upper strata rail, also lifting long wheel frame should be adjusted to proper height.
6, the steel wire penetrating on the winding plant is fallen rail dolly rail drawing strickle guide, divide the rail drawing strickle guide after, unclamped the rail head of a pair of long rail to be spread with the rail clamping device clamping.
7, start hoist engine, long rail is hauled out from tie transport vehicle group, and tell to the car body both sides by a minute rail device, adjust the position of dividing the rail drawing strickle guide, making the rail inner width is 1435mm, and connects by the rail dolly I that falls, the rail dolly II that falls, the extremely long rail tractor draw-gear of the rail dolly III that falls smoothly.The order of laying a railway track is for earlier going up afterwards to descend, and every layer of rail specifically laying is (from left to right compiling rail altogether 1 to No. 14) in proper order:
For the first time: No. 4 and No. 11;
For the second time: No. 3 and No. 12;
For the third time: No. 2 and No. 13;
The 4th time: No. 1 and No. 14;
The 5th time: No. 5 and No. 10;
The 6th time: No. 6 and No. 9;
The 7th time: No. 7 and No. 8;
8, the dilatory forward rail of long rail tractor.In the dilatory process of rail, placing a cylinder between the railway roadbed sleeper about every 10m.
9, as long rail tail end hauling-out roller dolly III, long rail tractor must slow down dilatory speed (≤15m/min), after long rail tail end is hauled out roller dolly II, tractor speed slows down once more, and get in touch with contraposition by intercommunication and tractor driver, surpass about steel rail laying rail end 100mm up to long rail tail end.
10, remove rail clamping device, push back rail and spread rail and be connected with tractor.
11, take out the roller of following pad of long rail, it is in place to make long rail go into groove, and installation in time and fastening (unit of laying a railway track pass through after again installation remain fastener).
12, regain rail on the way and prop up the pad roller, descend the long rail track laying circulation of a pair of 500m.
13, after 28 one steel rails on the train have been laid, remove to divide between rail car and the long rail transport vehicle group to connect, long rail transport vehicle group is returned the base of laying a railway track and is loaded and transported long rail.

Claims (3)

1, a kind of ballastless track long steel rail tractor of laying a railway track, comprise driver's cabin (1), hydraulic system (2), motor (3), truck-mounted crane (4), running gear (5), draw-gear (6), hydraulic wireline winch (8), it is characterized in that: be provided with obstacle in the both sides, fuselage the place ahead of tractor and dodge checkout gear (9), dodge checkout gear (9) rear at obstacle and be provided with a plurality of guiding devices (7), obstacle is dodged checkout gear (9) and is sent a signal to the PLC programmable logic controller, controls guiding device (7) after the PLC programmable logic controller received signal.
2, the ballastless track long steel rail according to claim 1 tractor of laying a railway track, it is characterized in that: described obstacle is dodged checkout gear (9) by detecting wheel (10), near switch (11), shock absorber (12), mount pad (13) constitutes, wherein mount pad (13) upper end is fixed on the installing plate of fuselage both sides, mount pad (13) inferoanterior is equipped with by hinged journal stirrup and detects wheel (10), on the wheel arm of one end installation and measuring wheel (10) of shock absorber (12), the other end is installed in mount pad (13) back lower place, be provided with near switch (11) at middle part, mount pad (13) lower end, be connected with the PLC programmable logic controller near switch (11) via line.
3, the ballastless track long steel rail according to claim 1 tractor of laying a railway track, it is characterized in that: described guiding device (7) is made of oil cylinder (14) and guide wheel (15), wherein guide wheel (15) is installed on the oil cylinder (14), oil cylinder (14) flexible by the PLC Controlled by Programmable Controller.
CNU200720082620XU 2007-12-21 2007-12-21 Fragment-free rail long steel rail track laying traction machine Expired - Lifetime CN201137022Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200720082620XU CN201137022Y (en) 2007-12-21 2007-12-21 Fragment-free rail long steel rail track laying traction machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200720082620XU CN201137022Y (en) 2007-12-21 2007-12-21 Fragment-free rail long steel rail track laying traction machine

Publications (1)

Publication Number Publication Date
CN201137022Y true CN201137022Y (en) 2008-10-22

Family

ID=40037708

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200720082620XU Expired - Lifetime CN201137022Y (en) 2007-12-21 2007-12-21 Fragment-free rail long steel rail track laying traction machine

Country Status (1)

Country Link
CN (1) CN201137022Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071606A (en) * 2010-12-14 2011-05-25 株洲长远铁路建机股份有限公司 Multi-sleeper type long rail laying machine set and rail laying method thereof
CN108860216A (en) * 2018-06-22 2018-11-23 贵州大学 A kind of tunnelling with lifting rail is longitudinally shunt structure
CN108868877A (en) * 2018-06-22 2018-11-23 贵州大学 A kind of tunnelling based on soft floor is longitudinally shunt structure
CN109252866A (en) * 2018-06-22 2019-01-22 贵州大学 A kind of tunnelling longitudinal direction shunting method based on soft floor
CN109487648A (en) * 2018-04-25 2019-03-19 刘保平 Collapsible gapless line enters scouring machine automatically and gapless line is extracted into slot operational method
CN114318970A (en) * 2022-02-23 2022-04-12 内蒙古鑫铁爱特机械有限公司 Railway turnout transporting and laying all-in-one machine and transporting method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071606A (en) * 2010-12-14 2011-05-25 株洲长远铁路建机股份有限公司 Multi-sleeper type long rail laying machine set and rail laying method thereof
CN109487648A (en) * 2018-04-25 2019-03-19 刘保平 Collapsible gapless line enters scouring machine automatically and gapless line is extracted into slot operational method
CN109487648B (en) * 2018-04-25 2020-08-18 刘保平 Folding type automatic groove entering machine for long steel rail and operation method for extracting and entering long steel rail into groove
CN108860216A (en) * 2018-06-22 2018-11-23 贵州大学 A kind of tunnelling with lifting rail is longitudinally shunt structure
CN108868877A (en) * 2018-06-22 2018-11-23 贵州大学 A kind of tunnelling based on soft floor is longitudinally shunt structure
CN109252866A (en) * 2018-06-22 2019-01-22 贵州大学 A kind of tunnelling longitudinal direction shunting method based on soft floor
CN114318970A (en) * 2022-02-23 2022-04-12 内蒙古鑫铁爱特机械有限公司 Railway turnout transporting and laying all-in-one machine and transporting method thereof
CN114318970B (en) * 2022-02-23 2023-12-22 内蒙古鑫铁爱特机械有限公司 Railway turnout operation and paving integrated machine and railway turnout operation and paving method

Similar Documents

Publication Publication Date Title
RU2696396C2 (en) High-carrying-capacity non-stop rail transit system
CN201137022Y (en) Fragment-free rail long steel rail track laying traction machine
CN102102317B (en) Method for laying mixed passenger and freight jointless track and bridge erecting machine for erecting railway T-beam
CN101050615B (en) Construction method for laying seamless track by CPG500 type seamless track long rail laying machine set
CN104816732B (en) A kind of quick interval single-hole double-layer track subway
CN110722940B (en) Road and railway dual-purpose bidirectional running traction and cargo carrying transport vehicle and use method thereof
CN2898099Y (en) Crane trolley for spreading lane board in tunnel
CN105221162B (en) Light section super long tunnel transportation system and transportation resources
CN211032067U (en) Highway-railway dual-purpose bidirectional driving traction and cargo carrying transport vehicle
CN102002898A (en) Construction method of group-sleeper long rail track-laying unit for laying seamless track ballasted beds
GB2024288A (en) Machine for replacing the rails and sleepers of a railway track
CN213328698U (en) Prefabricated member mounting equipment for high-speed railway bridge deck system
CN102071606A (en) Multi-sleeper type long rail laying machine set and rail laying method thereof
US3812788A (en) Transport installation with independent vehicles
CN109229134B (en) Bidirectional emergency anti-slip braking device for electric locomotive
CN113968250A (en) Molten iron combined transport toothed rail tractor, operation system and method
CN201137023Y (en) Fragment-free rail long steel rail placing device
CN201933372U (en) Sleeper group type long rail laying unit
CN102101480B (en) Track traffic lane changing equipment
CN201317902Y (en) Unballasted track lathe long rail bar paving machine set
CN216511624U (en) TBM rear-matched level-crossing tank truck moving and transporting system
CN201024361Y (en) Coal mine down-hole floating crossing
CN103434513B (en) Magnetic suspension sprocket drive public transportation system
CN111133172A (en) Transport and transport system for tunnel buildings
CN211592577U (en) Monorail bidirectional mine field car pusher

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160106

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

Address before: 610041 high building, No. nine Hing Road, Chengdu hi tech Development Zone, Sichuan, 6

Patentee before: China Railway Erju Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20081022

CX01 Expiry of patent term