CN201111139Y - Container pier producing resource collocation optimizing system - Google Patents

Container pier producing resource collocation optimizing system Download PDF

Info

Publication number
CN201111139Y
CN201111139Y CNU2007200983516U CN200720098351U CN201111139Y CN 201111139 Y CN201111139 Y CN 201111139Y CN U2007200983516 U CNU2007200983516 U CN U2007200983516U CN 200720098351 U CN200720098351 U CN 200720098351U CN 201111139 Y CN201111139 Y CN 201111139Y
Authority
CN
China
Prior art keywords
server
real
area network
local area
scientific
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2007200983516U
Other languages
Chinese (zh)
Inventor
王伟
杨志新
张弸
林洪为
王莉
张彪
马国学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Five Continents International Container Terminal Co Ltd
Original Assignee
Tianjin Five Continents International Container Terminal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Five Continents International Container Terminal Co Ltd filed Critical Tianjin Five Continents International Container Terminal Co Ltd
Priority to CNU2007200983516U priority Critical patent/CN201111139Y/en
Application granted granted Critical
Publication of CN201111139Y publication Critical patent/CN201111139Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The utility model provides a container terminal production resource allocation optimizing system, which comprises a system implementing signal transmission between a server group of the Division of Technology and Information and an integrated plan optimizing system, a container stuffing reservation system, an assignment assessment system, a real-time monitoring system and a duty shifting system through local area network; the server group includes a server having a plurality of functions, actual job data read from the related server by each system are processed by the respective system and stored on the related server, the related server is accessed by the local area network, thus realizing the real-time inquiry and update of information of the optimizing system. The optimizing system has the effect that the system set is put into the running of all posts at present, the wharf digital management is realized through the implementation of the container terminal production resource allocation optimizing system, thereby improving the scientific nature and decision level of decision-making and command of all departments, increasing the production efficiency of the container terminal and realizing the joint track with the modern management style of the international port.

Description

Container wharf resources of production configuration optimization system
Technical field
The utility model relates to a kind of container wharf resources of production configuration optimization system.
Background technology
Aspect shipping work plan formulation, overall planning person subjective works out the shipping work plan according to shipping work experience in the past, lacks scientificly, and planning of making can't obtain assessment before operation, also can't compare afterwards, lack planning rational checking.Aspect the suitcase plan declares; the business hall is done to lack between Dan Yuan and the site plan and is linked up; quantity is declared in uncontrollable plan; busy not busy uneven situation appears through regular meeting; part place machine work is heavy; stop up in the pier storage yard or boat land transportation operation conflict, and part machinery is idle, has reduced the service efficiency of container wharf.Therefore for balancing machine uses, make full use of machine resource, be badly in need of between the business hall, erecting the bridge of linking up in site plan.
Aspect monitoring operation, control person saw list of instructions during the COSMOS operating system of harbour use at present can only make, the operation situation of machinery, the job scheduling of boats and ships are not grasped intuitively, lacked Rule of judgment, can't make in time and adjusting the site work situation.
Aspect job analysis, the analytical statement content that the COSMOS system that harbour uses provides is single, can't satisfy the needs of job analysis, job analysis in the past needs 3 ~ 4 people by each channel image data, and the analysis of drawing, the job analysis of carrying out boats and ships often needs 2 ~ 3 day time, and work efficiency is very low, is badly in need of the analysis report that a kind of strong instrument can provide shipping work at short notice.And carry out in every day in the meeting of handing over to the next shift of each department, all adopt oral introduction operation situation, the pattern that the participant remembers while listening, and the content of introducing and imperfect, relieve to reach and pass on operation situation round the clock accurately, the purpose of comprehensively assigning a work.
Summary of the invention
For solving the problem that exists in the above-mentioned technology, the purpose of this utility model provides a kind of container wharf resources of production configuration optimization system, be beneficial to improve the equilibrium degree that the container wharf manufacturing machine utilizes, help improving the modern management level and the container wharf production efficiency at harbour simultaneously.
In order to address the above problem, the technical solution adopted in the utility model provides a kind of container wharf resources of production configuration optimization system, this system includes the scientific and technological information portion that is communicated with LAN (Local Area Network), wherein: this system also comprises the overall planning optimization system of mutual electrical connection, the suitcase reservation system, the operation evaluating system, the real-time monitoring system and the system that relieves make the group of server and the described overall planning optimization system of scientific and technological information portion by described LAN (Local Area Network), the suitcase reservation system, the operation evaluating system, real-time monitoring system and relieving carries out the optimization system that the signal transmission is formed between the system; The group of server of described scientific and technological information portion includes AS400/DB2 server, ORACLE server, application server and message server, the actual job data that described overall planning system, suitcase reservation system, operation evaluating system, real-time monitoring system and the system that relieves read from described AS400/DB2 server are respectively by on the ORACLE server that is stored in scientific and technological information portion after the system handles separately, by described LAN (Local Area Network) visit ORACLE server, realize that the information of this optimization system is inquired about in real time, real-time update again.
Effect of the present utility model is that this cover system has dropped among the operation in each post at present, enforcement by container wharf resources of production configuration optimization system has realized the harbour digital management, improve the decision-making commander's of all departments science and decision-making level, improved container wharf production efficiency, realization integrates with International Ports modern management mode.
Description of drawings
Fig. 1 is an optimization system syndeton synoptic diagram of the present utility model.
Embodiment
In conjunction with the embodiments container wharf of the present utility model resources of production configuration optimization system is described in detail.
As shown in Figure 1, container wharf of the present utility model resources of production configuration optimization system includes the scientific and technological information portion (figure does not show) that is communicated with LAN (Local Area Network), and this system also comprises overall planning optimization system 1, operation evaluating system 2, suitcase reservation system 3, the real-time monitoring system 4 of mutual electrical connection and the system 5 that relieves.Overall planning system 1 makes shipping work plan science, reasonable more by system-computed, and can store planning process, and contrast actual job process is reviewed, and the rationality of assessment planning promotes the planner to work out the raising of shipping work plan level simultaneously.The use of overall planning system 1 also makes some conventional planning chart typing contents calculate automatically by system and reads, and saves working time, and the planner is put into energy in other work.The mechanical work scheme that suitcase reservation system 3 is worked out by site plan, the prompting business hall is done the plan in single Yuan each place and is declared quantity, uses thereby reach balancing machine, guarantees the purpose of place operation order.Real-time monitoring system 4 provides patterned site work information to middle control person, enables to grasp boats and ships and site work progress, in time pinpoints the problems, handles problems.Operation evaluating system 2 can provide required various forms of analyst and graphical report in the very first time after shipping work finishes, improve the efficient of analytical work.5 of the systems that relieves are by reading and processing the other system data, in the meeting of handing over to the next shift, show operation situation round the clock with patterned form to the participant, make that relieve can more clear, concrete, standard, the participant is comprehensively understood the operation situation round the clock and following focus.In a word, the resources of production are distributed the use of system rationally, manage from planning site work, before operation, preparing the control the operation from harbour, grasping the operation effectiveness analysis from the operation situation is all effectively promoted, by cooperatively interacting of each system, plan, monitoring, analytical work are digested, thereby promote operating efficiency and management level.
This container wharf resources of production configuration optimization system by LAN (Local Area Network) at unit (more than the internal memory 512M, more than the hard disk 20G, WINS 2000/XP, contain Oracal 9i client, the AS400 client, net.framework1.1, ODP.net applied environment) go up and realize real time access, data read and the server that relates to of storage are safeguarded by scientific and technological information portion, are comprised AS400/DB2 server 6, ORACLE server 7, message server 8 and application server 9.Wherein AS400/DB2 server 6 is servers of COSMOS system, stores whole harbour actual job data, is the general data source of harbour resources of production configuration optimization system.7 of ORACLE servers are the data processing and the storage servers of resources of production configuration optimization system, after processing by the form of oneself, the actual job data that each system reads from AS400/DB2 server 6 are stored on the ORACLE server 7, managerial personnel can use the system of installing on any computing machine by LAN (Local Area Network) visit ORACLE server 7, realize that system information is inquired about in real time, real-time update.8 of message servers are the data processing platform (DPP)s of real-time monitoring system 4, and supervisory system carries out data read and handle by message server 8 producing the monitoring formation on the one hand, and the monitor staff obtains monitor message by access message server 8 on the one hand.Application server 9 is data processing platform (DPP)s of the system of relieving 5, integrates oracle server and AS400/DB2 data in server, produces graphical information.The signal transmission relation is as described below between concrete system:
The management platform of overall planning system 1 can be assisted overall planning person's science, reasonably be arranged container wharf macroscopic view production plan.Overall planning system 1 is installed in unit (more than the internal memory 512M, more than the hard disk 20G, WINS 2000/XP, contain Oracal 9i client, the AS400 client, net.framework1.1, ODP.net applied environment) on, the planner uses boats and ships basic data that this system makes, sailing date catalogue, production task, allocation of berths, shipping work plan to be stored on the Oracal server 7, and staff planners can check the production plan of storage at any time by the server of this system of access to netwoks.And operation evaluating system 2, real-time monitoring system 4 and the system 5 that relieves also can read by the server of LAN (Local Area Network) to this optimization system: the system that wherein relieves 5 reads sailing date catalogue, production task and allocation of berths information, shows by carrying out shipping operation round the clock on application server 9 any computing machines of processing back in LAN (Local Area Network); Real-time monitoring system 4 reads the shipping work plan and carries out data processing by message server 8 and produces the ship monitor formation; Operation evaluating system 2 reads sailing date catalogue, boats and ships basic data and production plan in the enterprising oceangoing ship job analysis of navigating of unit.
Operation evaluating system 2 can be analyzed, assess after the end of job the concrete operation effectiveness of harbour overall operation situation in a period of time or a certain boats and ships ground, for production management and performance appraisal provide foundation, it reads the actual job data on the AS400/DB2 of the COSMOS system server 6, is stored on the ORACLE server 7 in conjunction with boats and ships basic data generation shipping work line analysis, the shipping operating efficiency that the overall planning system provides according to certain form.The system that relieves 5 is by ORACLE server 7 reading operation line analysises, thereby shipping operating efficiency data are showed shipping emphasis operation round the clock on unit, managerial personnel can use operation evaluating system 2 on unit, by access to netwoks ORACLE server 7, thereby obtain the job analysis data that need.
3 of suitcase reservation systems provide the suitcase planning instrument of science, thereby reach the purpose of reasonable control suitcase flow and balance land transportation Work machine resource, do Dan Yuan and site plan on the unit (more than the internal memory 512M, more than the hard disk 20G, WINS 2000/XP, contain Oracal 9i client, the AS400 client, net.framework1.1, the ODP.net applied environment) the suitcase plan and the job placement of track bridge of using system making are stored on the ORACLE server 7, and the system that relieves 5 reads the suitcase plan by server and land transportation operation contrast is carried out in the job placement of track bridge and the track bridge is joined machine plan displaying; Real-time monitoring system 4 reads the suitcase plan and produces land transportation monitoring formation by application server processing, and the monitor staff obtains graphical monitor message by the initiation message server.
Real-time monitoring system 4 with site work situation and all kinds of job information with patterned way in real time, dynamically show assists in the scheduling control post in time to understand the problem that site work takes place, thereby makes judgements timely and effectively, command operation.Real-time monitoring system is that general data reads the source with the AS400/DB2 of the COSMOS system server 6 of scientific and technological information portion, reads the data processing of carrying out specified format after the actual job data by message server 8, stores on the ORACLE server 7 again.The land transportation plan that while message server 8 is stored on ORACLE server 7 in conjunction with suitcase reservation system 3, the operation effectiveness contrast that land transportation and shipping are carried out in the shipping work plan of overall planning system storage generates graphical monitoring formation, the managerial personnel of Central Control Room dispatcher and other office are by LAN (Local Area Network) initiation message server 8, message server 8 will be monitored formation and be transferred on the computing machine that the monitor staff uses (more than the internal memory 1G, more than the hard disk 20G, WINS 2000/XP, contain Oracal 9i client, the AS400 client, net.framework1.1, the ODP.net applied environment), thus realize that site work graphically monitors.
The system that relieves 5 by the typing of relieving, relieving loads and demonstration three parts of relieving are formed, the relieve personnel placement of writing down in the typing, Ji Gang plan, transport plan, ship information, Job events etc. is stored on the ORACLE server 7, relieving data based mechanical movement analysis, boat land transportation workload and the operating efficiency of carrying out of actual job that reads the AS400/DB2 server 6 of COSMOS system and provide by application server 9 is provided calculates, and the result is stored on the ORACLE server 7.The demonstration of relieving is then read on the ORACLE server 7 information such as the manufacturing schedule of storage, boat land transportation operation situation, mechanical movement situation and is made it Computer Processing platform graphicsization at a plurality of workstations, on unit, show the harbour condition of production round the clock to the user intuitively, help the managerial personnel in relevant post in time to understand the harbour condition of production, for circadian plan and work organization provide the data support down.
The whole series harbour resources of production configuration optimization system adopts multi-tier systematic structure; Based on the NET framework, adopt ADO.NET data platform technology, object-oriented development technology and assembly development technique, based on the IRP theory, adopt the design method of " prototype is approached " system that designs and develop software; Adopt the request broker technology to realize distributed data access service; Adopt messenger service mechanism to realize monitoring in real time, adopt graph processing technique to realize that job information intuitively shows.

Claims (1)

1, a kind of container wharf resources of production configuration optimization system, this system includes the scientific and technological information portion that is communicated with LAN (Local Area Network), it is characterized in that: this system also comprises overall planning optimization system, suitcase reservation system, operation evaluating system, real-time monitoring system and the system that relieves of mutual electrical connection, makes group of server and described overall planning optimization system, suitcase reservation system, operation evaluating system, the real-time monitoring system of scientific and technological information portion and relieves and carry out the optimization system that the signal transmission is formed between the system by described LAN (Local Area Network); The group of server of described scientific and technological information portion includes AS400/DB2 server, ORACLE server, application server and message server, the actual job data that described overall planning system, suitcase reservation system, operation evaluating system, real-time monitoring system and the system that relieves read from described AS400/DB2 server are respectively by on the ORACLE server that is stored in scientific and technological information portion after the system handles separately, by described LAN (Local Area Network) visit ORACLE server, realize that the information of this optimization system is inquired about in real time, real-time update again.
CNU2007200983516U 2007-12-06 2007-12-06 Container pier producing resource collocation optimizing system Expired - Lifetime CN201111139Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200983516U CN201111139Y (en) 2007-12-06 2007-12-06 Container pier producing resource collocation optimizing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200983516U CN201111139Y (en) 2007-12-06 2007-12-06 Container pier producing resource collocation optimizing system

Publications (1)

Publication Number Publication Date
CN201111139Y true CN201111139Y (en) 2008-09-03

Family

ID=39895677

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200983516U Expired - Lifetime CN201111139Y (en) 2007-12-06 2007-12-06 Container pier producing resource collocation optimizing system

Country Status (1)

Country Link
CN (1) CN201111139Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102750751A (en) * 2012-07-06 2012-10-24 武汉钢铁(集团)公司 Handover control system and method for railway crossing duty room of industrial and mining enterprises
CN103523675A (en) * 2013-10-29 2014-01-22 天津五洲国际集装箱码头有限公司 Rail-mounted gantry crane automatic yard operation control system and automatic loading and unloading method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102750751A (en) * 2012-07-06 2012-10-24 武汉钢铁(集团)公司 Handover control system and method for railway crossing duty room of industrial and mining enterprises
CN102750751B (en) * 2012-07-06 2015-02-25 武汉钢铁(集团)公司 Handover control system and method for railway crossing duty room of industrial and mining enterprises
CN103523675A (en) * 2013-10-29 2014-01-22 天津五洲国际集装箱码头有限公司 Rail-mounted gantry crane automatic yard operation control system and automatic loading and unloading method
CN103523675B (en) * 2013-10-29 2015-10-28 天津五洲国际集装箱码头有限公司 Track crane automatic yard operation control system and automated container handling method

Similar Documents

Publication Publication Date Title
Jaafari Concurrent construction and life cycle project management
Grefen et al. A reference architecture for workflow management systems
Vera-Baquero et al. Business process improvement by means of Big Data based Decision Support Systems: a case study on Call Centers
CN109377063A (en) A kind of method for scheduling task, device, equipment and storage medium
Sengupta et al. Collective problem solving using social compute units
Nurre et al. Online scheduling problems with flexible release dates: Applications to infrastructure restoration
Liao et al. Construction supply chain management: A systematic literature review and future development
CN201111139Y (en) Container pier producing resource collocation optimizing system
Bahrami et al. Enterprise architecture for business process simulation
Sharma et al. The Best performance practices in project management of SAP ERP accomplishment
CN106530110A (en) Big-data-based oceanographic engineering management system and method
Slavina et al. Preparation of the procedure of virtual organization development in construction
Ishizawa KEYSTONE PLAYERS IN COLLABORATIVE BUILDING INFORMATION MODELING--FORM OF CONTRIBUTION IN JAPANESE LARGE-SCALE PROJECTS.
Zhang Application of BIM Technology in Project Construction Schedule Management
Prudhomme et al. NEESgrid: A distributed virtual laboratory for advanced earthquake experimentation and simulation
Parra et al. Innovative architecture for information systems for a Mexican electricity utility
Maurer Working Group Report on Computer Support in Project Coordination
Imtiaz Architectural task allocation in distributed environment: A traceability perspective
Tan et al. The Management Mode of Marine Engineering Project Planning in Ship Enterprises
Kim Roddis Knowledge-based assistants in collaborative engineering
Tian et al. Research on grid management of public crisis resources
CN104678975A (en) Energy conservation and consumption reduction management method for oil and gas fields
Badiru et al. Recovering from a Crisis at Tinker Air Force Base
Hou et al. Information Management of Construction Project Based on Building Information Modeling Technology
Min et al. The inter-operating mechanism of the alliance-collaboration-oriented dynamic grid workflow

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20080903