CN201107359Y - Series resonance pressure test apparatus - Google Patents

Series resonance pressure test apparatus Download PDF

Info

Publication number
CN201107359Y
CN201107359Y CNU2007200294250U CN200720029425U CN201107359Y CN 201107359 Y CN201107359 Y CN 201107359Y CN U2007200294250 U CNU2007200294250 U CN U2007200294250U CN 200720029425 U CN200720029425 U CN 200720029425U CN 201107359 Y CN201107359 Y CN 201107359Y
Authority
CN
China
Prior art keywords
temperature controller
cpu
lcds
temperature
series resonance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200294250U
Other languages
Chinese (zh)
Inventor
李永宁
杨琦欣
孙英涛
周迎新
井冬皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
JINAN POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINAN POWER SUPPLY Co filed Critical JINAN POWER SUPPLY Co
Priority to CNU2007200294250U priority Critical patent/CN201107359Y/en
Application granted granted Critical
Publication of CN201107359Y publication Critical patent/CN201107359Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an acceptor resonance compression testing unit, which is mainly applied to the primary device AC compression test of a 110kv crosslinked polyethylene power cable and combination electricity. The testing unit comprises a shell body, the bottom of which is provided with a CPU and a control cabinet of electrical elements, the top part of the shell body is provided with an operation panel and two LCDs. The testing device is characterized in that a refrigerating unit and a heating device are arranged in the control cabinet and are composed of a refrigerator and a refrigeration temperature controller, the refrigerator is arranged near the LCDS and is connected with the CPU through the refrigeration temperature controller. The heating device comprises a heater, a forced convection fan, and a heating temperature controller, the heater is connected with the forced convection fan in series and then is electrically connected with the CPU through the heating temperature controller. Under the environmental temperatures of overheating and underheating, the testing unit can quickly start and work normally, and the LCDs have no screen mass and blank screen, thereby the working time is saved, and the test efficiency of the acceptor resonance compression testing unit is improved.

Description

A kind of series resonance Withstand test device
Technical field
The utility model relates to a kind of power test device, specifically is the series resonance Withstand test device that is used for primary equipment AC voltage withstand test such as 110kv cross-inked polyethylene power cable, combined electric.
Background technology
Along with the electric network reconstruction input increases year by year, transformer station's new structure Design Mode is occupied an leading position, the new structure pattern---be that cable passes in and out line+GIS, COMPASS, PASS unit equipment.The establishment of this pattern has also just brought the frequent of GIS combined electrical apparatus and the commissioning test of inlet wire cross-inked polyethylene power cable.Use complete series resonance Withstand test device to carry out cross-inked polyethylene power cable, combined electric primary equipment AC voltage withstand test such as (GIS, COMPASS, PASS).This test unit is convenient to transportation, on-the-spot easy to use, for positive role has been played in the safe operation that guarantees primary equipment.
But also there is following problem in this test unit, because of operation outside master station is exposed to, so equate with the environment temperature at scene.It is also just unavoidable situation subzero and temperature more than 40 degrees centigrade to occur.Its LCD display is common single colour liquid crystal display, and owing to himself intrinsic characteristic, it is too high or too low for temperature in addition to exceed operating temperature range, all can cause the phenomenon of improper demonstration to produce.Temperature is crossed low display screen does not have demonstration, the too high display screen blank screen of temperature.And electronic device temperature nargin is little, and the oneself requirement operating temperature range is little, and too high or too low for temperature all can and the measurement calculating produces error, even function is stagnated.Electronic component also can be subjected to larger interference when humidity was too high.
Because when the problems referred to above caused system start-up, the stand-by period also prolonged, thereby causes the commissioning test time lengthening, causes equipment to put into operation thereupon on schedule.
The utility model content
In order to overcome the shortcoming that above-mentioned prior art exists, the purpose of this utility model is to provide a kind of series resonance Withstand test device, it can be under the mal-condition of low temperature or high temperature operate as normal.
In order to address the above problem, the utility model is by the following technical solutions: a kind of series resonance Withstand test device, comprise housing, housing bottom is the switch board that CPU and electrical equipment are installed, case top is provided with guidance panel and two LCD LCDs, it is characterized in that: be provided with refrigerating plant near LCD LCDs place, described refrigerating plant connects CPU by temperature controller, near on the housing of LCD LCDs heating arrangement is installed, described heating arrangement comprises well heater, after connecting with the forced convertion fan, forced convertion fan, well heater be electrically connected with CPU by temperature controller.
As further technical scheme of the present utility model: described refrigerating plant is two semiconductor coolers, is separately positioned on the back side of two LCD LCDs.
Technical scheme further: described semiconductor cooler is provided with heat radiator.
The beneficial effects of the utility model are: under too high, the low excessively environment temperature of temperature, obviously shorten its start-up time; Eliminated the phenomenon of LCD LCDs flower screen or blank screen; Save the working time, reduced labour intensity, reduced unnecessary link, avoided reciprocal sex work, improved the test efficiency of series resonance Withstand test device.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Accompanying drawing is a schematic block circuit diagram of the present utility model.
Embodiment
As shown in drawings, this series resonance Withstand test device comprises housing, and housing bottom is the switch board that CPU and electrical equipment are installed, and case top is provided with guidance panel and two LCD LCDs.
Be provided with refrigerating plant near LCD LCDs place.Described refrigerating plant is two semiconductor coolers, is separately positioned on the back side of two LCD LCDs.Two semiconductor refrigerators connect CPU by temperature controller.
Near on the housing of LCD LCDs heating arrangement is installed, described heating arrangement comprises well heater, forced convertion fan, is electrically connected with CPU by temperature controller after well heater is connected with the forced convertion fan.Well heater is not installed in is close to LCD LCD place, when preventing that its temperature is too high electronic component is caused damage.
Can set a temperature range by temperature control, the minimum temperature of this temperature range is the heating starting temperature, and maximum temperature is the cooling activation temperature.
Too high when environment temperature, when surpassing the maximum temperature of said temperature scope, start semiconductor cooler by temperature controller, thereby can reduce working temperature, guarantee that system starts fast and LCD normally shows.Semiconductor cooler uses lower operating voltage, can satisfy the job requirement of cooling electronic device fully, thereby guarantees operate as normal.
When environment temperature is crossed low or humidity when excessive, when being lower than the minimum temperature of said temperature scope, start heating arrangement by temperature controller, the fan of forced convertion simultaneously also starts, make the zonule around the LCD LCDs form forced convertion, improve the temperature of subenvironment around it and reduce humidity, guarantee that system starts fast, operate as normal.Temperature sensor in the temperature controller comes the sensing device working temperature, after arriving design temperature, stops heated condition, effectively guaranteed constant environment temperature, prevent that heating arrangement from heating simply, cause device to enter the hot operation state, make it produce the demonstration fault once more.
As other embodiments: in order to guarantee refrigeration and convenient heat radiation, finned as required on the semiconductor cooler.
Refrigerating plant also can adopt compressor to add the mode of condenser, though can play refrigeration preferably, cost is higher, and system installs complicated, is not suitable for equipment actuality.So preferred semiconductor refrigeration device.

Claims (3)

1, a kind of series resonance Withstand test device, comprise housing, housing bottom is the switch board that CPU and electrical equipment are installed, case top is provided with guidance panel and two LCD LCDs, it is characterized in that: be provided with refrigerating plant near LCD LCDs place, described refrigerating plant connects CPU by temperature controller, near on the housing of LCD LCDs heating arrangement is installed, described heating arrangement comprises well heater, forced convertion fan, is electrically connected with CPU by temperature controller after well heater is connected with the forced convertion fan.
2, a kind of series resonance Withstand test device according to claim 1, it is characterized in that: described refrigerating plant is two semiconductor coolers, is separately positioned on the back side of two LCD LCDs.
3, a kind of series resonance Withstand test device according to claim 2, it is characterized in that: described semiconductor cooler is provided with heat radiator.
CNU2007200294250U 2007-10-24 2007-10-24 Series resonance pressure test apparatus Expired - Fee Related CN201107359Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200294250U CN201107359Y (en) 2007-10-24 2007-10-24 Series resonance pressure test apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200294250U CN201107359Y (en) 2007-10-24 2007-10-24 Series resonance pressure test apparatus

Publications (1)

Publication Number Publication Date
CN201107359Y true CN201107359Y (en) 2008-08-27

Family

ID=39959168

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200294250U Expired - Fee Related CN201107359Y (en) 2007-10-24 2007-10-24 Series resonance pressure test apparatus

Country Status (1)

Country Link
CN (1) CN201107359Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011038545A1 (en) * 2009-09-29 2011-04-07 Shenzhen New Super-Bright Lcd Display Co. Ltd. Lcd apparatus
CN107748318A (en) * 2017-10-25 2018-03-02 广东天圣高科股份有限公司 A kind of three-phase distribution inducting-voltage proof tester
CN113848436A (en) * 2021-09-06 2021-12-28 四川威鹏电缆制造股份有限公司 Withstand voltage testing device for preparing hybrid twisted pair cable

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011038545A1 (en) * 2009-09-29 2011-04-07 Shenzhen New Super-Bright Lcd Display Co. Ltd. Lcd apparatus
CN107748318A (en) * 2017-10-25 2018-03-02 广东天圣高科股份有限公司 A kind of three-phase distribution inducting-voltage proof tester
CN113848436A (en) * 2021-09-06 2021-12-28 四川威鹏电缆制造股份有限公司 Withstand voltage testing device for preparing hybrid twisted pair cable
CN113848436B (en) * 2021-09-06 2024-02-09 四川威鹏电缆制造股份有限公司 Withstand voltage testing device for preparing mixed twisted pair cable

Similar Documents

Publication Publication Date Title
CN201107359Y (en) Series resonance pressure test apparatus
CN201322465Y (en) Small controller cabinet air-conditioner
CN203367803U (en) Distribution box
CN108413475B (en) Heating system based on gas boiler and air source heat pump and control method
CN109099585B (en) Air energy water heater temperature difference power generation control system, water heater and control method thereof
CN203375605U (en) Frostless semiconductor dehumidifier
CN205106872U (en) Warm and humid locker of automatic control
CN204440305U (en) A kind of computer heat radiation cooling system
CN208224868U (en) A kind of charging gun linear system system with temperature incubation function
CN203367791U (en) Ring network cabinet
KR101371278B1 (en) Air conditioner of smart rack and air conditioning method thereof
CN104092128A (en) Cavity-divided thermal-insulation-type power transformation cabinet
CN205384523U (en) Control by temperature change circuit and mutual -inductor secondary terminal board
CN209517046U (en) A kind of solar photovoltaic controller
CN207936590U (en) The refrigerator that high refrigerating efficiency more economizes on electricity
CN102622014A (en) Temperature and humidity controller
CN209708359U (en) A kind of automatically controlled experience system of refrigeration equipment
CN208623473U (en) A kind of hydraulic power unit temperature-adjusting device
CN206517654U (en) One kind is used for dielectric barrier discharge complete sets of Techniques supply unit
CN205051205U (en) Novel environmental protection constant temperature low -voltage switchgear
CN210070343U (en) Solar power generation integral refrigeration house
CN206207626U (en) A kind of geomantic omen air-conditioning system
CN216569547U (en) Cold and hot drink machine of adjustable air humiture
CN216924490U (en) Air source utilization integrated unit capable of providing water with two temperatures and heating system
CN203811562U (en) Icing testing equipment for electromagnetic switch contact of automobile starter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Shandong Aipu Electrical Equipment Co., Ltd.

Assignor: Jinan Power Supply Co., Ltd. of Shandong Electric Power Corporation

Contract fulfillment period: 2008.9.25 to 2013.9.24

Contract record no.: 2008370000027

Denomination of utility model: Series resonance withstanding voltage tester

Granted publication date: 20080827

License type: Exclusive license

Record date: 20081020

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2008.9.25 TO 2013.9.24; CHANGE OF CONTRACT

Name of requester: SHANDONG AIPU ELECTRIC APPLIANCE EQUIPMENT CO., LT

Effective date: 20081020

ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121224

Owner name: JINAN POWER SUPPLY COMPANY OF SHANDONG ELECTRIC PO

Free format text: FORMER OWNER: JINAN POWER SUPPLY COMPANY

Effective date: 20121224

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121224

Address after: 250012 Shandong Province, Lixia District of Ji'nan City Luoyuan Street No. 238

Patentee after: Jinan Power Supply Co., Ltd. of Shandong Electric Power Corporation

Patentee after: State Grid Corporation of China

Address before: 250012 Shandong Province, Lixia District of Ji'nan City Luoyuan Street No. 238

Patentee before: Jinan Power Supply Company

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080827

Termination date: 20151024

EXPY Termination of patent right or utility model