CN201106251Y - Reinforcing steel protective cover - Google Patents

Reinforcing steel protective cover Download PDF

Info

Publication number
CN201106251Y
CN201106251Y CNU200720184654XU CN200720184654U CN201106251Y CN 201106251 Y CN201106251 Y CN 201106251Y CN U200720184654X U CNU200720184654X U CN U200720184654XU CN 200720184654 U CN200720184654 U CN 200720184654U CN 201106251 Y CN201106251 Y CN 201106251Y
Authority
CN
China
Prior art keywords
protective sleeve
reinforcing bar
steel bar
bar protective
sheathed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200720184654XU
Other languages
Chinese (zh)
Inventor
刘雪红
胡翔宇
姚晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CNU200720184654XU priority Critical patent/CN201106251Y/en
Application granted granted Critical
Publication of CN201106251Y publication Critical patent/CN201106251Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model aims at providing a steel bar protective sleeve which can be installed on a steel bar which needs to be protected in a safe, convenient, easy and fast way. In order to achieve the purpose, the steel bar protective sleeve provided by the utility model consists of a flexible plastic pipe which is provided with an opening running through the whole pipe along the longitudinal direction. By adopting the technical proposal that the plastic pipe is provided with the opening running through the whole pipe along the longitudinal direction, the steel bar protective sleeve needs not to be sheathed on the steel bar from the top end of the bar according to a former installation method and can be sheathed on the steel bar from the side face of the bar instead, which is obviously more convenient and safer. In addition, the steel bar protective sleeve can be sheathed on the steel bar, regardless of the uneven size of the steel bar, thereby improving the installation efficiency.

Description

A kind of reinforcing bar protective sleeve
Technical field
The utility model relates to a kind of protective sleeve, relates in particular to a kind of reinforcing bar protective sleeve.
Background technology
What present building construction was generally used is reinforced concrete structure.In the vertical structure work progress of building, when concreting finished, concrete can pollute upheld the vertical reinforcement that exposes outside, before further constructing, needed earlier vertical reinforcement to be cleaned out ability, otherwise can influence the quality of construction.If do not protect and, need the number of steel bars of cleaning many, trouble operates.The reinforcing bar that is not protected is simultaneously also caused distortion by collision easily, is not easy after the distortion to recover, and influences final construction quality.For this reason, each building unit does not generally add safeguard measure in work progress.If employing safeguard measure, usual method are to use pvc pipe to be enclosed within on the reinforcing bar, reinforcing bar is protected.But the pvc pipe material is harder, and is damaged easily.Because vertical reinforcement is long usually, pvc pipe is nested on the reinforcing bar very inconvenient from top to bottom, takes off also cumbersome when finishing using.Sometimes the reinforcing bar thickness is inhomogeneous, after straight tube is inserted in into, may have overlapped half and block, and falls into a dilemma, and has incured loss through delay the speed of construction.And after construction finishes, enter owing to have cement paste etc. in the pipe, being difficult to take off pvc pipe is complete, sleeve pipe can't be reused, and has increased the cost of constructing.
The utility model content
The purpose of this utility model provides a kind of reinforcing bar protective sleeve, easy for installation, safely, be easy to install.Can promptly be installed on the reinforcing bar that needs protection, reinforcing bar be played the effect of keeping a public place clean, protecting.
For reaching described purpose, this uses novel a kind of reinforcing bar protective sleeve, is made up of flexible plastic tube, and described plastic pipe vertically is provided with an opening that runs through full pipe.
Preferably, this uses the opening of novel a kind of reinforcing bar protective sleeve to be the S type.Seal was good after this shaped aperture made the reinforcing bar protective sleeve install.Simultaneously such structure also makes reinforcing bar protective sleeve difficult drop-off.
Preferably, this uses the described opening of novel a kind of reinforcing bar protective sleeve both sides tube wall groove shape staggered.Such structure makes that the opening combination of reinforcing bar protective sleeve is tightr, and the reinforcing bar protective sleeve is not easy to come off.
Preferably, this uses the intersection, two ends of novel described opening of a kind of reinforcing bar protective sleeve and plastic pipe to be provided with recess.Such structure makes reinforcing bar protective sleeve opening open, close more convenient.
Owing to adopted described technical scheme, described plastic pipe vertically to be provided with an opening that runs through full pipe, the reinforcing bar protective sleeve needn't pack into according to the top of original mounting means from reinforcing bar, packs into and change into from the side of reinforcing bar.Such mounting means is obviously more convenient, safer.Also needn't worry simultaneously to have improved installation effectiveness because reinforcing bar thickness inequality causes the problem that can't pack into.Whole reinforcing bar protective sleeve also can make reinforcing bar avoid by the evil of cement pollution.
Description of drawings
The utility model is described in further detail below in conjunction with accompanying drawing:
Fig. 1 is the schematic diagram of a kind of reinforcing bar protective sleeve of the utility model.
Fig. 2 is the schematic diagram of a kind of reinforcing bar protective sleeve one end of the utility model.
The specific embodiment
As shown in Figure 1 and Figure 2, a kind of reinforcing bar protective sleeve is made up of flexible plastic tube 1, and described plastic pipe 1 vertically is provided with an opening 2 that runs through full pipe.In order to make reinforcing bar protective sleeve seal good, described opening 2 is the S type.Described opening 2 both sides tube wall groove shapes are staggered.In order to make the folding of reinforcing bar protective sleeve more convenient, described opening 2 is provided with recess 3 with the intersection, two ends of plastic pipe 1.
On the building site, the reinforcing bar protective sleeve can be installed after installing reinforcing bar.Can set about from the recess 3 at reinforcing bar protective sleeve two ends during use, opening 2 is opened.Whole like this reinforcing bar protective sleeve just can be inserted in from the side of reinforcing bar, and relies on the tension force of himself to close up.Installation process is convenient and swift, and is safer.Because opening 2 is the S type.It is good to install back reinforcing bar protective sleeve seal.Under some airtight demanding situations, we adopt the staggered structure of both sides tube wall groove shape, further enhanced leaktightness.Even the both sides tube wall does not just partly contact yet in the time of reinforcing bar thickness inequality, still can guarantee the normal defencive function of reinforcing bar protective sleeve.
During construction, put cleaning and safety that the reinforcing bar protective sleeve can guarantee reinforcing bar; After construction finished, the reinforcing bar protective sleeve can take off very easily, even be stained with a little cement, also has no relations.Reinforcing bar protective sleeve after taking off is easy to clean, and is promptly reusable, economical with materials.

Claims (4)

1, a kind of reinforcing bar protective sleeve is made up of flexible plastic tube (1), it is characterized in that: described plastic pipe (1) vertically is provided with an opening (2) that runs through full pipe.
2, reinforcing bar protective sleeve as claimed in claim 1 is characterized in that: described opening (2) is the S type.
3, reinforcing bar protective sleeve as claimed in claim 1 or 2 is characterized in that: described opening (2) both sides tube wall groove shape is staggered.
4, reinforcing bar protective sleeve as claimed in claim 1 or 2 is characterized in that: described opening (2) is provided with recess (3) with the intersection, two ends of plastic pipe (1).
CNU200720184654XU 2007-10-17 2007-10-17 Reinforcing steel protective cover Expired - Fee Related CN201106251Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200720184654XU CN201106251Y (en) 2007-10-17 2007-10-17 Reinforcing steel protective cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200720184654XU CN201106251Y (en) 2007-10-17 2007-10-17 Reinforcing steel protective cover

Publications (1)

Publication Number Publication Date
CN201106251Y true CN201106251Y (en) 2008-08-27

Family

ID=39958050

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200720184654XU Expired - Fee Related CN201106251Y (en) 2007-10-17 2007-10-17 Reinforcing steel protective cover

Country Status (1)

Country Link
CN (1) CN201106251Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2464220A (en) * 2009-12-11 2010-04-14 Martin Ansell Safety cover for concrete reinforcement bars
CN102997031A (en) * 2012-12-13 2013-03-27 苏州和林精密科技有限公司 Bayonet structure for preventing products from interlocking
CN103266612A (en) * 2013-06-06 2013-08-28 大连大金马基础建设有限公司 Pile splicing anchor bar protecting frame
CN107201749A (en) * 2016-03-17 2017-09-26 黑龙江省送变电工程公司 Assembling type base mounting and adjusting device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2464220A (en) * 2009-12-11 2010-04-14 Martin Ansell Safety cover for concrete reinforcement bars
GB2464220B (en) * 2009-12-11 2010-08-25 Martin Ansell An arrangement including concrete reinforcement bars and a safety device
WO2011070374A1 (en) * 2009-12-11 2011-06-16 Martin Ansell Safety device and arrangement including same
CN102997031A (en) * 2012-12-13 2013-03-27 苏州和林精密科技有限公司 Bayonet structure for preventing products from interlocking
CN103266612A (en) * 2013-06-06 2013-08-28 大连大金马基础建设有限公司 Pile splicing anchor bar protecting frame
CN107201749A (en) * 2016-03-17 2017-09-26 黑龙江省送变电工程公司 Assembling type base mounting and adjusting device

Similar Documents

Publication Publication Date Title
CN201106251Y (en) Reinforcing steel protective cover
CN203856202U (en) Simple pullable sizing device of reserved holes
CN203669119U (en) Novel building deformation joint water stop strip fixing device
CN211201162U (en) Post-cast strip cast-in-place concrete intercepting device
CN206706844U (en) A kind of alter-pouring strips mould plate installs construction
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN110644538A (en) Basement side wall extra front and back pouring belt periphery protection structure
CN205840507U (en) Detachable safety enclosing
CN206477326U (en) A kind of combined type shaped steel building enclosure
CN210421182U (en) Basement roof post-cast strip seals structure in advance
CN205063370U (en) Post -cast strip construction period protection device
CN210049234U (en) Static pressure square pile splicing and reinforcing structure
CN207194032U (en) A kind of post-cast strip cleans aperture apparatus
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN104453235A (en) Convertor station firewall construction technology
CN210975900U (en) Basement side wall extra front and back pouring belt periphery protection structure
CN209686459U (en) Exterior wall advanced water-stopping band plugging structure
CN203594167U (en) Protection structure for outer wall of concrete pre-buried steel pipe
CN210134411U (en) Steel-pipe pile diversion guiding device that divides water
CN107905351B (en) Outer wall structure of ultra-long underground garage and construction method thereof
CN203755315U (en) Pipe jacking working well opening reinforcing device
CN111894294A (en) Protection architecture in basement outer wall post-cast strip
CN220868594U (en) Rust-proof device for postpone wall column vertical steel bar
CN207469752U (en) A kind of venthole non-dismantling formwork
CN218970076U (en) Basement outer wall post-cast strip protector of quick construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080827

Termination date: 20111017