CN201099820Y - Cross frog heel flexible fastening system - Google Patents

Cross frog heel flexible fastening system Download PDF

Info

Publication number
CN201099820Y
CN201099820Y CNU2007201921911U CN200720192191U CN201099820Y CN 201099820 Y CN201099820 Y CN 201099820Y CN U2007201921911 U CNU2007201921911 U CN U2007201921911U CN 200720192191 U CN200720192191 U CN 200720192191U CN 201099820 Y CN201099820 Y CN 201099820Y
Authority
CN
China
Prior art keywords
rail
frog
rails
point rails
heel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201921911U
Other languages
Chinese (zh)
Inventor
王全生
杨西
王阿利
李文博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Baoji Bridge Corp
Original Assignee
China Railway Baoji Bridge Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Baoji Bridge Corp filed Critical China Railway Baoji Bridge Corp
Priority to CNU2007201921911U priority Critical patent/CN201099820Y/en
Application granted granted Critical
Publication of CN201099820Y publication Critical patent/CN201099820Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Railway Tracks (AREA)

Abstract

The utility model relates to an flexible fixing system for heel end of rail road frog, which comprises fillers, high strength friction grip bolts, wing rails, long point rails, short point rails and grog heel switch rail, rail bodies of the wing rails, the long point rails, the short point rails and the grog heel switch rail are provided with holes, fillers are respectively arranged between the wing rails and the long point rails, the long point rails and the short point rails, the short point rails and the grog heel switch rail, and flexible pins and high strength friction grip bolts are used to connect accurately. The flexible fixing system for heel end of rail road frog has the advantages that by flexible pins and preparing weld fillers, the frog heel fixing system not only effectively homogenizes longitudinal temperature force from intervals, guarantees position of each element at heel end of the frog to be fixed, and limits excessive extension of long point rails and short point rails, but also ensures stability of geometric pattern of the railroad switch, and guarantees high smoothness of railroad switches.

Description

Frog foot end elastic fixation system
Technical field
The utility model relates to a kind of railroad frog heel end elastic fixation system, fastening devices, belongs to railroad frog heel end fastening devices and makes the field.
Background technology
1, for resisting the disturbance of interval TEMPERATURE FORCE to the track switch physical dimension, guarantee the geometry morpheme of track switch, solid and reliable track switch heel end of frog fixed system is essential.The heel end of frog of existing track switch fixedly be by high-strength bolt and interval iron will long heart rail, short heart rail, fork be connected with wing rail with tongue, sees accompanying drawing 6.Its weak point: this kind structure is because there is the deviation on making in each component, and the high-strength bolt discontinuity causes that the diseases such as local distortion of the creeping of heart rail, track switch appear in the existing line railway frog because of the effect of thermal stresses.
2,, therefore adopt long wing rail mostly, to transmit the longitudinal force of gapless track because high-speed switch is used for trans-section seamless railway.The effect of heel end of frog structure is the TEMPERATURE FORCE that the opposing circuit passes over, and it is passed to stock rail by lead curve.China popularizes trans-section seamless railway in an all-round way from acclerating road switch, and the rail wing heel end adopts 3~4 block gap iron to be connected with heart rail, and bolt adopts high-strength bolt.According to use experience for many years, wing rail heel end structure is insecure, will cause the heart rail amount of creeping excessive, makes track switch and electric affair equipment produce jam easily, influences the normal use of track switch.At present, the methods that wing rail, heart rail and interval iron are gluedd joint that adopt are strengthened the heel end of frog structure more.Its weak point is: this kind structure is because there is the deviation on making in each component, and the high-strength bolt discontinuity causes that the diseases such as local distortion of the creeping of heart rail, track switch appear in the existing line railway frog because of the effect of thermal stresses.
Germany adopts switch base plate in the heel end of frog bottom, adopts the interval iron of growing up between heart rail and heart rail, wing rail and heart rail, connects with switch base plate by bolt, also is used cross bolts simultaneously and connects; Japan adopts potassium steel block cast frame type wing rail, the fixing fixing mode of group's rail that adopts of heel end of frog, and heel end stability is all relatively good, but the manufacturing process relative complex.
Summary of the invention
Purpose of design: avoid the weak point in the background technology, design a kind of fixed system of heel end of frog, can bear of the influence of the TEMPERATURE FORCE of track section, keep the geometry morpheme of railway frog to track structure.
Design scheme: in order to realize above-mentioned purpose of design.The utility model is on structure design, adopt the preparation interval iron, high-strength bolt, resilient key will long heart rail, short heart rail, fork carries out precision with tongue with wing rail and is connected, it is major technique feature of the present utility model, and the key that realizes the utility model major technique feature is: 1, resilient key vertically will have a breach, to guarantee when " interference " cooperates assembling, resilient key has certain " compression " amount, can close installation, and satisfy following condition: the one, the resilient key material adopts manganese steel or silico-manganese steel, make it have higher anti-shear ability, shear strength is not less than 698Mpa; The 2nd, resilient key outside diameter d 1 is a bit larger tham the installation aperture on the rail, when mounted, resilient key is squeezed in the installing hole of rail by special tool, guarantees the compactness of installing.The purpose of doing like this is: during TEMPERATURE FORCE that length heart rail is subjected to transmitting between switch area, pass through high-strength bolt, TEMPERATURE FORCE at first is delivered on the resilient key in the length heart rail hole, secondly be delivered to equably on the welding clamping plate by resilient key, be delivered on the resilient key in the wing rail hole by the welding clamping plate again, be delivered on the wing rail equably by the resilient key in the wing rail hole at last.2, preparation interval iron, welding clamping plate in order to obtain the concentricity of clamping plate and rail installing hole, are guaranteed resilient key closely cooperating when mounted when drilling, require the rail of every block welding clamping plate and homonymy to hole simultaneously, the aperture deviation is 0~+ 0.25mm; Welding clamping plate in both sides are by behind resilient key, high-strength bolt and the corresponding rail installation in position, prepare weld interval iron by preparation welding gusset, the technology of joining weldering.The precision-fit of weld interval iron and high-strength bolt is to guarantee the stressed even of each high-strength bolt.Its technical scheme: frog foot end elastic fixation system, it comprises that interval iron, high-strength bolt, wing rail, long heart rail, short heart rail and fork are with tongue, wing rail, long heart rail, short heart rail and fork have the hole with the rail body of tongue, between wing rail and long heart rail, between long heart rail and short heart rail, weak point heart rail is equipped with interval iron respectively between tongue and adopts resilient key respectively and the high-strength bolt precision is connected with pitching to follow.
The utility model is compared with background technology, because track switch longitudinal temperature power is the main cause of track switch geometric form phase perturbation, and the utility model heel end of frog fixed system is by resilient key and preparation weld interval iron, not only effectively homogenising from the longitudinal temperature power in interval, guarantee that each component locations of heel end of frog fixes, limit the excessive flexible of length heart rail, and guaranteed the stable of how much morphemes of track switch, guaranteed the high ride of track switch.
Description of drawings
Fig. 1 is a frog foot end elastic fixation system structure schematic top plan view.
Fig. 2 is a frog foot end elastic fixation system sectional structure schematic diagram.
Fig. 3 is the main TV structure schematic diagram of resilient key structure.
Fig. 4 is the side-looking structural representation of Fig. 3.
Fig. 5 is the structural representation of preparation interval iron.
Fig. 6 is the structural representation of background technology.
The specific embodiment
Embodiment 1: with reference to accompanying drawing 1~5.Frog foot end elastic fixation system, it comprises that interval iron 2, high-strength bolt 3, wing rail 4, long heart rail 5, short heart rail 6 and fork are with tongue 7, wing rail 4, long heart rail 5, short heart rail 6 and fork have the hole with the rail body of tongue 7, and wing rail 4 respectively is equipped with interval iron 2 with fork with 7 of tongues with 6 on short heart rail, short heart rail 6 and adopts resilient key 1 and 3 accurate connections of high-strength bolt respectively with 5 on long heart rail, long heart rail 5.Described interval iron 2 is made of welding clamping plate 8 and welding gusset 9, and welding clamping plate 8 are dislocatedly distributed, and welding gusset 9 is welded between the upper and lower plate of welding clamping plate 8, has installing hole 10 on the welding clamping plate 8.Described resilient key 1 vertically has a breach 11, and described resilient key 1 adopts manganese steel or silico-manganese steel.Its preparation method: it comprises spring catch and welding clamping plate, and milling round steel pipe---〉brachymemma---〉machine-shaping---〉the processing longitudinal opening groove---〉that is made as of described spring catch quenches---〉tempering; The manufacturing of resilient key is mainly passed through: milling round steel pipe blank, clip to design size, machine moulding, open technological processes such as cannelure, heat treatment and realize that existing technical maturity is realized easily.The processing welding clamping plate---〉that are made as of described weld interval iron are joined equipped heel end of frog the component---〉preparation of brill installing hole---〉welding gusset---〉spot welding gusset, welding clamping plate with corresponding rail---〉welding.Weld interval iron is after the machine of welding clamping plate is finished, and joins the brill installing hole on corresponding rail, and all the other component of heel end of frog are installed, and prepares gusset, welding gusset then, thereby forms the heel end of frog fixed frame, and existing technical maturity is realized easily.Its fixing means: the rail of every block welding clamping plate and homonymy is holed simultaneously, the aperture deviation is 0~+ 0.25mm, after both sides welding clamping plate pass through resilient key, high-strength bolt and corresponding rail installation in position, by preparation welding gusset, preparation weld interval iron, weld interval iron.
What need understand is: though the foregoing description is to the utility model detailed explanation of contrasting; but these explanations; just to simple declaration of the present utility model; rather than to restriction of the present utility model; any innovation and creation that do not exceed in the utility model connotation all fall into protection domain of the present utility model.

Claims (5)

1, a kind of frog foot end elastic fixation system, it comprises that interval iron, high-strength bolt, wing rail, long heart rail, short heart rail and fork are with tongue, it is characterized in that: wing rail, long heart rail, short heart rail and fork have the hole with the rail body of tongue, between wing rail and long heart rail, between long heart rail and short heart rail, weak point heart rail is equipped with interval iron respectively between tongue and adopts resilient key respectively and the high-strength bolt precision is connected with pitching to follow.
2, frog foot end elastic fixation system according to claim 1 is characterized in that: described interval iron is made of welding clamping plate and welding gusset, and the welding clamping plate are dislocatedly distributed, and the welding gusset is welded between the upper and lower plate of welding clamping plate.
3, frog foot end elastic fixation system according to claim 1 is characterized in that: have installing hole on the described welding clamping plate 8.
4, frog foot end elastic fixation system according to claim 1 is characterized in that: described resilient key vertically has a breach.
5, frog foot end elastic fixation system according to claim 1 is characterized in that: described resilient key adopts manganese steel or silico-manganese steel.
CNU2007201921911U 2007-10-25 2007-10-25 Cross frog heel flexible fastening system Expired - Fee Related CN201099820Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201921911U CN201099820Y (en) 2007-10-25 2007-10-25 Cross frog heel flexible fastening system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201921911U CN201099820Y (en) 2007-10-25 2007-10-25 Cross frog heel flexible fastening system

Publications (1)

Publication Number Publication Date
CN201099820Y true CN201099820Y (en) 2008-08-13

Family

ID=39936351

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201921911U Expired - Fee Related CN201099820Y (en) 2007-10-25 2007-10-25 Cross frog heel flexible fastening system

Country Status (1)

Country Link
CN (1) CN201099820Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101381978B (en) * 2007-10-25 2011-09-21 中铁宝桥股份有限公司 Frog foot end elastic fixation system and fixation method
CN104109991A (en) * 2014-06-23 2014-10-22 杭州慧景科技有限公司 Turnout rail creeping amount monitoring device
CN104727191A (en) * 2015-03-30 2015-06-24 北车(北京)轨道装备有限公司 Three-gauge mixed gauge turnout
CN109518546A (en) * 2018-12-19 2019-03-26 中国铁建重工集团有限公司 A kind of split type interval iron for railway switch
CN110761128A (en) * 2019-11-05 2020-02-07 中国铁建重工集团股份有限公司道岔分公司 Turnout mechanism and track system
CN114457631A (en) * 2017-11-21 2022-05-10 盖茨纳工业原料控股有限责任公司 Switch

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101381978B (en) * 2007-10-25 2011-09-21 中铁宝桥股份有限公司 Frog foot end elastic fixation system and fixation method
CN104109991A (en) * 2014-06-23 2014-10-22 杭州慧景科技有限公司 Turnout rail creeping amount monitoring device
CN104109991B (en) * 2014-06-23 2016-01-20 杭州慧景科技有限公司 A kind of railroad turnout steel rail amount of creeping monitoring device
CN104727191A (en) * 2015-03-30 2015-06-24 北车(北京)轨道装备有限公司 Three-gauge mixed gauge turnout
CN114457631A (en) * 2017-11-21 2022-05-10 盖茨纳工业原料控股有限责任公司 Switch
CN114457631B (en) * 2017-11-21 2024-05-28 盖茨纳工业原料控股有限责任公司 Switch
CN109518546A (en) * 2018-12-19 2019-03-26 中国铁建重工集团有限公司 A kind of split type interval iron for railway switch
CN110761128A (en) * 2019-11-05 2020-02-07 中国铁建重工集团股份有限公司道岔分公司 Turnout mechanism and track system

Similar Documents

Publication Publication Date Title
CN201099820Y (en) Cross frog heel flexible fastening system
CN106964901B (en) Complex welding method, draw beam and the rail vehicle with the draw beam of draw beam
CN109930430B (en) Low-noise small-number frog using single movable point rail
CN101381978B (en) Frog foot end elastic fixation system and fixation method
CN208183449U (en) Suspension type monorail precast concrete rail beam
CN107931826A (en) A kind of electroslag welding with tube electrode suitable for rail connects die device
CN204803690U (en) Pairing gold solid forging railway frog
CN207775625U (en) A kind of embedded tracks plate
CN201172779Y (en) Novel welding wing rail for railway combined frog
CN207227871U (en) Fusion cast frog
CN1839231B (en) Track for a rail-based vehicle, production method and functional-plane support
CN203821177U (en) Steel rail connection device
CN201671024U (en) Damping railroad track
CN212865447U (en) Railway switch district circuit reinforced structure
CN201172778Y (en) Alloy steel-reinforced welding wing rail for railway combined frog
CN206308560U (en) External locking device
CN208545623U (en) Horizontal connection assembly type shear hinge
CN204343109U (en) Prestressed concrete longitudinal sleeper
CN207290433U (en) A kind of railway switch tie punching block mould
CN202208302U (en) Insulation indicating rod for railway turnout
CN201713759U (en) Expansion device for railroad
CN201801788U (en) Railway shock-absorbing steel rail
CN204738188U (en) Combination track
CN206887634U (en) Using the railroad track obtuse frog of integral type heart rail
CN2931553Y (en) Longitudinal connecting frame orbit plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080813

Termination date: 20111025