CN201083119Y - Oil gas well completion temporary block liner tube - Google Patents

Oil gas well completion temporary block liner tube Download PDF

Info

Publication number
CN201083119Y
CN201083119Y CNU2007200789357U CN200720078935U CN201083119Y CN 201083119 Y CN201083119 Y CN 201083119Y CN U2007200789357 U CNU2007200789357 U CN U2007200789357U CN 200720078935 U CN200720078935 U CN 200720078935U CN 201083119 Y CN201083119 Y CN 201083119Y
Authority
CN
China
Prior art keywords
temporary blocking
liner tube
well
well completion
gas well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200789357U
Other languages
Chinese (zh)
Inventor
杨令瑞
肖新宇
肖润德
李艳丰
杨玻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Drilling Technology Research Institute of CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Drilling And Productino Process Technology Inst Sichuan Petroleum Administrati
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Drilling And Productino Process Technology Inst Sichuan Petroleum Administrati filed Critical Drilling And Productino Process Technology Inst Sichuan Petroleum Administrati
Priority to CNU2007200789357U priority Critical patent/CN201083119Y/en
Application granted granted Critical
Publication of CN201083119Y publication Critical patent/CN201083119Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

An oil-gas well completion temporary blocking liner tube used in under-balance well completion after under-balance well drilling belongs to the manufacturing technical field of a well completion pipe string used in overall process under-balance well drilling. The utility model, which makes use of the property that temporary blocking agent melts automatically under high temperature, designs the oil-gas well completion temporary blocking liner tube, wherein the liner tube comprises an upper joint and a lower joint; the tube body is provided with through screen apertures; the insides of the screen apertures are filled with temporary blocking agent. The utility model solves the problems that: according to the prior art, tail pipe perforation results in tail pipe deformation; moreover, a tail pipe is in nonstationary state inside a well, which brings trouble to follow-up work. The screen apertures of the temporary blocking liner tube are processed on the ground, and have the characteristics of convenient processing and no deformation; moreover, different adhesives can be selected to realize temporary blocking according to different well depth; when put in a well, the temporary blocking agent melts slowly as underground temperature reaches the preset value, thereby reaching the goal that the liner tube is changed to a temporary blocking liner tube with screen apertures.

Description

Oil gas well completion temporary blocking liner tube
Technical field:
A kind of oil gas well completion temporary blocking liner tube is used for underbalance and creeps into later under balance pressure drilling completion, belongs to the designing and manufacturing technique technical field of overall process under-balance drilling completion tubular string.
Background technology:
At present, technology such as the underbalance in the overall process under-balance drilling technology is crept into, not kill-job band is pressed and made a trip, underbalance is got core, not kill-job band is pressed well logging have all reached its maturity, but the insufficient balance well completion mode is also more single, main completion mode is barefoot completion and liner completion, the mode of barefoot completion has fast and the advantage of saving, but its shortcoming is: only just can implement in the harder layer position of subsurface rock, can cause the borehole wall to collapse on softer stratum and scall enforcement barefoot completion, and finally cause well unavailable; Adopting tail pipe completion under the condition of not cementing the well is mode commonly used at present, but need implement perforation to the tail pipe of G.I.H, making it become petroleum resources that bushing pipe with holes just can make the down-hole enters oil pipe and is adopted ground, but because the impact of perforation is bigger, the tail pipe distortion is big behind the perforation, and because tail pipe not well cementation in well, be in unfixed state, not placed in the middle in well, the pin of the unidirectional level pressure joint of the oil pipe that is lowered to after can causing like this blocks at the tail pipe of cutting off the fried distortion of back valve core quilt can not fall into the shaft bottom, bring trouble to follow-up work, number of patent application is that 200520113354.3 patent application discloses a completion system that insufficient balance well completion is used, this patent is that nonpenetrating bar shaped axial groove is cut in segmentation in advance on pipe, by expander nonpenetrating bar shaped axial groove is expanded again after these are cut the pipe G.I.H of bar-shaped trough, become the screen casing that penetrates, play the effect of blocking down-hole silt, but, in actual applications, this Technology Need is lowered to hanger earlier, and hanger and bobbin seal combined, because the coupling part of sleeve pipe and hanger exists circularity form and position tolerance and dimensional tolerance, be difficult to seal and put in place, and therefore cause hanger to hang failure, hanger is provided with failure and will be directed at and has the non-pipe that penetrates the bar shaped axial groove and can't be suspended in the well, in the process of test, there is the hanger setting to finish accidentally, but when being lowered to expander and outwarding winding nonpenetrating bar shaped axial groove, because expander brings higher temperature with the friction of pipe string, make the rod axle of expander cause adhesion with the pipe string, can't in well, drilling tool be proposed, finally cause well to be scrapped, in addition, the non-bar shaped axial groove that penetrates that cuts can make the intensity of pipe string descend greatly, will be out of shape when running into hole anomaly.
Summary of the invention:
The purpose of this utility model is at prior art problems, the characteristics of utilizing diverting agent under higher temperature, to melt voluntarily, design a kind of sieve aperture of on pipe, offering, and stop up, in well, melt the oil gas well completion temporary blocking liner tube of de-plugging then under the high temperature voluntarily by diverting agent.
The utility model is achieved in that the utility model comprises body and joint, be provided with top connection and lower contact at the two ends of body, have round sieve on body, sieve aperture is by the diverting agent shutoff, specific implementation method is, earlier offer sieve aperture on the body circumference, make it become bushing pipe, the sieve diameter on the bushing pipe inwall is little, sieve diameter on the outer wall is big, then, sieve aperture is blocked by bonding agent, and dry solidification; During use, need to determine the pipe string of length at the scene as required, on the pipe string, get out the hole of needs quantity then according to the size of tolerance, owing to be to implement the underbalance band to depress into the pipe string, need in the process that is lowered to the pipe string, stop crude oil or natural gas in the well to enter in the pipe by sieve aperture, so diverting agent is injected the good hole of brill, and make its drying, so just make the bushing pipe that hole-drilled screen casing becomes does not have the hole, reach the purpose that is lowered to the pipe string under the situation of pressure having, lower end with ready-made oil gas well completion temporary blocking liner tube connects guide shoe then, top connection jointed rod, and G.I.H are after arriving predetermined well depth, the temperature of down-hole can connect being stained with on the temporary blocking liner tube agent melts, and so just can implement the production of oil gas without perforation.
The beneficial effects of the utility model are: the sieve aperture of temporary blocking liner tube is processed on ground, has processing conditions preferably, also can not cause the distortion of temporary blocking liner tube, the hole of being bored simultaneously is less, substantially can not influence the intensity of pipe string, because being different being stained with of different choice according to well depth, the diverting agent that uses connects agent as the sieve aperture on the diverting agent shutoff temporary blocking liner tube, therefore after the desired depth of G.I.H, diverting agent can slowly melt under certain downhole temperature, reach the purpose that becomes the temporary blocking liner tube that has sieve aperture, owing to reduced perforation, temporary blocking liner tube can not be out of shape, a bite well just can be saved the perforation cost about 1,000,000 yuan, can also accelerate the paces of oil-gas mining.
Description of drawings:
Fig. 1 is the temporary blocking liner tube generalized section in the hole of plugging temporarily.
The specific embodiment:
Provide embodiment of the present utility model below in conjunction with accompanying drawing: the utility model comprises body 2 and joint, the two ends of body are provided with top connection 1 and lower contact 5, on the circumference of body 2, have the conical sieve aperture 3 of 8-10mm, the conical sieve aperture 3 that connects body 2 is taper, the diameter of diameter<tube wall one face of inboard wall of tube body one face, conical sieve aperture 3 is inside and outside perforation on body 2, be marked with diverting agent 4 shutoff in the conical sieve aperture 3, the pressure that the diverting agent of the conical sieve aperture 3 of shutoff bears is 10MPa, fusion temperature>80 ℃; Specific implementation method is: pipe string that need to determine length at the scene as required, size according to tolerance gets out the inside and outside tapered sieve aperture 3 that connects on the body 2 of ordinary casing then, so just made the screen casing that has sieve aperture 3, because depressing the pipe string, enforcement underbalance band need in the process that is lowered to the pipe string, stop crude oil or natural gas in the well enter in the pipe by sieve aperture, after so screen casing is made, use the well depth of well according to screen casing, the bonding agent that selection is adapted at dissolving under the uniform temperature environment injects brill as diverting agent 4, and good hole blocks sieve aperture 3, and make diverting agent 4 dry solidifications, can play sealing after diverting agent 4 is dry and bear≤pressure of 10MPa, like this, hole-drilled screen casing just becomes the bushing pipe that does not have the hole, can reach the purpose that is lowered to the pipe string under the situation of pressure having; In use, the oil gas well completion temporary blocking liner tube lower contact 5 of next root connects guide shoes, top connection 1 connects a last temporary blocking liner tube, after having connected the temporary blocking liner tube that all needs length, top connection 1 jointed rod of a temporary blocking liner tube topmost, and be lowered to the degree of depth that needs, in the process that in well, is lowered to, fashionable under beginning, because well temperature is lower than fusion temperature, temporary blocking liner tube keeps good sealing, and natural gas in the well or crude oil can not enter in the pipe string, when temporary blocking liner tube arrives predetermined well depth, after temperature reached predetermined value, diverting agent began to dissolve automatically, and the diverting agent on the temporary blocking liner tube 4 is all melted slowly, make originally by stifled and the pipe of non-mesh becomes the screen casing that has sieve aperture 3 temporarily, giving up then trips out drilling tool, therefore just can finish the operation of bushing pipe under the not kill-job under the insufficient balance condition without perforation, when if diverting agent can not melt arriving predetermined well depth, can in well, inject high-temperature steam and impel the diverting agent thawing and become screen casing.

Claims (3)

1. an oil gas well completion temporary blocking liner tube comprises body and joint, it is characterized in that: have the round taper hole of 8-10mm on the described body circumference, round taper hole is inside and outside perforation on body, is marked with the diverting agent shutoff in conical hole.
2. oil gas well completion temporary blocking liner tube according to claim 1 is characterized in that: the pressure that described diverting agent bears is≤10MPa; The fusion temperature of diverting agent>80 ℃.
3. oil gas well completion temporary blocking liner tube according to claim 1 is characterized in that: described round taper hole is at the diameter of the diameter<tube wall one side of inboard wall of tube body one side.
CNU2007200789357U 2007-03-30 2007-03-30 Oil gas well completion temporary block liner tube Expired - Fee Related CN201083119Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200789357U CN201083119Y (en) 2007-03-30 2007-03-30 Oil gas well completion temporary block liner tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200789357U CN201083119Y (en) 2007-03-30 2007-03-30 Oil gas well completion temporary block liner tube

Publications (1)

Publication Number Publication Date
CN201083119Y true CN201083119Y (en) 2008-07-09

Family

ID=39625584

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200789357U Expired - Fee Related CN201083119Y (en) 2007-03-30 2007-03-30 Oil gas well completion temporary block liner tube

Country Status (1)

Country Link
CN (1) CN201083119Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010069117A1 (en) * 2008-12-17 2010-06-24 中国石油天然气集团公司 Sieve tube well completion method in under-balanced condition and temporary plugging type sieve tube
CN101440701B (en) * 2008-12-17 2011-09-07 中国石油天然气集团公司 Temporary blocking type sieve tube of insufficient balance well completion
GB2496957A (en) * 2011-11-28 2013-05-29 Otkrytoe Aktsionernoe Obschestvo Tatneft Im Expandable sand screen having temporarily sealed slots.
CN109779567A (en) * 2019-03-10 2019-05-21 辽宁石油化工大学 A kind of completion system for oil/gas well
CN114837648A (en) * 2021-06-22 2022-08-02 重庆一三六地质队 Power coal underground in-situ controllable combustion heat production and carbon burial integrated system and method
CN117514088A (en) * 2024-01-05 2024-02-06 四川圣诺油气工程技术服务有限公司 Method for pressing long screen pipe under pressure

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010069117A1 (en) * 2008-12-17 2010-06-24 中国石油天然气集团公司 Sieve tube well completion method in under-balanced condition and temporary plugging type sieve tube
CN101440701B (en) * 2008-12-17 2011-09-07 中国石油天然气集团公司 Temporary blocking type sieve tube of insufficient balance well completion
GB2496957A (en) * 2011-11-28 2013-05-29 Otkrytoe Aktsionernoe Obschestvo Tatneft Im Expandable sand screen having temporarily sealed slots.
GB2496957B (en) * 2011-11-28 2018-02-28 Otkrytoe Aktsionernoe Obschestvo Tatneft Im Expandable sand screen and method for well casing for thermal oil recovery
CN109779567A (en) * 2019-03-10 2019-05-21 辽宁石油化工大学 A kind of completion system for oil/gas well
CN109779567B (en) * 2019-03-10 2021-06-15 辽宁石油化工大学 Well completion device for oil and gas well
CN114837648A (en) * 2021-06-22 2022-08-02 重庆一三六地质队 Power coal underground in-situ controllable combustion heat production and carbon burial integrated system and method
CN114837648B (en) * 2021-06-22 2023-04-07 重庆一三六地质队 Power coal underground in-situ controllable combustion heat production and carbon burial integrated system and method
CN117514088A (en) * 2024-01-05 2024-02-06 四川圣诺油气工程技术服务有限公司 Method for pressing long screen pipe under pressure
CN117514088B (en) * 2024-01-05 2024-04-05 四川圣诺油气工程技术服务有限公司 Method for pressing long screen pipe under pressure

Similar Documents

Publication Publication Date Title
CN201083119Y (en) Oil gas well completion temporary block liner tube
CN101275464A (en) Oil gas well completion temporary blocking liner tube
CN104196464B (en) Tubing string string and bridging plug set the method made with abrasive perforating connection
US9376878B2 (en) Apparatus and method for setting a cementitious material plug
CA2423762A1 (en) Cement shoe assembly for monobore well
CN102272413B (en) Annular barrier and annular barrier system
CN103958813B (en) Bushing pipe well cementing process
CN103422812B (en) The coal bed gas multi-branch horizontal drilling well of individual well eye and completion method
CN110984922B (en) Multi-branch ultra-short curvature radius well completion sand prevention pipe column structure
CN105239957A (en) Expanded tube leaking stoppage device capable of being assembled and released
CN111425148B (en) Casing pipe column applying toe end sliding sleeve to full-diameter sliding sleeve and application method thereof
CN103221631A (en) Drill hole plug
CN110374548B (en) Combined tool of toe end sliding sleeve and well cementation rubber plug and use method thereof
CN111663918A (en) Coal mining ground grouting process and grouting structure
CN110410053A (en) Coal mine roof plate pressure relief method based on eyelet supporting
WO2003106806A1 (en) A device and a method for drilling and completing a horizontal wellbore
CN105178912B (en) A kind of drilling tool by-passing valve
CN205382907U (en) Two effect expansion devices of machinery hydraulic pressure suitable for expansion pipe well drilling
CN201396123Y (en) Temporary plugging liner tube with tapered screw hole
CN101440702A (en) Sieve tube well completion method under insufficient balance condition and temporary blocking type sieve tube
CN104563872B (en) Blockage resisting self-filling-type float collar
CN113323619B (en) Plugging method for oil and gas well
CN112196498B (en) Cross-layer drilling separated type whole-course gas extraction hole sealing device
CN112431583A (en) Supporting device for drilling and completion of fishbone horizontal multilateral well in unconsolidated sandstone reservoir and supporting drilling method thereof
CN211115946U (en) Casing cementing slim hole staged fracturing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081128

Address after: Two south section of Zhongshan Road, Sichuan, Guanghan Province, China: 618300

Patentee after: Drilling Technology Research Institute, Chuanqing Drilling Engineering Co., Ltd. of China Petroleum Logging Co., Ltd.

Address before: The two section of South Zhongshan Road, Guanghan, Sichuan Province, China, 618300

Patentee before: Drilling and Productino Process Technology Inst., Sichuan Petroleum Administrati

ASS Succession or assignment of patent right

Owner name: CHINA PETROLEUM GROUP CHUANQING DRILLING ENGINEERI

Free format text: FORMER OWNER: SICHUAN PETROLEUM ADMINISTRATION DRILLING CRAFT TECHNOLOGY RESEARCH INSTITUTE

Effective date: 20081128

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080709

Termination date: 20150330

EXPY Termination of patent right or utility model