CN201083083Y - Hydraulic pressurization well borer - Google Patents

Hydraulic pressurization well borer Download PDF

Info

Publication number
CN201083083Y
CN201083083Y CNU2007200947505U CN200720094750U CN201083083Y CN 201083083 Y CN201083083 Y CN 201083083Y CN U2007200947505 U CNU2007200947505 U CN U2007200947505U CN 200720094750 U CN200720094750 U CN 200720094750U CN 201083083 Y CN201083083 Y CN 201083083Y
Authority
CN
China
Prior art keywords
hydraulic
directive wheel
derrick
drilling rod
wheel support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200947505U
Other languages
Chinese (zh)
Inventor
王德庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200947505U priority Critical patent/CN201083083Y/en
Application granted granted Critical
Publication of CN201083083Y publication Critical patent/CN201083083Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a hydraulic pressurizing well drill which belongs to the drill rod feed device technical field and is characterized in that: a drilling derrick is provided with a hydraulic oil cylinder connected with a working vehicle; a pressurizing wire rope and a lifting stem wire rope which are driven by operating up and down of the working vehicle are fixed with a tap; both ends of the tap are arranged on a vertical guide rail; the vertical guide rail has an oblique guide rail; a hoist guide wheel support is provided with an oblique angle to a left guide wheel support and a right guide wheel support arranged at both sides; a left back guide wheel and a right back guide wheel are respectively positioned inside a top frame; a hoisting machine is provided with a hydraulic motor; an upper hydraulic control switch is positioned beside an operation seat; a main pump pipe is provided with a cooling jacket and a hydraulic oil water jacket; moreover, a vehicle body deck is provided with an auxiliary drilling rod carrying rack. With increased functions, substantially improved mechanization degree, automation degree and efficiency and reduced man hour and cost, the utility model can adapt to independent long-term operation in all weathers in heavy weathers, complicated geologic environments and remote areas; moreover, the utility model is propitious to meet the deadline of construction period and to create benefits.

Description

Hydraulic pressurization formula trepan
Technical field
The utility model belongs to and feeds the boring rod set technical field, is specifically related to a kind of hydraulic pressurization formula trepan, and its international Patent classificating number is E21B 19/00.
Background technology
At present, the construction machinery that often adopts in the well-digging operation is the stepped type trepan, CZ-150 type trepan (anti-circulating) as the production of Wuchang City, Heilongjiang Province water conservancy machinery Co., Ltd, this machine is a vehicle body by 6 tons of cab-over-engine trucks that are power with 6110 type Diesel engines, is loaded with derrick, hydraulic pressure pole, hoist engine, hoisting rope, operative position, water injecting pump and suction pump (working barrel), hydraulic pressure spike and hydraulic power system etc. on it.
There are rotating disk, tap and main drilling rod, suspender, device for exerting and drilling rod to move changing device on the derrick.
Before the construction operation, needing earlier four hydraulic pressure spikes on the vehicle body to be propped, is that power erects derrick come after the upright rotating shaft rotation of inclining with hydraulic pressure pole.
The power of hydraulic pressure pole and four hydraulic pressure spikes is from hydraulic power system, and hydraulic oil pump wherein provides hydraulic power, is exported by the power that the hydraulic control switch is controlled on each branch's oil circuit.
Motor is rotating disk, hoist engine, water injecting pump and suction pump by power transmission, and hydraulic oil pump provides power.
During drilling well, rotating disk drives main drilling rod, driving the interior a plurality of secondary drilling rods that are connected of well and the drill bit of lowermost end again tunnels downwards, main drilling rod and a plurality of secondary drilling rod that joins and drill bit all are hollow tubulars, main drilling rod is connected on the suction pump by tap and main sebific duct, the bottom of drill bit is uncovered, directly facing to soil layer, rock stratum to be tunneled.
Water injecting pump is connected with suction pump by serises connecting tube.Before the driving, pass through suction pump, main pump pipe, main sebific duct, tap and main drilling rod fills with water in well head by water intaking in the water injecting pump puddle from the side earlier, discharge air in the well; When spudding in, suction pump brings out the ground mud that produces in the pick commentaries on classics upwards with water back suction backwater hole, and the water in the puddle constantly replenishes in well by irrigation canals and ditches and keeps water circulation, and this is called as anti-circulating drilling well.
In driving, rotate jointly by the main drilling rod a plurality of secondary drilling rods that join of drive and the drill bit of bottom, truck engine transmits power by power transmission and gives rotating disk, drive engageable with it main drilling rod (also can drive the secondary drilling rod that is engaged with) by rotating disk again, downwards then relying on manually of the device for exerting of the application of force constantly moved the runner of the left back position of iron pipe lever drives vehicle body with hand (runner had two, each can put an iron pipe lever, can operate simultaneously by two people, also can be by one man operation) drive a cover chain on the derrick and drive tap and main drilling rod to pressing down, reach drill bit.Because of being that manpower drives, strength is very limited, and maximum also only can reach 1 ton.It is best suited for the mud stone condition, makes a call to 100 meters well this moment, needs 8~10 hours; When running into above the 1300MPa rock-soil layer, driving is difficult to downwards, hardly may.
Hoist engine lifts by crane secondary drilling rod by hoisting rope, has drill rod thread to be connected with secondary drilling rod on the suspender.The stepped type trepan does not have the function of the secondary drilling rod of carrying usually, need by special accompanying transport vehicle carrying, need two people more than 75 kilograms secondary drilling rod to be lifted on the workbench of the appointment before the derrick at the scene, could enter well head by the suspender lifting, need before pre-with main drilling rod counter-rotating and the secondary drilling rod in below (close and block after changing drill rod rack, the open at ordinary times) back of threading off promote put in place into secondary drilling rod by the space.
The course of work that drilling rod moves changing device is, promote main drilling rod after, need the manual driven sprocket wheel to drive chain after pin-and-hole inserts pin, main drilling rod and tap could be moved inward at derrick and put in place, go into well and abdicate the space for hanging secondary drilling rod; Otherwise, they are shifted out before in the derrick enter the headwork position, need again manually take off pin from pin-and-hole.Changing-over successively will be with 5~7 minutes time, and subsequent process also is to switch so repeatedly, and time-consuming, efficient is also low, particularly ought be at dark, and the workman is difficult to see clearly, accurately operation.
During construction operation, need four-player usually at least, comprise hoist engine driver one people on the operative position, totally three people, quite lost labor lift secondary drilling rod, lift and exert pressure; And the secondary drilling rod of delivery fortune needs the special transport vehicle of adapted, at first needs secondary drilling rod is lifted on the other assigned work platform of trepan in car behind the scene, can be lifted by crane by suspender, and the workman lifts secondary drilling rod and very easily accidentally drops and cause serious industrial injury under tired situation.
When drilling well reaches the predetermined degree of depth, main drilling rod, secondary drilling rod and drill bit are proposed, the stepped type trepan moves backward, and hoist engine drives hoisting rope and through pipe of cement pulley down pipe of cement one joint one saved land and be lowered in the well always sign indicating number and then finish whole operations to well head.
With above-mentioned traditional mechanical system well-digging, exert pressure because of there being the dependence manpower; Hoist engine lifts main drilling rod (with the system of the iron chains on the suspender), secondary drilling rod (connecting with the drill rod thread on the suspender) in turn; Main drilling rod and tap are stopped in derrick, when leaving, are needed manually to insert, take off pin by turns, are unfavorable for very much operation after the darkness.So automation is poor, efficient is low, and when taking a lot of work, easily tired out, the cycle is long, and incompatible geological environment and operation from far-off regions in complexity are unfavorable for trying to meet the deadline for the project, and the wound benefit has not been given play to the potential that has trepan equipment now.
And, power relies on on-board engine fully, it as unique power when long-time, the big load operation, especially when environment temperature is higher than 25 ℃, the recirculated water of motor and the temperature of hydraulic oil rise very easily rapidly, can force the cooling that quits work of motor and hydraulic power system.
Also have, the power of hoist engine is from on-board engine and power transmission, operation power is steady inadequately, the moment of torsion of output is also big inadequately, also waste very much diesel fuel, meet water in the rainy day because of mechanical braking device and easily skid and can not work, the shut-down that causes of raining continuously may cause landslide in the well, loss drilling rod, drill bit and destroy in the past engineering, duration, quality and property all can be subjected to very big influence.
Summary of the invention
The purpose of this utility model provides a kind of hydraulic pressurization formula trepan, to overcome above shortcomings in the existing background technology.
The technical solution of the utility model is:
The utility model includes vehicle body, and the derrick that is loaded with of rear portion, the hydraulic pressure spike around it, and motor, power transmission and hydraulic power system, also has the hydraulic pressure pole, hoist engine and the operative position that are loaded with on its vehicle body deck;
With hydraulic pressure pole is on the power derrick upright by standing rotating shaft around inclining the rotating disk that can mesh and drive its rotation with main drilling rod, secondary drilling rod to be arranged, can link to each other with the tap on top by lower flange by the main drilling rod that drill rod thread is connected with secondary drilling rod, tap links to each other with elbow by upper flange plate, the other end of elbow is connected on the main sebific duct, also has following pipe of cement pulley on the derrick and changes drill rod rack; Main sebific duct links to each other with suction pump by the main pump pipe, and the delivery port of water injecting pump links to each other with suction pump by serises connecting tube, and the suction pump outlet pipe is arranged on the suction pump, and the water injecting pump water inlet pipe is arranged on the water injecting pump;
Hoisting rope on hoist engine order by on the derrick hold up elevator on the wheel carrier to hold up wheel and the elevator guide front wheel, the elevator guiding trailing wheel that are positioned on the elevator directive wheel support on the top frame of derrick link to each other with the suspender of derrick back, the drill rod thread that can be connected with secondary drilling rod is arranged on the suspender;
Hydraulic oil pump, hydraulic oil container, hydraulic control switch are arranged in the hydraulic power system, and the hydraulic control switch links to each other with hydraulic pressure pole with the hydraulic pressure spike that is positioned at branch's oil circuit, more than interconnect by the hydraulic oil conduit each other;
Power transmission and rotating disk, suction pump, water injecting pump, and hydraulic oil pump is connected.
The improvement that the utility model is done is:
Front lower at derrick is provided with the oil cylinder lower supporter, hydraulic jack is housed on it, the last oil inlet and outlet of hydraulic jack and following oil inlet and outlet insert hydraulic power system by the hydraulic oil conduit, be connected with the work car on the flexible push rod of hydraulic jack, work is equipped with revolver on the car, goes up right wheel, revolver and bottom right wheel down, and the sleeve pipe of the car of working by both sides is contained in can be along on its left and right guide pillar that slides up and down in stroke on the derrick;
The both sides of the elevator directive wheel support on the top frame on the derrick are provided with left directive wheel support and right directive wheel support, and left back directive wheel, left front directive wheel are arranged on the left directive wheel support, and right back directive wheel, right front directive wheel are arranged on the right directive wheel support;
The top of pressurization wire rope is fixed on the oil cylinder lower supporter, it upwards walks around the following revolver on the work car, after holding up wheel, left side end reverse wheel by a left side successively downwards, upwards be fixedly connected with tap, after holding up wheel from the right side by reverse wheel of the right end, the right side again, upwards walk around the bottom right wheel on the work car, turn back on the oil cylinder lower supporter downwards till, the end of pressurization wire rope also is fixed on the oil cylinder lower supporter;
The top of shadoof wire rope is fixed on the top frame, walk around the last revolver on the work car downwards, upwards successively by left front directive wheel, left back directive wheel on the left directive wheel support, downward and tap is fixedly connected, after passing through the right back directive wheel on the right directive wheel support, right front directive wheel from the right side again, till walking around bottom right wheel on the work car downwards and turning back on the top frame, the end of shadoof wire rope also is fixed on the top frame;
The two ends of tap are installed on the perpendicular guide rail of derrick both sides, and perpendicular guide rail is connected with the slant rail that tap is guided in the derrick at the flex point place.
Directly to elevator directive wheel support respectively and be between the left directive wheel support of both sides, right directive wheel support the oblique angle is arranged, left back directive wheel, right back directive wheel lay respectively on left directive wheel support and the right directive wheel support and help shadoof wire rope above it draw smoothly tap enter derrick, with respect to top frame position inside.
Hoist engine links to each other with the hydraulic motor of power is provided for it, and hydraulic motor inserts hydraulic power system.
The last hydraulic control switch of control hydraulic motor, hydraulic jack is positioned at by the operative position, and last hydraulic control switch inserts hydraulic power system.
Cooling jacket and hydraulic oil water jacket are housed on the main pump pipe; Water inlet, water out are arranged on the cooling jacket, link to each other with motor recirculated water water jacket; Oil-in, oil export are arranged on the hydraulic oil water jacket, insert the hydraulic circuit of hydraulic power system.
Secondary drilling rod carriage is installed on the vehicle body deck, and it is made up of column and cross bar.
Secondary drilling rod carriage is in the both sides on vehicle body deck.
The main method of operating of the present utility model and the course of work are:
(1) in the drilling well working site, when the secondary drilling rod of needs continued access in well, be sitting in the last hydraulic control switch on the driver's usefulness hand operation next door on the operative position, flexible push rod on the hydraulic jack is moved downward together with the work car, work on the car on revolver, last right wheel, following revolver, the bottom right wheel is common to be driven and the shadoof wire rope, tap and main drilling rod that the pressurization wire rope is fixedly connected rise along perpendicular guide rail, enter slant rail during to flex point, leading and main drilling rod then enters into the inside of derrick, above well head, abdicated working space, when its arrive at setting in stop vertical motion during the position, the flexible push rod on this moment hydraulic jack is withdrawn into the lower position;
(2) hydraulic control switch on the driver operation control hydraulic motor, hydraulic motor drives the hoist engine rotation, put down the suspender that hoisting rope links to each other, derrick other workman is drawing to all secondary drilling rods of carrying with suspender, be positioned at the secondary drilling rod carriage of the both sides on vehicle body deck, with the drill rod thread on the suspender, after secondary drilling rod upper end is connected, raise wire rope by driver operation hoist engine reverse rotation rolling, secondary drilling rod sling again descend, send into well head by rotating disk, its lower end and next save secondary drilling rod upper end (being stuck in closed changing on the drill rod rack) and join, the driver starts the rotating disk positive rotation, on, the drill rod thread of two secondary drilling rods spins mutually and links closely down, slightly rises suspender, make next save the rise disengaging of secondary drilling rod upper end and change drill rod rack, open and change drill rod rack, decline suspender and all secondary drilling rods, when the upper end of the secondary drilling rod of going up joint most to changing the drill rod rack place, close and change drill rod rack and block this place, manually back out, remove the tool of holding funeral rites; The last hydraulic control switch of driver operation control hydraulic jack, flexible push rod is oppositely risen, driving tap and main drilling rod move downward with the secondary drilling rod at well head place and contact, this moment, both drill rod threads connected, start the rotating disk positive rotation, drive main drilling rod rotation, both drill rod thread is spun mutually to link closely, stop rotating disk after screwing, open and change drill rod rack, be rotated further rotating disk, main drilling rod drives the drill bit rotation of all following secondary drilling rods and bottom, meanwhile, flexible push rod is the application of force upwards always, by the pressurization wire rope hydraulic power all is applied on tap and the main drilling rod, guarantees that driving carries out efficiently, particularly when running into lithosphere, ground auger is saturating effectively;
(3) when main drilling rod when dropping to extreme position, rotating disk and hydraulic jack are stopped, the flexible push rod of driver operation moves downward, drive tap and main drilling rod and rises,, stop rising when secondary drilling rod upper end is raised to when changing the drill rod rack place together with secondary drilling rod, to change drill rod rack closure (opening at ordinary times) and block secondary drilling rod, the backward rotation rotating disk, main drilling rod separates with secondary drilling rod, promotes main drilling rod enters derrick always through slant rail the inside.Below the process of Ji Xuing is with above step (1).
Other related operating methods and the course of work are with described in the background technology.
Good effect of the present utility model is:
---the performance of equipment greatly improves.On the one hand, provide power to replace manpower with hydraulic jack and exert pressure, the strength of exerting pressure can be brought up to 10~20 tons by 1 ton, when running into the 1300MPa rock-soil layer, also can tunnel; On the other hand, drilling rod moves to change to have removed from manually and inserts, takes off pin by turns, also lift main drilling rod, secondary drilling rod in turn without hoist engine, efficiently finish and exert pressure, promote and step down but drive tap and main drilling rod by two wire rope by hydraulic jack, can stop at an arbitrary position, shifting time only shortens to and needs 1 minute, no longer is subjected to influence round the clock, mechanization, automaticity height, the time-saving and efficiency.
---personnel selection reduces, and operating efficiency improves.At least need four-player before the improvement, 5~6 people at most, improve the back minimum just easily operation of two people that only needs, a driver operation hoist engine, workman is responsible for suspender utilization machinery from secondary drilling rod carriage to transferring the rotating disk, secondary drilling rod being installed, and exerting pressure and lifting secondary drilling rod no longer needs manually all to be replaced by machinery, be difficult for causing industrial injury, safety becomes.
---save energy consumption, time and expense, integrated cost can significantly reduce.To make a call to 60 meters well is example, and improving needed to finish in 30 hours as last, and the fuel oil expense adds 6 people's labour cost, amounts to 1100 yuan; Improve the back and only need 7~8 hours, the fuel oil expense adds two people's labour cost, amounts to 310 yuan.This well just can be saved 800 yuan.And the improvement cost of equipment itself is not high yet.
---after the power of hoist engine changes hydraulic motor into, operate steadily, power strengthens, and output torque strengthens, and fuel consume reduces, and mechanical braking device is unaffected in the rainy day, can work as usual, and duration, quality and property are no longer included any influence.
---utilize the water jacket that increases on the main pump pipe to give motor recirculated water and hydraulic oil cooling, help motor and hydraulic power system and under big load and hot weather condition, work long hours, reduced and shut down cooling.
---have self-contained capacity power.No longer with the secondary drilling rod retinue of special train carrying, itself can be loaded with 50 secondary drilling rod at most, can be used for digging a well 150 meters dark.
In a word, given full play of the potential of existing trepan through ingenious improvement, overcome its drawback, function increases, mechanization, automaticity and usefulness significantly improve, and save man-hour and cost, can adapt in bad weather, complicated geological environment and the long-term operation of round-the-clock independence from far-off regions, help trying to meet the deadline for the project the wound benefit.
Description of drawings
Fig. 1 is a left view of the present utility model;
Fig. 2 is a right view of the present utility model;
Fig. 3 is the rear elevation of the utility model derrick and secondary drilling rod carriage;
Fig. 4 is the front view of the utility model derrick and hoist engine;
Fig. 5 is the rear elevation of the utility model derrick and pressurize wire rope, shadoof wire rope;
Fig. 6 is the left view of the utility model derrick and pressurize wire rope, shadoof wire rope;
Fig. 7 is the vertical view of the top frame of the utility model derrick;
Fig. 8 is the front view of the utility model main pump pipe and cooling jacket, hydraulic oil water jacket;
Fig. 9 is the front view of the another kind of embodiment of the utility model work car;
Figure 10 is the front view of suction pump of the present utility model, serises connecting tube and water injecting pump.
In Fig. 1~9,1, vehicle body; 2, hydraulic pressure spike; 3, operative position; 4, hydraulic oil container; 5, secondary drilling rod carriage; 6, column; 7, cross bar; 8, vehicle body deck; 9, derrick; 10, hydraulic pressure pole; 11, the upright rotating shaft of inclining; 12, hoist engine; 13, hoisting rope; 14, elevator is held up wheel; 15, hold up wheel carrier; 16, elevator guiding trailing wheel; 17, elevator guide front wheel; 18, elevator directive wheel support; 19, suspender; 20, drill rod thread; 21, main drilling rod; 22, rotating disk; 23, secondary drilling rod; 24, following pipe of cement pulley; 25, hydraulic motor; 26, tap; 27, lower flange; 28, elbow; 29, upper flange plate; 30, main sebific duct; 31, suction pump; 32, water injecting pump; 33, hydraulic jack; 34, flexible push rod; 35, oil cylinder lower supporter; 36, go up oil inlet and outlet; 37, following oil inlet and outlet; 38, hydraulic oil conduit; 39, work car; 40, go up revolver; 41, go up right wheel; 42, following revolver; 43, bottom right wheel; 44, sleeve pipe; 45, guide pillar; 46, left directive wheel support; 47, right directive wheel support; 48, left back directive wheel; 49, right back directive wheel; 50, left front directive wheel; 51, right front directive wheel; 52, pressurization wire rope; 53, shadoof wire rope; 54, top frame; 55, top; 56, end; 57, perpendicular guide rail; 58, crossbeam; 59, top; 60, end; 61, left side end reverse wheel; 62, right side end reverse wheel; 63, wheel is held up on a left side; 64, wheel is held up on the right side; 65, slant rail; 66, flex point; 67, main pump pipe; 68, cooling jacket; 69, water inlet; 70, water out; 71, hydraulic oil water jacket; 72, oil-in; 73, oil export; 74, hydraulic control switch; 75, serises connecting tube; 76, suction pump outlet pipe; 77, water injecting pump water inlet pipe; 78, go up the hydraulic control switch; 79, change drill rod rack.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples, sees Fig. 1~10.
The CZ-150 type trepan of producing with Wuchang City, Heilongjiang Province water conservancy machinery Co., Ltd (anti-circulating) is an example, reequips.
At first remove the power input device on the hoist engine 12 of former configuration, and artificial device for exerting and drilling rod move changing device.
See Fig. 4, make the front lower of oil cylinder lower supporter 35 transverse weld with channel-section steel at derrick 9,20 tons hydraulic jack 33 is housed on it, the last oil inlet and outlet 36 of hydraulic jack 33 and following oil inlet and outlet 37 insert hydraulic power system by hydraulic oil conduit 38, be hinged with work car 39 on the flexible push rod 34 of hydraulic jack 33, work is equipped with revolver 40 on the car 39, goes up right wheel 41, revolver 42 and bottom right wheel 43 down, and the sleeve pipe 44 of the car 39 of working by both sides is contained in can be along on its left and right guide pillar 45 that slides up and down in stroke on the derrick 9.
See Fig. 9, work car 39 can also have another kind of embodiment, promptly going up revolver 40 and following revolver 42 is one group of tool, last right wheel 41 and bottom right wheel 43 are another group tool, the wheel shaft of four wheels on two groups of tools becomes with original vertical, connect with crossbeam 58 between two groups of tools, crossbeam 58 middle with below flexible push rod 34 be hinged.
See Fig. 7, on the top frame 54 on the derrick 9 both sides of elevator directive wheel support 18 placed in the middle each be welded into left directive wheel support 46 and right directive wheel support 47 with a pair of angle steel, between be have the sensing rear portion the oblique angle; On the left side directive wheel support 46 left back directive wheel 48, left front directive wheel 50 are installed, on the right directive wheel support 47 right back directive wheel 49, right front directive wheel 51 are arranged, left back directive wheel 48, right back directive wheel 49 lay respectively on left directive wheel support 46 and the right directive wheel support 47 and help above it shadoof wire rope 53 smoothly traction tap 26 enter derrick 9, with respect to top frame 54 1/3 position inside.
Fig. 4~6, the top 55 usefulness snap fit of pressurization wire rope 52 are on oil cylinder lower supporter 35, it upwards walks around the following revolver 42 on the work car 39, after holding up wheel 63, left side end reverse wheel 61 by a left side successively downwards, upwards be fastened mutually with tap 26, hold up wheel 64 by reverse wheel of the right end 62, the right side again after, upwards walk around the bottom right wheel 43 on the work car 39, till turning back on the oil cylinder lower supporter 35 downwards, the end 56 of pressurization wire rope 52 also uses snap fit on oil cylinder lower supporter 35; The top 59 usefulness snap fit of shadoof wire rope 53 are on top frame 54, walk around the last revolver 40 on the work car 39 downwards, upwards successively by left front directive wheel 50, left back directive wheel 48 on the left directive wheel support 46, be fastened mutually with tap 26 downwards, again by behind the right back directive wheel 49 on the right directive wheel support 47, the right front directive wheel 51, till walking around bottom right wheel 43 on the work car 39 downwards and turning back on the top frame 54, the end 60 of shadoof wire rope 53 also uses snap fit on top frame 54; Tap 26 two ends are installed on the perpendicular guide rail 57 that derrick 9 both sides are welded into channel-section steel, and slant rail 65 also is welded with channel-section steel, and perpendicular guide rail 57 is in flex point 66 places and 65 smooth-going being connected of slant rail.
See Fig. 4, connect hydraulic motor 25 on the hoist engine 12 for it provides power, model is used 75 series, and hydraulic motor 25 inserts hydraulic power system.
See Fig. 3, both sides are welded into secondary drilling rod carriage 5 by column 6 and cross bar 7 on the vehicle body deck 8, and every side can be loaded with 25 at most, the secondary drilling rod 23 that both sides are loaded with 50 23,50 on secondary drilling rod altogether can be used for digging a well 150 meters dark.
See Fig. 8, cooling jacket 68 and hydraulic oil water jacket 71 are arranged welding on the main pump pipe 67; Water inlet 69, water out 70 are arranged on the cooling jacket 68, link to each other with motor recirculated water water jacket; Oil-in 72, oil export 73 are arranged on the hydraulic oil water jacket 71, insert the hydraulic circuit of hydraulic power system.
See Fig. 1, Fig. 2, the last hydraulic control switch 78 of control hydraulic motor 25, hydraulic jack 33 is positioned at operative position 3 right sides, is convenient to driver's right-hand operated, and last hydraulic control switch 78 inserts hydraulic power system.
So far, repacking finishes.

Claims (7)

1. hydraulic pressurization formula trepan, include vehicle body (1), and the derrick (9) that is loaded with of rear portion, the hydraulic pressure spike (2) around it, and motor, power transmission and hydraulic power system, also have the hydraulic pressure pole (11), hoist engine (12) and the operative position (3) that are loaded with on its vehicle body deck (8);
With hydraulic pressure pole (11) is on the power derrick (9) upright by standing rotating shaft around inclining the rotating disk (22) that can mesh and drive its rotation with main drilling rod (21), secondary drilling rod (23) to be arranged, can link to each other with the tap (26) on top by lower flange (27) by the main drilling rod (21) that drill rod thread (20) is connected with secondary drilling rod (23), tap (26) links to each other with elbow (28) by upper flange plate (29), the other end of elbow (28) is connected on the main sebific duct (30), and derrick (9) is last to be also had following pipe of cement pulley (24) and change drill rod rack (79); Main sebific duct (30) links to each other with suction pump (31) by main pump pipe (67), the delivery port of water injecting pump (32) links to each other with suction pump (31) by serises connecting tube (75), suction pump outlet pipe (76) is arranged on the suction pump (31), water injecting pump water inlet pipe (77) is arranged on the water injecting pump (32);
Hoisting rope (13) on the hoist engine (12) order links to each other with the suspender (19) of derrick (9) back by holding up elevator on the wheel carrier (15) to hold up wheel (14) and being positioned at elevator guide front wheel (17), elevator on the elevator directive wheel support (18) on the top frame (54) of derrick (9) trailing wheel (16) that leads on the derrick (9), and the drill rod thread (20) that can be connected with secondary drilling rod (23) is arranged on the suspender (19);
Hydraulic oil pump, hydraulic oil container (4), hydraulic control switch (74) are arranged in the hydraulic power system, and hydraulic control switch (74) links to each other with hydraulic pressure pole (11) with the hydraulic pressure spike (2) that is positioned at branch's oil circuit, more than interconnect by the hydraulic oil conduit each other;
Power transmission and rotating disk (22), suction pump (31), water injecting pump (32), and hydraulic oil pump is connected;
It is characterized in that:
Front lower at derrick (9) is provided with oil cylinder lower supporter (35), hydraulic jack (33) is housed on it, the last oil inlet and outlet (36) of hydraulic jack (33) and following oil inlet and outlet (37) insert hydraulic power system by hydraulic oil conduit (38), the flexible push rod (34) of hydraulic jack (33) is gone up with work car (39) and is connected, on the work car (39) revolver (40) is installed, last right wheel (41), following revolver (42) and bottom right wheel (43), work car (39) sleeve pipe (44) by both sides is contained in can be along its left side that slides up and down in stroke on the derrick (9), on the right guide pillar (45);
The both sides of the elevator directive wheel support (18) on the top frame (54) on the derrick (9) are provided with left directive wheel support (46) and right directive wheel support (47), on the left side directive wheel support (46) left back directive wheel (48), left front directive wheel (50) are arranged, right back directive wheel (49), right front directive wheel (51) are arranged on the right directive wheel support (47);
The top (55) of pressurization wire rope (52) is fixed on the oil cylinder lower supporter (35), it upwards walks around the following revolver (42) on the work car (39), after holding up wheel (63), left side end reverse wheel (61) by a left side successively downwards, upwards be fixedly connected with tap (26), after holding up wheel (64) from the right side by right end reverse wheel (62), the right side again, upwards walk around the bottom right wheel (43) on the work car (39), till turning back on the oil cylinder lower supporter (35) downwards, the end (56) of pressurization wire rope (52) also is fixed on the oil cylinder lower supporter (35);
The top (59) of shadoof wire rope (53) is fixed on the top frame (54), walk around the last revolver (40) on the work car (39) downwards, upwards successively by the left front directive wheel (50) on the left directive wheel support (46), left back directive wheel (48), be fixedly connected with tap (26) downwards, pass through the right back directive wheel (49) on the right directive wheel support (47) again from the right side, behind the right front directive wheel (51), till walking around bottom right wheel (43) on the work car (39) downwards and turning back to top frame (54) and go up, the end (60) of shadoof wire rope (53) also is fixed on the top frame (54);
The two ends of tap (26) are installed on the perpendicular guide rail (57) of derrick (9) both sides, and perpendicular guide rail (57) is located to be connected with the slant rail (65) that tap (26) is guided in the derrick (9) in flex point (66).
2. a kind of hydraulic pressurization formula trepan as claimed in claim 1, it is characterized in that: directly to elevator directive wheel support (18) respectively and be between the left directive wheel support (46) of both sides, right directive wheel support (47) oblique angle is arranged, left back directive wheel (48), right back directive wheel (49) lay respectively at left directive wheel support (46) and right directive wheel support (47) go up and help above it shadoof wire rope (53) smoothly traction leading (26) enter derrick (9), with respect to top frame (54) position inside.
3. a kind of hydraulic pressurization formula trepan as claimed in claim 1 is characterized in that: hoist engine (12) links to each other with the hydraulic motor (25) that power is provided for it, and hydraulic motor (25) inserts hydraulic power system.
4. a kind of hydraulic pressurization formula trepan as claimed in claim 3 is characterized in that: it is other that the last hydraulic control switch (78) of control hydraulic motor (25), hydraulic jack (33) is positioned at operative position (3), and last hydraulic control switch (78) inserts hydraulic power system.
5. a kind of hydraulic pressurization formula trepan as claimed in claim 1 is characterized in that: cooling jacket (68) and hydraulic oil water jacket (71) are housed on main pump pipe (67); Water inlet (69), water out (70) are arranged on the cooling jacket (68), link to each other with motor recirculated water water jacket; Oil-in (72), oil export (73) are arranged on the hydraulic oil water jacket (71), insert the hydraulic circuit of hydraulic power system.
6. a kind of hydraulic pressurization formula trepan as claimed in claim 1 is characterized in that: secondary drilling rod carriage (5) is installed on vehicle body deck (8), and it is made up of column (6) and cross bar (7).
7. a kind of hydraulic pressurization formula trepan as claimed in claim 6, it is characterized in that: secondary drilling rod carriage (5) is in the both sides of vehicle body deck (8).
CNU2007200947505U 2007-12-11 2007-12-11 Hydraulic pressurization well borer Expired - Fee Related CN201083083Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200947505U CN201083083Y (en) 2007-12-11 2007-12-11 Hydraulic pressurization well borer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200947505U CN201083083Y (en) 2007-12-11 2007-12-11 Hydraulic pressurization well borer

Publications (1)

Publication Number Publication Date
CN201083083Y true CN201083083Y (en) 2008-07-09

Family

ID=39625548

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200947505U Expired - Fee Related CN201083083Y (en) 2007-12-11 2007-12-11 Hydraulic pressurization well borer

Country Status (1)

Country Link
CN (1) CN201083083Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101509358B (en) * 2009-03-30 2012-05-23 新疆石油管理局井下作业公司 Tube fitting pressing device
CN107724967A (en) * 2017-11-28 2018-02-23 徐工集团工程机械有限公司 Trepan and engineering truck

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101509358B (en) * 2009-03-30 2012-05-23 新疆石油管理局井下作业公司 Tube fitting pressing device
CN107724967A (en) * 2017-11-28 2018-02-23 徐工集团工程机械有限公司 Trepan and engineering truck

Similar Documents

Publication Publication Date Title
CN104563912B (en) A kind of well drilling pipe column automation operating system
CN201372722Y (en) Top drive casing running device
CN202417306U (en) Novel water well drilling machine
CN102226342B (en) Multi-functional piling machine for jet grouting pile-sinking
CN201826837U (en) Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables
CN201598973U (en) Translational power head of full hydraulic core drilling machine
CN103510852A (en) Rotary drilling rig
CN204921002U (en) Transport and stock anchor rope support system
CN201083083Y (en) Hydraulic pressurization well borer
CN103867122A (en) Full-hydraulic mountain exploratory crawler drilling machine
CN204646086U (en) A kind of water drilling Spiral digging machine
CN204024469U (en) The all-hydraulic anchor shaft anchor cable drill carriage of six arms that a kind of supporting continuous miner uses
CN201560710U (en) Integral all-hydraulic drill for mining capable of satisfying several drilling styles
CN212774127U (en) Novel hybrid rotary drilling rig
CN201013237Y (en) Portable hilly land drilling rig
CN104653100A (en) Hydraulic rotary drilling machine
CN201003400Y (en) Cantilevered type coal roadway driller
CN206468895U (en) A kind of conduit jacking
CN201296924Y (en) Rotary drilling type ground anchor implantation machine
CN108756744A (en) Underbalance air reverse circulation drilling equipment in a kind of shield type casing
CN201152052Y (en) Pole setting machine for boring
CN201144640Y (en) Hydraulic telescopic door frame type drill
CN203742448U (en) Full-hydraulic exploration crawler drilling rig for mountainous regions
CN201196023Y (en) Screw pile machine
CN204419030U (en) A kind of novel pneumatic post drill

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080709

Termination date: 20111211