CN201077125Y CNU2007200257779U CN200720025777U CN201077125Y CN 201077125 Y CN201077125 Y CN 201077125Y CN U2007200257779 U CNU2007200257779 U CN U2007200257779U CN 200720025777 U CN200720025777 U CN 200720025777U CN 201077125 Y CN201077125 Y CN 201077125Y
Authority
CN
China
Prior art keywords
jack
tensioning
draw
stretch
ground tackle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200257779U
Other languages
Chinese (zh)
Inventor
姜忠仁
韩站锋
李广坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Co Ltd
Original Assignee
China Railway 14th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 14th Bureau Group Co Ltd filed Critical China Railway 14th Bureau Group Co Ltd
Priority to CNU2007200257779U priority Critical patent/CN201077125Y/en
Application granted granted Critical
Publication of CN201077125Y publication Critical patent/CN201077125Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model provides a control device of prestressing concrete turnout sleeper for automatically tensioning and slowly loosing, comprising a tensioning end worktable, a producing pedestal and a loosing end worktable. A first jack and a second jack are arranged on the tensioning end worktable respectively, wherein, the first jack is connected with a first oil pump and the second jack is connected with a second oil pump. A first displacement sensor is arranged on the first jack and a second displacement sensor is arranged on the second jack. A first force sensor is arranged on the left side of the first jack and a second force sensor is arranged on the left side of the second jack. The first force sensor and the second force sensor are connected with a console by wires respectively and a reinforced fixer is arranged on the loosing end worktable. The utility model can achieve full automatic control of the tensioning device and the whole tensioning process of the prestressing can be completed by pressing the keys, so the utility model has the advantages of reducing the labor intensity and improving the safety. The whole tensioning process of the prestressing is measured by computer automatically and the tensioning force is controlled, thereby, the tensioning precision and the work efficiency are improved greatly.

Description

A control device is slowly put in the automatic stretch-draw of PRESTRESSED CONCRETE TURNOUT SLEEPERS
Technical field
The utility model relates to the device that in the switch tie production process prestressed component is carried out autofrettage, specifically is that a control device is slowly put in the automatic stretch-draw of a kind of PRESTRESSED CONCRETE TURNOUT SLEEPERS.
Background technology
In the work progress of switch tie, to the stretch-draw of deformed bar and put that to open be the critical process that whole switch tie is produced.In switch tie production process in the past, tension process and put Zhang Gong's preface and be generally manually-operated promptly adopts and manually starts oil pump, controls by oil pressure gauge, but the shortcoming that this kind method exists is: manually-operated oil pump control stretching force is accurate inadequately, influences product quality; Manually measure the tension of prestressed tendon stretch value and have problems such as error in reading is big, measuring process is slow, feedback information is inaccurate with testing tool; Expend more manpower, less economical; Manually-operated, potential safety hazard is bigger.
Summary of the invention
The purpose of this utility model is, provide the automatic stretch-draw of a kind of PRESTRESSED CONCRETE TURNOUT SLEEPERS slowly to put a control device, it can be controlled the stretch-draw of presstressed reinforcing steel automatically and slowly put and open in the PRESTRESSED CONCRETE TURNOUT SLEEPERS work progress, automatically monitor the stressed and stretch value of presstressed reinforcing steel, and stressing conditions and stretch value signal in time fed back to computer console, computer console is controlled jack tension power according to default technical indicator by oil pump, thereby realize promptly and accurately measurement and control stretching force, omnidistance by computer controlled automatic, save a large amount of manpowers, significantly increase work efficiency, improve the working environment of workers simultaneously, avoid the generation of security incident.
The utility model for achieving the above object, be achieved through the following technical solutions: it comprises stretch-draw end workbench, produce pedestal and put an end workbench, first jack and second jack are installed respectively on the stretch-draw end workbench, first jack is driven by first oil pump, on the first oil pump oil circuit first magnetic valve is set, second jack is driven by second oil pump, on the second oil pump oil circuit second magnetic valve is set, first magnetic valve all is connected with computer console by lead with second magnetic valve, first displacement transducer is installed on first jack, second displacement transducer is installed on second jack, first displacement transducer all is connected with computer console by lead with second displacement transducer, the first jack left end is provided with the first power sensor, the second jack left end is provided with the second power sensor, and the first power sensor is connected with computer console by lead respectively with the second power sensor.Put the first reinforcing bar fixator and the second reinforcing bar fixator are installed respectively on the end workbench.Stretch-draw end workbench left end is installed first ground tackle and second ground tackle respectively.First ground tackle and second ground tackle are installed respectively on the stretch-draw end workbench.Put an end workbench right-hand member the 3rd ground tackle and the 4th ground tackle are installed respectively.The 3rd ground tackle left end is connected with the first reinforcing bar fixator right-hand member, and the 4th ground tackle left end is connected with the second reinforcing bar fixator right-hand member.
Advantage of the present utility model is: it can realize the Automatic Control of tensioning equipment, makes whole prestressed stretch-draw process only need button just can finish, and reduces labour intensity, improves security; Whole prestressed stretch-draw process adopts computer automatic analysis and stretching force control, has improved stretch-draw precision and operating efficiency greatly; Avoid repeatedly the manual testing to adjust; And the computer remote that can realize the presstressed reinforcing steel construction is controlled; Computer console can store and print record stretching force and Extension Values of Prestress Reinforcements automatically, guarantees the accuracy of acceptance report; The utility model can also make the presstressed reinforcing steel stretching with each switch tie in the mould keep same intensity, makes things convenient for the production of specific position sleeper, improves sleeper production work efficient.
Description of drawings
Accompanying drawing 1 is a structural representation of the present utility model.
The specific embodiment
4 is stretch-draw end workbench among the figure, the 3rd, produce pedestal, the 2nd, put an end workbench, first jack 45 and second jack 46 are installed respectively on the stretch-draw end workbench 4, first jack 45 is connected with first oil pump 5, on first oil pump, 5 oil circuits first magnetic valve 51 is set, second jack 46 is connected with second oil pump 6, on second oil pump, 6 oil circuits second magnetic valve 61 is set, first magnetic valve 51 all is connected with Computer Control Unit 7 by lead with second magnetic valve 61, first displacement transducer 47 is installed on first jack 45, second displacement transducer 48 is installed on second jack 46, first displacement transducer 47 all is connected with computer console 7 by lead with second displacement transducer 48, first jack, 45 left ends are provided with the first power sensor 43, second jack, 46 left ends are provided with the second power sensor, 44, the first power sensors 43 and are connected with computer console 7 by lead respectively with the second power sensor 44.Use for convenient, first jack 45 and the first power sensor 43 can be made into one, and second jack 46 and the second power sensor 44 can be made into one.Put the first reinforcing bar fixator 21 and the second reinforcing bar fixator 22 are installed respectively on the end workbench 2.In order to prevent tension of prestressed tendon end retraction, first ground tackle 41 and second ground tackle 42 are installed respectively on the stretch-draw end workbench 4, first ground tackle 41 is corresponding with first jack 45, second ground tackle 42 is corresponding with second jack 46, first ground tackle, 41 right-hand members contact with the first power sensor, 43 left ends, and second ground tackle, 42 right-hand members contact with the second power sensor, 44 right-hand members.For preventing that presstressed reinforcing steel from putting the end retraction, put that the 3rd ground tackle 23 can be installed respectively on the end workbench 2 and the 4th ground tackle 24, the three ground tackles 23 are corresponding with the first reinforcing bar fixator 21, the 4th ground tackle 24 is corresponding with the second reinforcing bar fixator 22.Put an end and produce skew in order to prevent presstressed reinforcing steel, the 3rd ground tackle 23 left ends can be connected with the first reinforcing bar fixator, 21 right-hand members, the 4th ground tackle 24 left ends can be connected with the second reinforcing bar fixator, 22 right-hand members, certainly it is also passable not link together, reinforcing bar produces skew when the stretch-draw but ground tackle and reinforcing bar fixator separated easily, so we preferably are connected the 3rd ground tackle 23 left ends with the first reinforcing bar fixator, 21 right-hand members, the 4th ground tackle 24 left ends are connected with the second reinforcing bar fixator, 22 right-hand members.
During use, earlier first reinforcing bar 1 being put Zhang Duan is fixed on the first reinforcing bar fixator 21, pass the 3rd ground tackle 23 then first reinforcing bar 1 is put an end anchoring firmly, first reinforcing bar, 1 working position is placed in first mould 31 of producing pedestal 3, first reinforcing bar, 1 stretch-draw end passes first ground tackle 41 and is fixed on then in first jack 45, and the first power sensor 43 is installed on first reinforcing bar, the 1 stretch-draw end.Second reinforcing bar 11 is put Zhang Duan and is fixed on the second reinforcing bar fixator 22, pass the 4th ground tackle 24 then second reinforcing bar 11 is put an end anchoring firmly, second reinforcing bar, 11 working positions are placed in second mould 32 of producing pedestal 3, and second reinforcing bar, 11 stretch-draw ends pass second ground tackle 42 and are fixed on then in second jack 46.
During construction, set the stretch value of tension stress value and presstressed reinforcing steel earlier by the operation interface input of computer console 7, open the automatic stretch-draw of PRESTRESSED CONCRETE TURNOUT SLEEPERS then and slowly put a control device, computer console 7 sends signal respectively to first magnetic valve 51 and second magnetic valve 61 respectively, open first oil pump 5 and 6 pressurizations of second oil pump respectively, and then pressurize to first reinforcing bar 1 by first jack 45 respectively, second jack 46 is to 11 pressurizations of second reinforcing bar.During tension of prestressed tendon, the first power sensor 43 transfers signals to computer console 7 with first reinforcing bar, 1 suffered stretching force by lead, the second power sensor 44 transfers signals to computer console 7 with second reinforcing bar, 11 suffered stretching forces by lead, first displacement transducer 47 is transferred to computer console 7, the second displacement transducers 48 with the displacement of first jack 45 by lead the displacement of second jack 46 is transferred to computer console 7 by lead.7 pairs of above-mentioned signals of computer console carry out data and handle, store and show synchronously.When stretching force reach predetermined value, when Extension Values of Prestress Reinforcements reaches predetermined value, computer console also sends shutdown signals to first magnetic valve 51 and second magnetic valve 61 respectively, stops the pressurization of first oil pump 5 and second oil pump 6.

Claims (4)

1. a control device is slowly put in the automatic stretch-draw of PRESTRESSED CONCRETE TURNOUT SLEEPERS, comprise stretch-draw end workbench (4), produce pedestal (3) and put an end workbench (2), it is characterized in that: first jack (45) and second jack (46) are set on the stretch-draw end workbench (4), first jack (45) is connected with first oil pump (5), first oil pump (5) is gone up first magnetic valve (51) is installed, second jack (46) is connected with second oil pump (6), second magnetic valve (61) is installed on second oil pump (6) oil circuit, first magnetic valve (51) is connected with computer console (7) by lead respectively with second magnetic valve (61), first jack (45) is gone up first displacement transducer (47) is installed, second jack (46) is gone up second displacement transducer (48) is installed, first displacement transducer (47) is connected with computer console (7) by lead respectively with second displacement transducer (48), first jack (45) left end is provided with the first power sensor (43), second jack (46) left end is provided with the second power sensor (44), the first power sensor (43) is connected with computer console (7) by lead respectively with the second power sensor (44), puts the first reinforcing bar fixator (21) and the second reinforcing bar fixator (22) are set on the end workbench (2).
2. a control device is slowly put in the automatic stretch-draw of a kind of PRESTRESSED CONCRETE TURNOUT SLEEPERS according to claim 1, it is characterized in that: stretch-draw end workbench (4) left end is installed first ground tackle (41) and second ground tackle (42) respectively.
3. a control device is slowly put in the automatic stretch-draw of a kind of PRESTRESSED CONCRETE TURNOUT SLEEPERS according to claim 1, it is characterized in that: put end workbench (a 2) right-hand member the 3rd ground tackle (23) and the 4th ground tackle (24) are installed respectively.
4. a control device is slowly put in the automatic stretch-draw of a kind of PRESTRESSED CONCRETE TURNOUT SLEEPERS according to claim 3, it is characterized in that: the 3rd ground tackle (23) left end is connected with first reinforcing bar fixator (21) right-hand member, and the 4th ground tackle (24) left end is connected with second reinforcing bar fixator (22) right-hand member.
CNU2007200257779U 2007-08-06 2007-08-06 Automatically tensioning slowly-releasing control device for prestressed concrete switch sleeper Expired - Fee Related CN201077125Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200257779U CN201077125Y (en) 2007-08-06 2007-08-06 Automatically tensioning slowly-releasing control device for prestressed concrete switch sleeper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200257779U CN201077125Y (en) 2007-08-06 2007-08-06 Automatically tensioning slowly-releasing control device for prestressed concrete switch sleeper

Publications (1)

Publication Number Publication Date
CN201077125Y true CN201077125Y (en) 2008-06-25

Family

ID=39569179

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200257779U Expired - Fee Related CN201077125Y (en) 2007-08-06 2007-08-06 Automatically tensioning slowly-releasing control device for prestressed concrete switch sleeper

Country Status (1)

Country Link
CN (1) CN201077125Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103063174A (en) * 2011-10-20 2013-04-24 上海力远计算机科技有限公司 Wireless prestress tensile elongation measuring device
CN107627454A (en) * 2016-07-19 2018-01-26 天津银龙预应力材料股份有限公司 It is a kind of single with group automatic Tensioning locking device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103063174A (en) * 2011-10-20 2013-04-24 上海力远计算机科技有限公司 Wireless prestress tensile elongation measuring device
CN107627454A (en) * 2016-07-19 2018-01-26 天津银龙预应力材料股份有限公司 It is a kind of single with group automatic Tensioning locking device

Similar Documents

Publication Publication Date Title
CN201885697U (en) Automatic tension monitoring system for prestressed reinforcements
CN106124313B (en) Concrete and similar material are by the test device for depressing comprehensive deformation performance
CN103526948A (en) Control method of intelligent tension system and intelligent tension system
CN103317116B (en) Automatic adjusting system and control method based on die-casting machine clamping force
CN201555769U (en) Tension and compression stress strain detecting device
CN107449656A (en) A kind of concrete static modulus of elasticity measuring method
CN109490079A (en) A kind of reinforcement property detection device
CN201077125Y (en) Automatically tensioning slowly-releasing control device for prestressed concrete switch sleeper
CN207850806U (en) A kind of universal testing machine of measurable elasticity modulus
CN202119681U (en) Bending creep testing machine for GRP (Glass Reinforced Plastics)
CN106049880B (en) A kind of pretensioned prestressing construction automatic control system and method
CN104713782B (en) Fragment-free track slab retrofilling layer intensity detecting device
CN104111670B (en) Prestressed tension control system and control method
CN209296474U (en) A kind of reinforcement property detection device
CN103711318A (en) Smart tensioning device calibrating method
CN202330250U (en) Testing device for directly measuring bonding performance of early-stage concrete and steel bars
CN116448288A (en) Device and method for measuring side pressure of pier concrete template
CN116359014A (en) System and method for detecting strength of juvenile concrete
CN203587484U (en) Mechanical fixing device for measuring adhesive property between steel bar and concrete
CN109900562A (en) A kind of method of multiple pressure head detection polymer matrix composites bending property
CN204479410U (en) Fragment-free track slab retrofilling layer intensity detecting device
CN212031201U (en) Device for accurately measuring resilience modulus of geotechnical material
CN208872461U (en) Small value force measuring instrument rapid verification calibration system
CN203287131U (en) Detection device used for detecting tensile stress of steel bar
CN205766796U (en) A kind of sleeper prestressing force machine drawing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080625

Termination date: 20150806