CN201077070Y - Operation platform - Google Patents

Operation platform Download PDF

Info

Publication number
CN201077070Y
CN201077070Y CNU2007200242896U CN200720024289U CN201077070Y CN 201077070 Y CN201077070 Y CN 201077070Y CN U2007200242896 U CNU2007200242896 U CN U2007200242896U CN 200720024289 U CN200720024289 U CN 200720024289U CN 201077070 Y CN201077070 Y CN 201077070Y
Authority
CN
China
Prior art keywords
slip pipe
bracing diagonal
pipe
shaped
iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200242896U
Other languages
Chinese (zh)
Inventor
刘福军
李士彦
朱德力
冀强
吕世乐
崔海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ARMAMENT RADAR REPAIR SHOP JI-NAN MILITARY REGION PLA
Original Assignee
ARMAMENT RADAR REPAIR SHOP JI-NAN MILITARY REGION PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ARMAMENT RADAR REPAIR SHOP JI-NAN MILITARY REGION PLA filed Critical ARMAMENT RADAR REPAIR SHOP JI-NAN MILITARY REGION PLA
Priority to CNU2007200242896U priority Critical patent/CN201077070Y/en
Application granted granted Critical
Publication of CN201077070Y publication Critical patent/CN201077070Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to an operation platform, in particular to a foldable serialized and generalized operation platform, which is characterized in that: each set of operation platform comprises two connecting hounds forming an X-shape; the two ends of the connecting hounds are matched and connected with L-shaped steel and/or T-shaped steel; the upper L-shaped steel is matched and connected with the lower L-shaped steel through a support tube and an upper slip pipe sleeved on the support tube; the upper T-shaped steel is also matched and connected with the lower T-shaped steel through the support tube and the upper slip pipe sleeved on the support tube; the length of the upper slip pipe is bigger than the relative sliding distance produced when folding and furling the connecting hounds; the length of the support tube is bigger than or equal to the length of the upper slip pipe; a bedplate can be arranged on the top surface of the operation platform. The utility model has the advantages of simple structure, easy operation, fast unfolding and folding, convenient transportation and carrying, convenient and flexible use, regular folded forms, compact size of tightly folded connecting rod, small volume, operation in various situations, wide application range and effectively improved productivity.

Description

A kind of operation stand
Technical field
The utility model relates to a kind of operation stand, particularly a kind ofly can make up the operation stand that can fold.
Background technology
The existing operation stand that is used for less important work, majority are the operation stand of size, fixed in shape.Can not fold gathering, also inconvenience is moved, even if also must occupy a fixing space when not using, carrying is got up even needed many people to assist to carry out, and is extremely inconvenient.Especially in the high-tech military training of at present pursuit speed, efficient with fast in the spot repair, particularly during the repairing under the field condition, existing operation stand lags behind the demand of real crack troops far away, has a strong impact on progress, and consequence is hardly imaginable; And its width is unadjustable, can not satisfy the demand of different work or different people, so that all operating personnels can both be worked handyly.Though the stand that can fold is also arranged in the market, the equal more complicated of structure, huge is folded up and is also occupied very large space, the manufacturing cost height, and it is cumbersome to operate.
The utility model content
The utility model is at the existing in prior technology shortcoming, and provide a kind of technical scheme of the operation stand that can fold and can make up according to the needs of different situations, use the operation post shelf structure of this scheme simple, easy and simple to handle, can launch and fold gathering rapidly, be convenient to transport and carry, use flexible, convenient, fold up regular shape, take up room little, can use in multiple occasion, wide accommodation can effectively be increased work efficiency.
The utility model is realized by following technical measures:
A kind of operation stand, comprise the last slip pipe that is sleeved in the stay pipe, last slip pipe top, stay pipe bottom and L shaped iron or T shape iron are connected, L shaped iron or T shape iron also with cooperatively interact be connected the bracing diagonal one that is X-shaped, the two ends of bracing diagonal two are connected, the operation post top of support can be connected with platen.
Operation stand described in the utility model can include only the frame of organizing a performance, and also can be interconnected by some framves of organizing a performance as required to combine.
When the operation stand includes only one when organizing a performance frame, comprise that four groups of X-shaped bracing diagonals, four pairs go up slip pipe and stay pipe.Four pairs of bracing diagonals one, bracing diagonal two two ends all are connected with L shaped iron.
When the operation stand comprises some organizing a performance during frame, first frame of organizing a performance comprises that four pairs of X-shaped bracing diagonals, four pairs go up slip pipe and stay pipe, bracing diagonal one upper end and L shaped iron are connected, lower end and T shape iron are connected, and bracing diagonal two upper ends and T shape iron are connected, lower end and L shaped iron are connected; Remaining some frame of organizing a performance, every group comprises that three pairs of X-shaped bracing diagonals, two pairs go up slip pipe and stay pipe, the upper/lower terminal that is in the bracing diagonal in whole group job stand centre position all is connected with T shape iron, bracing diagonal one upper end and T shape iron are connected in last frame of organizing a performance, lower end and L shaped iron is connected, and bracing diagonal two upper ends and L shaped iron are connected, lower end and T shape iron are connected.Be in the entire job stand, except that two ends, the left and right sides were eight L shaped iron, all the other corresponding sites were T shape iron.
Last slip pipe is sleeved in the stay pipe, can freely slide up and down.Go up L shaped iron with down between the L shaped iron and go up between T shape iron and the following T shape iron and be connected with stay pipe by the last slip pipe that is sleeved on.
The utility model can also adopt following technical measures:
Bracing diagonal one, bracing diagonal two middle parts are connected by making its folding hinge that draws or be launched into X-shaped in.Bracing diagonal is swung freely, and when the operation stand was deployed condition, bracing diagonal one was bigger with the angle that bracing diagonal two makes progress, and is flat-shaped X-shaped; When the operation stand was rounding state, bracing diagonal one was less with the angle that bracing diagonal two makes progress, and is tall and thin shape X-shaped.
Matching with corresponding groove on L shaped iron, the T shape iron in the bracing diagonal two ends, and is connected by bearing pin.Be that the bracing diagonal middle part is a hinge axis, insert respectively in the corresponding recesses in " go up L shaped iron, down L shaped iron " or " go up L shaped iron, T shape iron " down or " following L shaped iron, go up T shape iron " or " go up T shape iron, T shape iron " down at two ends, then respectively with the fixing two ends of bearing pin.
The distance that last slip pipe length moves up in folding gathering process greater than bracing diagonal one, bracing diagonal two, stay pipe length is more than or equal to the length of last slip pipe.
Last slip pipe is connected with last L shaped iron or last T shape ferropexy, and stay pipe is with L shaped iron or following T shape ferropexy are connected down.Promptly go up slip pipe and the last L shaped iron that is positioned at its top or go up T shape Tie Tong and cross mode such as welding and fixedly connected; Stay pipe and the following L shaped iron that is positioned at its bottom or down T shape Tie Tong cross mode such as welding and fixedly connected.
Last slip pipe cross-sectional area is less than the stay pipe cross-sectional area.Last slip pipe can slide up and down in stay pipe freely.
Last slip pipe, stay pipe cross section can be circle, different shape such as square.
During use, be placed with platen on the operation stand, platen can directly be placed on the operation stand, also can fixedly connected with the operation stand by connected mode commonly used in the prior aries such as set bolt.Because stay pipe length is more than or equal to last slip pipe length, so the whole slip pipe of going up is arranged in stay pipe during user mode, the height of operation this moment stand equals the height of stay pipe, and bracing diagonal one is bigger with the angle that bracing diagonal two makes progress, and is flat-shaped X-shaped.Finish using when drawing the operation stand in, platen is pulled down, the angle that makes progress along with bracing diagonal one and bracing diagonal two constantly diminishes, upwards skid off in the continuous self-supporting pipe of last slip pipe, because the distance that last slip pipe length moves up in folding gathering process greater than bracing diagonal one, bracing diagonal two, so after the operation stand all drew in, the last slip pipe overwhelming majority was positioned at the stay pipe upper end, the length that last slip pipe is exposed to the outside equals the distance that the bracing diagonal top moves up in rounding state.Some is arranged in stay pipe last slip pipe, and bracing diagonal one is less with the angle that bracing diagonal two makes progress, and is the X-shaped of tall and thin shape.
Operation stand described in the utility model can guarantee enough disjunctor intensity when launch using, can carry out related work after platen is laid on the top, and the speed of finishing using when drawing in is very fast, singlely can finish whole operation.
The beneficial effect of this programme can be learnt according to the narration to such scheme, adopts the operation stand of this programme, and is simple in structure, easy and simple to handle; Can launch and fold gathering rapidly, use flexible, convenient; Fold up regular shape, take up room little, be convenient to the transportation and carry; Can be applied in the daily life such as machine shop, the Working gantry when rushing to repair as field operations is also most suitable, can use wide accommodation in multiple occasion; Can effectively increase work efficiency.
Description of drawings
Fig. 1 is the structural representation of second kind of embodiment of the utility model.
Fig. 2 is the structural representation of first kind of embodiment of the utility model.
Fig. 3 is the vertical view of second kind of embodiment deployed condition of the utility model.
Fig. 4 is the front view of second kind of embodiment rounding state of the utility model.
Fig. 5 is the front view of second kind of embodiment deployed condition of the utility model.
Among the figure, the last slip pipe of 1-; The 2-stay pipe; The last L shaped iron of 3-; The last T shape of 4-iron; 5-bracing diagonal one; The 6-hinge; L shaped iron under the 7-; T shape iron under the 8-; 9-bracing diagonal two; The 10-platen.
The specific embodiment
For clearly demonstrating the technical characterstic of this programme,, and, this programme is set forth in conjunction with its accompanying drawing below by a specific embodiment.
Embodiment 1
As shown in Figure 2, a kind of operation stand is made up of a group job stand.Comprise that four groups of X-shaped bracing diagonals, four pairs go up slip pipe 1 and stay pipe 2, last slip pipe 1 cross-sectional area is less than stay pipe 2 cross-sectional areas, be sleeved in the stay pipe 2, last slip pipe 1 top, stay pipe 2 bottoms all are fixedly connected by welding with last L shaped iron 3, following L shaped iron 7; Bracing diagonal 1, bracing diagonal 29 middle parts are connected by making its folding hinge 6 that draws or be launched into X-shaped in.Insert on the L shaped iron in the corresponding grooves at the two ends of bracing diagonal 1, bracing diagonal 29, fixes by bearing pin.The distance that last slip pipe 1 length moves up in folding gathering process greater than bracing diagonal 1, bracing diagonal 29, stay pipe 2 length are more than or equal to the length of last slip pipe 1.The operation post top of support can be connected with platen 10.
Last slip pipe 1, stay pipe 2 cross sections can be circle, different shape such as square.
During use, be placed with platen 10 on the operation stand, because stay pipe 2 length are more than or equal to last slip pipe 1 length, so the whole slip pipe 1 of going up is arranged in stay pipe 2, the height of operation this moment stand equals the height of stay pipe 2, bracing diagonal 1 is bigger with the angle that bracing diagonal 29 makes progress, and is flat-shaped X-shaped.Finish using when drawing the operation stand in, platen 10 is pulled down, the angle that makes progress along with bracing diagonal 1 and bracing diagonal 29 constantly diminishes, upwards skid off in the last slip pipe 1 continuous self-supporting pipe 2, because the distance that last slip pipe 1 length moves up in folding gathering process greater than bracing diagonal 1, bracing diagonal 29, after so the operation stand all draws in, last slip pipe 1 overwhelming majority is positioned at stay pipe 2 upper ends, and the length that last slip pipe 1 is exposed to the outside equals the distance that the bracing diagonal top moves up in rounding state.Some is arranged in stay pipe 2 last slip pipe 1, and bracing diagonal 1 is less with the angle that bracing diagonal 29 makes progress, and is the X-shaped of tall and thin shape.
Embodiment 2
As Fig. 1, Fig. 3, Fig. 4, shown in Figure 5, the operation stand comprises two framves of organizing a performance, first frame of organizing a performance comprises that four pairs of X-shaped bracing diagonals, four pairs go up slip pipe 1 and stay pipe 2, bracing diagonal one 5 upper ends and last L shaped iron 3 are connected, lower end and following T shape iron 8 are connected, bracing diagonal 29 upper ends and last T shape iron 4 are connected, the lower end and down L shaped iron 7 be connected.
Second frame of organizing a performance comprises that three pairs of X-shaped bracing diagonals, two pairs go up slip pipe 1 and stay pipe 2, and the upper end of bracing diagonal 1 and last T shape iron 4 are connected, and the lower end is connected with descending L shaped iron 7; The upper end of bracing diagonal 29 and last L shaped iron 3 are connected, and the lower end is connected with following T shape iron 8.The two ends that are positioned at two pairs of X-shaped bracing diagonals of the entire job stand left and right sides all are connected with last L shaped iron 3, following L shaped iron 7.Be in the entire job stand, except that two ends were eight L shaped iron, all the other corresponding sites were T shape iron.
Last slip pipe 1 cross-sectional area is less than stay pipe 2 cross-sectional areas, and last slip pipe cover 1 is contained in the stay pipe 2, can freely slide up and down.Go up L shaped iron 3 with down between the L shaped iron 7 and go up between T shape iron 4 and the following T shape iron 8 and be connected with stay pipe 2 by the last slip pipe 1 that is sleeved on.
Bracing diagonal 1, bracing diagonal 29 middle parts are connected by making its folding hinge 6 that draws or be launched into X-shaped in.Bracing diagonal is swung freely, and when the operation stand was deployed condition, bracing diagonal 1 was bigger with the angle that bracing diagonal 29 makes progress, and is flat-shaped X-shaped; When the operation stand was rounding state, bracing diagonal 1 was less with the angle that bracing diagonal 29 makes progress, and is tall and thin shape X-shaped.
Matching with corresponding groove on L shaped iron, the T shape iron in the bracing diagonal two ends, and is connected by bearing pin.Be that the bracing diagonal middle part is a hinge axis 6, insert respectively in the corresponding recesses in " go up L shaped iron 3, down T shape iron 8 " or " following L shaped iron 7, go up T shape iron 4 " at two ends, then respectively with the fixing two ends of bearing pin.
The distance that last slip pipe 1 length moves up in folding gathering process greater than bracing diagonal 1, bracing diagonal 29, stay pipe 2 length are more than or equal to the length of last slip pipe 1.
Last slip pipe 1 is fixedly connected by welding with last L shaped iron 3 or last T shape iron 4, and stay pipe 2 is with L shaped iron 7 or following T shape iron 8 are fixedlyed connected down.
Last slip pipe 1 cross-sectional area is less than stay pipe 2 cross-sectional areas.Last slip pipe 1 can slide up and down in stay pipe 2 freely.
Last slip pipe 1, stay pipe 2 cross sections can be circle, different shape such as square.
During use, be placed with platen 10 on the operation stand, because stay pipe 2 length are more than or equal to last slip pipe 1 length, so the whole slip pipe 1 of going up is arranged in stay pipe 2, the height of operation this moment stand equals the height of stay pipe 2, bracing diagonal 1 is bigger with the angle that bracing diagonal 29 makes progress, and is flat-shaped X-shaped.Finish using when drawing the operation stand in, platen is pulled down, the angle that makes progress along with bracing diagonal 1 and bracing diagonal 29 constantly diminishes, upwards skid off in the last slip pipe 1 continuous self-supporting pipe 2, because the distance that last slip pipe 1 length moves up in folding gathering process greater than bracing diagonal 1, bracing diagonal 29, after so the operation stand all draws in, last slip pipe 1 overwhelming majority is positioned at stay pipe 2 upper ends, and the length that last slip pipe 1 is exposed to the outside equals the distance that the bracing diagonal top moves up in rounding state.Some is arranged in stay pipe 2 last slip pipe 1, and bracing diagonal 1 is less with the angle that bracing diagonal 29 makes progress, and is the X-shaped of tall and thin shape.Operation stand described in the utility model can guarantee enough disjunctor intensity when launch using, can carry out related work after platen is laid on the top, and the speed of finishing using when drawing in is very fast, singlely can finish whole operation.

Claims (7)

1. operation stand, it is characterized in that: comprise the last slip pipe (1) that is sleeved in the stay pipe (2) in the operation stand, last slip pipe (1) top, stay pipe (2) bottom and L shaped iron or T shape iron are connected, L shaped iron or T shape iron also with cooperatively interact be connected the bracing diagonal one (5) that is X-shaped, the two ends of bracing diagonal two (9) are connected, the operation post top of support can be connected with platen (10).
2. operation stand according to claim 1 is characterized in that: bracing diagonal one (5), bracing diagonal two (9) middle parts are connected by making its hinge that closes up or be launched into X-shaped (6).
3. operation stand according to claim 1 and 2 is characterized in that: matching with corresponding groove on L shaped iron, the T shape iron in the bracing diagonal two ends, and is connected by bearing pin.
4. operation stand according to claim 1, it is characterized in that: go up the distance that slip pipe (1) length moves up in folding gathering process greater than bracing diagonal one (5), bracing diagonal two (9) tops, stay pipe (2) length is more than or equal to the length of last slip pipe (1).
5. according to claim 1 or 4 described operation stands, it is characterized in that: go up slip pipe (1) cross-sectional area less than stay pipe (2) cross-sectional area.
6. according to claim 1 or 4 described operation stands, it is characterized in that: go up slip pipe (1) with last L shaped iron (3) or go up T shape iron (4) and fixedly connected, stay pipe (2) is fixedlyed connected with time L shaped iron (7) or time T shape iron (8).
7. according to claim 1 or 4 described operation stands, it is characterized in that: go up slip pipe (1), stay pipe (2) cross section is rounded, square.
CNU2007200242896U 2007-07-06 2007-07-06 Operation platform Expired - Fee Related CN201077070Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200242896U CN201077070Y (en) 2007-07-06 2007-07-06 Operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200242896U CN201077070Y (en) 2007-07-06 2007-07-06 Operation platform

Publications (1)

Publication Number Publication Date
CN201077070Y true CN201077070Y (en) 2008-06-25

Family

ID=39569124

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200242896U Expired - Fee Related CN201077070Y (en) 2007-07-06 2007-07-06 Operation platform

Country Status (1)

Country Link
CN (1) CN201077070Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106080780A (en) * 2016-06-23 2016-11-09 湘潭大学 A kind of variable volume shipping platform based on Mecanum wheel and operational approach thereof
CN108908398A (en) * 2018-08-17 2018-11-30 成都跟驰科技有限公司 A kind of foldable robotic arm steelframe
CN109058688A (en) * 2018-09-03 2018-12-21 安庆金辉煌电子科技股份有限公司 A kind of convenient mounting rack for electroacoustic apparatus sound equipment
CN109121404A (en) * 2017-04-26 2019-01-01 苏州宝时得电动工具有限公司 workbench

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106080780A (en) * 2016-06-23 2016-11-09 湘潭大学 A kind of variable volume shipping platform based on Mecanum wheel and operational approach thereof
CN106080780B (en) * 2016-06-23 2019-04-12 湘潭大学 A kind of variable volume shipping platform and its operating method based on Mecanum wheel
CN109121404A (en) * 2017-04-26 2019-01-01 苏州宝时得电动工具有限公司 workbench
CN108908398A (en) * 2018-08-17 2018-11-30 成都跟驰科技有限公司 A kind of foldable robotic arm steelframe
CN109058688A (en) * 2018-09-03 2018-12-21 安庆金辉煌电子科技股份有限公司 A kind of convenient mounting rack for electroacoustic apparatus sound equipment
CN109058688B (en) * 2018-09-03 2020-11-06 安庆金辉煌电子科技股份有限公司 A convenient mounting bracket for electroacoustic equipment stereo set

Similar Documents

Publication Publication Date Title
CN201077070Y (en) Operation platform
US10864960B2 (en) Portable double folding bicycle
CN202024044U (en) Truss connecting device
CN202828971U (en) Automatic erecting stacking machine for large-scale ceramic plates
CN110468717B (en) Movable hanging basket for bridge construction
CN211075969U (en) Stretchable folding trolley
CN207495421U (en) A kind of operation post easy to remove and fixed
CN209776497U (en) Folding multifunctional trolley
CN205671865U (en) A kind of folding environment-friendly resin plate shelf
CN202212961U (en) Foldable tool car
CN210313183U (en) Truss tower and contain its strideing across construction protective equipment
CN213228749U (en) Shallow and folding chassis thereof
CN212280773U (en) Folding type movable goods shelf
CN202999590U (en) Folding working table sunshade umbrella
CN206888601U (en) A kind of marketing fast construction formula stage
CN207373134U (en) A kind of folding movable shelf
CN209319752U (en) A kind of Moveable foldable tool rack
CN209747040U (en) Shop billboard convenient to use
CN202653533U (en) Multi-purpose rack
CN203677889U (en) Portable basketball stand
CN207177438U (en) A kind of portable intelligent hydraulic pressure tent
CN203435580U (en) Foldable fishing platform
CN2212486Y (en) Foldable working bench for benchwork
CN214302791U (en) Folding work frame for architectural decoration
CN203398584U (en) Folding-type trolley for maintenance of switch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080625