CN201074402Y - Tool type scaffold - Google Patents

Tool type scaffold Download PDF

Info

Publication number
CN201074402Y
CN201074402Y CNU2007201266690U CN200720126669U CN201074402Y CN 201074402 Y CN201074402 Y CN 201074402Y CN U2007201266690 U CNU2007201266690 U CN U2007201266690U CN 200720126669 U CN200720126669 U CN 200720126669U CN 201074402 Y CN201074402 Y CN 201074402Y
Authority
CN
China
Prior art keywords
wall
building
scaffold
truss
attaching equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201266690U
Other languages
Chinese (zh)
Inventor
姚康华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007201266690U priority Critical patent/CN201074402Y/en
Application granted granted Critical
Publication of CN201074402Y publication Critical patent/CN201074402Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an instrumental scaffold which comprises a frame body (1), a truss (2) and a wall-attached device (3), wherein the frame body (1) is a double bent and is connected with the truss (2), the truss (2) is connected with the wall-attached device (3) which is further connected with a building (7), and a tower hoist is taken as the lifting power. The utility model is characterized in that at least two wall-attached devices (3) are arranged, and each can individually bear full load. The wall-attached device (3) is connected with a pull ring (6) which is arranged on the building (7), one end of the pull ring (6) is embedded in the building, the other end extends outside the building, thereby forming a closed loop. The utility model has the advantages of simple structure, convenient operation, safety, reliability and low cost, and can be used for the main structure construction and the outer wall construction of various buildings. The frame body (1) employs the assemblage of special steel pipes and buckles, thereby greatly reducing the deadweight and the steel capacity per unit and having significant economic and social values.

Description

The tool-type scaffold
Technical field
The utility model relates to a kind of building operations scaffold, is specifically related to a kind of tool-type scaffold that adopts tower crane to promote.
Background technology
At present, the scaffold that adopts on the high-building construction have usually console mode scaffold, overhanging scaffold, attachment type raise scaffold and, and inventor's the patent No. is 200520010416.8 and 200520009980.8 formerly applies for a patent---protection rack special for building main body construction (hereinafter to be referred as protective frame).The console mode scaffold slowly steps down from the stage of history because steel quantity consumption is huge, use cost is high; Overhanging scaffold is torn open owing to the workman need take repeatedly in the high-altitude, and labor strength is big, and has huge operational risk, also is eliminated gradually; The attachment type raise scaffold complex structure, cost is higher, requires the operator strongly professional, and is the highrise building of coating for external wall decorative material, use in the exterior wall decoration construction stage very difficult, thereby limited its range of application.The protective frame of inventor's design adopts tower crane to promote, simple in structure, safe and reliable, with low cost, operability is good, be subjected to very much user's welcome in practice, but this technology is to be that the highrise building of coating is researched and developed design in the main body construction stage at external wall decorative material, the decoration of exterior wall construction stage must be adopted hanging basket, be that the building of face brick is just inapplicable to external wall decorative material like this, because hanging basket seems improper for face brick construction from technology, and external wall decorative material is that the highrise building of coating or face brick is respectively to account for a part basically on the present construction market, and so the range of application of protective frame also is restricted.
The utility model content
Existing protective frame can not be applied to the deficiency of decoration of exterior wall construction stage and existing attachment type raise scaffold cost is too high, the shortcoming of complicated operation in order to overcome, it is a kind of with low cost, simple to operate that the utility model provides, and is applicable to the tool-type scaffold of building main body construction stage and decoration of exterior wall construction stage.
The technical scheme in the invention for solving the technical problem is: plant the tool-type scaffold, comprise support body, truss and wall-attaching equipment, support body is double, support body is connected on the truss, connect wall-attaching equipment on the truss, wall-attaching equipment is connected with building, with the tower crane is to promote power, it is characterized in that: described wall-attaching equipment is at least two places, and the everywhere can be born whole loads separately; Described wall-attaching equipment is connected with draw ring on being arranged on building; Described draw ring one end is embedded in the building, and the other end stretches out outside the building, forms closed-loop.
The utility model further improves: described support body is that special steel pipe and fastener assemble.
The utility model further improves: described wall-attaching equipment has at least one to adopt adjustable structure, guarantees that wall-attaching equipment is all stressed under user mode.
Useful technique effect of the present utility model is: adopt such structure, compare with attachment type raise scaffold, under with low cost, simple in structure, safe and reliable, the prerequisite that operability is good that has kept that original protective frame had, expanded the function of use of scaffold, make it not only can be applied to the building main body construction stage, can also be applied to the decoration of exterior wall construction stage, be that coating or face brick all are suitable for to outer wall material.If support body adopts special steel pipe and fastener to assemble, under the prerequisite of guaranteed strength, rigidity, alleviated support body weight and unit steel content greatly, whole construction market is reduced resource occupation have great economic worth and social value.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the enlarged drawing of I among Fig. 1;
Fig. 3 is the another kind of structural representation of the utility model draw ring;
Fig. 4 is the enlarged drawing of overlooking of Fig. 3;
Fig. 5 is an outer elevational schematic view of the present utility model.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further described.
As depicted in figs. 1 and 2, in the present embodiment, the support body 1 of scaffold is double, it highly is four and half building building height, efflux on the leger 11 and connect truss 2 by fastener 12, truss 2 is connected with wall-attaching equipment 3 by bearing pin 4, wall-attaching equipment 3 has two, the wall-attaching equipment 3 that wherein is positioned at higher floor is provided with adjustable drawbar 5, adjustable drawbar 5 two ends are passed through bearing pin/bolted splice respectively on truss 2 and wall-attaching equipment 3, adjustable drawbar 5 comprises support 53, have externally threaded adjusting rod 51 and adjusting rod 55, be welded with nut 52 and nut 54 on the support 53, it is identical that wherein adjusting rod 51 and nut 52, adjusting rod 55 and nut 54 are formed pitch respectively, the screw pair that rotation direction is opposite.Swinging mounting 53 just can be realized the length adjustment to adjustable drawbar 5, is positioned at that up and down the wall-attaching equipment 3 of floor all can be stressed thereby make.The building side bar on or shear wall be provided with draw ring 6, its optimum method is: before fluid concrete, with nuzzle steel mesh reinforcement in side bar or the shear wall of opening one end of ring, slot on the exterior sheathing of side bar or shear wall, blind end is stretched out, and extension elongation is about 50mm.Wall-attaching equipment 3 front ends are provided with alignment pin 31, and alignment pin 31 injects in the closed-loop of draw ring 6, and the beam supporting of wall-attaching equipment 3 forms being articulated and connected of wall-attaching equipment 3 and draw ring 6 on draw ring 6.Like this, bear the gravity and the working load of support body 1, give building 7 with whole Load Transfer by draw ring 5 by two-layer wall-attaching equipment 3 up and down.A draw ring 6 should be able to bear whole working load, and the diameter of draw ring is not less than 16mm usually.
Draw ring can also be Fig. 3 and another kind of form shown in Figure 4: nut 61 is embedded in the concrete of building 7, bolt 62 passes the connecting hole on the junction plate 64, be connected with nut 61, thereby junction plate 64 is fixed on the building 7, be welded with a closed-loop 63 on the junction plate.Can function as described above equally.But obviously operation does not have said method simple.
When scaffold promotes, connect truss 6 tops with wire rope one end, the other end connects the tower crane suspension hook, starts tower crane, and support body is up carried, and the alignment pin 31 on the wall-attaching equipment 3 is deviate from draw ring 6 automatically.After promoting one deck, the alignment pin 31 on two wall-attaching equipment 3 is aimed at draw ring 6 on the respective storey respectively, decline tower crane suspension hook injects in the draw rings 6 alignment pin 31, and the beam supporting of wall-attaching equipment 3 is on draw ring 6.Tighten up adjustable drawbar 5, make it stressed.Continue decline tower crane suspension hook, loosen fully, take off wire rope, promptly finished the lifting of a scaffold unit until wire rope.Along one week of building outline, arrange a plurality of such scaffold units, the gap is 300mm to about the 400mm between the adjacent cells, adopting close order safety net to seal covers, be connected with the vertical rod of adjacent scaffold unit respectively with several groups of (being generally five to six groups) steel pipes 8, fasteners 9 in addition, as shown in Figure 5, so that form an integral body, increase its integral rigidity around the scaffold unit of building one circle.These several groups of steel pipes 8 are removed before support body promotes, and promote the back that puts in place and recover.Be easy disassembly, steel pipe 8 at least one ends between the best described scaffold unit adopt a rotary buckle to be connected with vertical rod, like this, after removing being connected of steel pipe and other end fastener, rotary buckle one end still is connected with steel pipe, rotates about 90 degree around the active pin shaft of rotary buckle, forwards vertical direction to by horizontal direction, steel pipe 8 still is retained on the scaffold upright rod, makes things convenient for scaffold to promote and put in place back the connection.
In the building main body construction stage, the utility model is the same with protective frame, the every rising one deck of building body, with tower crane scaffold is risen to a last floor and fix, only need just can finish in 4-6 minute the lifting of a unit, it is simple to operate, envelope is covered tight, can well finish the task in main body construction stage, because support body changes double into, its rigidity has obtained enhancing, and in use support body is not easy distortion.
After finishing, the building main body construction stage enters into decoration of exterior wall construction stage sessions, four floor decoration of exterior wall operations when the scaffold place of having constructed, mention scaffold with tower crane this moment, it is fixing behind two floors once to descend, civil engineering workman on the scaffold on two floors the place at draw ring place carry out decoration of exterior wall and repair, because area is little, only about 0.005m 2Therefore will soon finish (usually not can above 20 minutes), scaffold can be moved again two floors and fixing after finishing downwards. 6-8 people just can move 4 floor down to the scaffold in a building in such one day, relative attached lift scaffold, the labour cost that its operation is spent only is about 1/4, running to bit time only is 1/2 effect, and its efficient has obviously improved greatly, and the use cost of scaffold also greatly reduces.
Because the fixed point of above-mentioned scaffold is positioned at the support body middle part, its eccentric moment is little, and two floors and building do not need tie point on top, therefore, coating application technology also can utilize this scaffold to finish, and the coating of such two floors once survives, and its quality is reliably guaranteed.Its underpart two floors do not form hole again because the draw ring area occupied is little on building, therefore mend behind the swabbing and can not form aberration on every side at this place, and quality also can effectively be guaranteed.Therefore, this scaffold not only can be used to carry out the face brick construction technology, also can carry out coating application technology.Compare protection rack special for building main body construction, under the situation that increases a little use cost (accounting for 1/4), its function is expanded, and range of application also increases greatly, total cost is compared the attached lift scaffold that possesses identical function and is only accounted for about 1/3, greatly reduces cost.
Steel pipe and the fastener of more than setting up the scaffold support body can be that the external diameter of using always is steel pipe and the common fastener of 48mm, wall thickness 3.5mm, and also can adopt external diameter is steel pipe (external diameter 36mm is for more preferably selecting) and the supporting with it fastener of 32-40mm, wall thickness 3.0mm.If adopt the latter, under the prerequisite of the intensity that has guaranteed support body, rigidity and stability, the weight of steel pipe and fastener is compared with the former and has been saved about 30%, greatly reduces the unit area steel quantity consumption of scaffold, and its economic benefit and social benefit are all very remarkable.

Claims (4)

1. tool-type scaffold, comprise support body (1), truss (2) and wall-attaching equipment (3), support body (1) is double, support body (1) is connected on the truss (2), truss (2) is gone up and is connected wall-attaching equipment (3), and wall-attaching equipment (3) is connected with building (7), is to promote power with the tower crane, it is characterized in that: described wall-attaching equipment (3) is at least two places, and the everywhere can be born whole loads separately; Described wall-attaching equipment (3) is connected with draw ring (6) on being arranged on building (7); Described draw ring (6) one ends are embedded in the building, and the other end stretches out outside the building, form closed-loop.
2. tool-type scaffold as claimed in claim 1 is characterized in that: described support body (1) assembles for special steel pipe and fastener.
3. tool-type scaffold as claimed in claim 2 is characterized in that: described outer diameter of steel pipes is 32 millimeters-40 millimeters.
4. tool-type scaffold as claimed in claim 1 is characterized in that: described wall-attaching equipment (3) has at least one to adopt adjustable structure (5), guarantees that wall-attaching equipment under user mode (3) is all stressed.
CNU2007201266690U 2007-08-07 2007-08-07 Tool type scaffold Expired - Fee Related CN201074402Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201266690U CN201074402Y (en) 2007-08-07 2007-08-07 Tool type scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201266690U CN201074402Y (en) 2007-08-07 2007-08-07 Tool type scaffold

Publications (1)

Publication Number Publication Date
CN201074402Y true CN201074402Y (en) 2008-06-18

Family

ID=39519665

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201266690U Expired - Fee Related CN201074402Y (en) 2007-08-07 2007-08-07 Tool type scaffold

Country Status (1)

Country Link
CN (1) CN201074402Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974973A (en) * 2010-11-08 2011-02-16 四川华山建筑有限公司 Two-way stress base section of attached lifting scaffold
CN102322136A (en) * 2011-07-26 2012-01-18 贺昌义 Full-module-assembly adhesion type lifting scaffold
CN103195234A (en) * 2012-01-10 2013-07-10 程亮然 Balancing basket
CN104372929A (en) * 2013-08-13 2015-02-25 姚磊 Wind load resisting device of attaching-type lifting scaffold

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974973A (en) * 2010-11-08 2011-02-16 四川华山建筑有限公司 Two-way stress base section of attached lifting scaffold
CN102322136A (en) * 2011-07-26 2012-01-18 贺昌义 Full-module-assembly adhesion type lifting scaffold
CN102322136B (en) * 2011-07-26 2014-03-12 贺昌义 Full-module-assembly adhesion type lifting scaffold
CN103195234A (en) * 2012-01-10 2013-07-10 程亮然 Balancing basket
CN104372929A (en) * 2013-08-13 2015-02-25 姚磊 Wind load resisting device of attaching-type lifting scaffold

Similar Documents

Publication Publication Date Title
CN100480481C (en) Quadrangular pyramid sphere net case falsework-free constructing and mounting method and hoisting machine tool
CN201826525U (en) Climbing shuttering system device for buildings
CN106115500B (en) A kind of high-rise building is special, and tearing formula roofing open hangs and tears open certainly method certainly
CN103526949A (en) Lifting and slipping device for wall-attached vertical structure and construction method thereof
CN201074402Y (en) Tool type scaffold
CN112302329B (en) Bearing frame for cantilever frame beam and mounting method thereof
CN101892736A (en) High altitude moving hanging basket construction method
CN205577383U (en) Attached lifting scaffold
CN108894329B (en) Overhanging type pipe truss and mounting method of supporting rod thereof
CN113291973A (en) Assembled building construction high accuracy hoist
CN107338965A (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN101701492A (en) Guide rail frame type adhering lifting scaffold
CN208856718U (en) A kind of saddle climbing type workbench
CN2832994Y (en) Dedicated protection frame for construction of main structure
CN201334770Y (en) Wall-attached supporting seat
CN106320699A (en) Quick disassembling and assembling method for truss type formwork bracket system
CN107313597A (en) Modularization ready-package discharging platform for assembled architecture
CN108483230A (en) A kind of the sunpender regulating mechanism and adjusting method of thermal power plant's suspention boiler
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN210288145U (en) Straight beam type hanging basket
CN2844304Y (en) Special protective bracing for construction of main building body
CN207110500U (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN208218198U (en) A kind of sunpender regulating mechanism of thermal power plant's suspention boiler
CN208858136U (en) Attached lifting scaffold lifting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Yao Kanghua

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Yao Kanghua

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080618

Termination date: 20100807