CN201074328Y - Pedestal pile for building foundation construction - Google Patents

Pedestal pile for building foundation construction Download PDF

Info

Publication number
CN201074328Y
CN201074328Y CNU2007200132538U CN200720013253U CN201074328Y CN 201074328 Y CN201074328 Y CN 201074328Y CN U2007200132538 U CNU2007200132538 U CN U2007200132538U CN 200720013253 U CN200720013253 U CN 200720013253U CN 201074328 Y CN201074328 Y CN 201074328Y
Authority
CN
China
Prior art keywords
pile
pile body
cast
concrete base
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200132538U
Other languages
Chinese (zh)
Inventor
王国奋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200132538U priority Critical patent/CN201074328Y/en
Application granted granted Critical
Publication of CN201074328Y publication Critical patent/CN201074328Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an enlarged toe pile for buildings, in particular to an enlarged toe pile which is adaptable to building foundation construction of high-rise buildings. The utility model is structurally formed by integrally anchoring and connecting an upper segment precast prestessed pile body (4) and a lower segment precast pile body (3) via an upper cast-in-situ concrete base (2), wherein the lower end of the lower segment precast pile body (3) is provided with a cast-in-situ concrete base (1), the centers of the upper cast-in-situ concrete base (2) and the cast-in-situ concrete base (1) are coaxially same as the centers of the lower segment precast pile body (3) and the upper segment precast prestessed pile body (4), and the cross sections of the upper segment precast prestessed pile body (4) and the lower segment precast pile body (3) are round. The utility model can be adapted widely, utilization rate of strength of materials is obviously increased, the bearing ability of a single pile is higher, and the design desired effect immersed-tube enlarged toe pile is easy to be achieved, thereby the utility model has the advantages of simple structure, low costs and convenient construction.

Description

The construction foundation working expanded bore pile
Affiliated technical field
The utility model relates to a kind of expanded bore pile for building, particularly relates to a kind of construction foundation working expanded bore pile that is applicable to highrise building.
Background technology
The pile foundation engineering that is used for the high building lot of highrise building and requirement for bearing capacity at present generally adopts three kinds of ram-expanded pile, preformed pile and large diameter bored piles.What wherein be most widely used is immersed tube bored expanded bore pile, and this pile body is a cast-in-situ steel concrete, and pile crown is prefabricated; But because the soil property age difference that the earth's crust forms, soft foundation is soft usually with the increase of the crust layer degree of depth, hardpan is alternately state, like this when continuous piling construction, after execute stake and can produce extruding soil layer, the stake that will have influence on perfusion formerly and not solidify fully as yet, especially especially serious at the intersection of weak soil layer and hardpan, broken pile often appears, necking, thereby cause having approximately can't meet the quality requirement of tube-sinking cast-in-situ pile about 20%, force the designer to reduce the standard of bearing capacity of single pile, cause down stake to be gathered, cause soil body gross distortion, even jeopardize the quality of pile body; This another shortcoming is that bearing capacity is low, be to increase bearing capacity, the general way that adopts at the bottom of after irritating concrete cast pile body, adding companding, but because of its utilization add companding at the bottom of mode make the uncertain and standard of its shape size.The patent No. is 200620092806.9 to have solved above-mentioned technical problem, but in actual application, between adjacent pile body, be provided with joint bar owing to it, cause the cost of expanded bore pile to increase, and construction is difficulty very, though it has effect preferably, in actual application,, cost height, constructional difficulties be restricted owing to making its popularization.
The utility model content
The problem that the utility model exists at prior art, and provide a kind of scope of application wide, obviously improve strength of materials utilization rate, with low cost, the construction foundation working expanded bore pile of easy construction.
In order to solve the problems of the technologies described above, the utility model is achieved in that the construction foundation working expanded bore pile, it is to be made of following structure: by last Cast-in-place concrete base precast prestressed pile body of epimere and the anchoring of hypomere precast pile are fused, the lower end of hypomere precast pile is provided with the Cast-in-place concrete base, the center of Cast-in-place concrete base and Cast-in-place concrete base is coaxial with hypomere precast pile and the precast prestressed pile body of epimere center, and the cross section of precast prestressed pile body of epimere and hypomere precast pile is circular.
Advantage of the present utility model and effect are as follows:
The utility model adopts two joint pile bodies and two expansion bases, because upper bed-plate produces good influence to the performance of lower bottom base bearing capacity, being provided with the performance of each section pile body frictional resistance of each base is favourable, make stake be in the state work down of economical rationality all the time, obviously improve the bearing capacity of single pile and the utilization rate of the strength of materials, reach the Expected Results of design easily, satisfy the needs of construction work better, be suitable for the Tall Building Foundation construction simultaneously.The utility model satisfies the needs of construction work better, and the utility model is simple in structure, and is with low cost, is convenient to construction.
Description of drawings
Fig. 1 is a main TV structure schematic diagram of the present utility model.
Among the figure: 1, Cast-in-place concrete base; 2, go up the Cast-in-place concrete base; 3, hypomere precast pile; 4, the precast prestressed pile body of epimere.
The specific embodiment
Embodiment of the present utility model is described in detail in conjunction with the accompanying drawings, but protection domain of the present utility model is not limit by embodiment.
As shown in Figure 1 be main TV structure schematic diagram of the present utility model, by last Cast-in-place concrete base 2 precast prestressed pile body 4 of epimere and 3 anchorings of hypomere precast pile are fused, the lower end of hypomere precast pile 3 is provided with Cast-in-place concrete base 1, the center of Cast-in-place concrete base 2 and Cast-in-place concrete base 1 is coaxial with hypomere precast pile 3 and the precast prestressed pile body of epimere 4 centers, and the cross section of precast prestressed pile body 4 of epimere and hypomere precast pile 3 is circular.The job practices of present embodiment can be constructed according to common process.

Claims (1)

1. construction foundation working expanded bore pile, it is characterized in that it is to be made of following structure: precast prestressed pile body of epimere (4) and hypomere precast pile (3) anchoring are fused by last Cast-in-place concrete base (2), the lower end of hypomere precast pile (3) is provided with Cast-in-place concrete base (1), the center of Cast-in-place concrete base (2) and Cast-in-place concrete base (1) is coaxial with hypomere precast pile (3) and the precast prestressed pile body of epimere (4) center, and the cross section of precast prestressed pile body of epimere (4) and hypomere precast pile (3) is circular.
CNU2007200132538U 2007-07-12 2007-07-12 Pedestal pile for building foundation construction Expired - Fee Related CN201074328Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200132538U CN201074328Y (en) 2007-07-12 2007-07-12 Pedestal pile for building foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200132538U CN201074328Y (en) 2007-07-12 2007-07-12 Pedestal pile for building foundation construction

Publications (1)

Publication Number Publication Date
CN201074328Y true CN201074328Y (en) 2008-06-18

Family

ID=39519591

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200132538U Expired - Fee Related CN201074328Y (en) 2007-07-12 2007-07-12 Pedestal pile for building foundation construction

Country Status (1)

Country Link
CN (1) CN201074328Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476432A (en) * 2017-08-23 2017-12-15 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated reinforced concrete column connecting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476432A (en) * 2017-08-23 2017-12-15 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated reinforced concrete column connecting structure
CN107476432B (en) * 2017-08-23 2024-05-03 上海市政工程设计研究总院(集团)有限公司 Prefabricated reinforced concrete upright post connection structure

Similar Documents

Publication Publication Date Title
CN200946269Y (en) Sinking pipe perfusion bottom-expanding pile
CN201074328Y (en) Pedestal pile for building foundation construction
CN201074325Y (en) Pedestal pile suitable for foundation construction of high-rise buildings
CN201074324Y (en) High-rise building club-footed pile
CN200946270Y (en) Sinking pipe bottom-expanding pile
CN201074327Y (en) Pipe sinking prefabricated pedestal pile suitable for high-rise buildings
CN201074322Y (en) Sinking pipe pouring pedestal pile
CN201074329Y (en) Sinking pipe pedestal pile
CN201087410Y (en) Pedestal pile suitable for high-rise building foundation construction
CN201074326Y (en) Pipe-sinking pouring pedestal pile
CN201087400Y (en) High bearing ability immersed tube filling pedestal pile
CN201137065Y (en) Impact force resistant pipe caisson prefabricated club-footed pile for high-rise building
CN201176587Y (en) Club-footed pile for foundation construction
CN201087408Y (en) Pedestal pile for building foundation construction
CN201087412Y (en) Immersed tube prefabricated pedestal pile
CN201087407Y (en) Anti-impact pedestal pile for building foundation construction
CN200946272Y (en) Bottom-expanding pile for base construction of architecture
CN201095747Y (en) Building foundation filling pile
CN201087346Y (en) Anti-impact immersed tube prefabricated pedestal pile
CN201021498Y (en) A sunk pipe perfusion bottom expansion stake for building
CN201089908Y (en) Sink pipe prefabricated club-footed pile for high-rise building
CN201137112Y (en) Impact force resistant architecture base club-footed pile
CN200955148Y (en) Sink-pipe prefabricated club-footed pile suitable for high-rise building
CN201095765Y (en) Immersed tube filling pile
CN201087403Y (en) Anti-impact immersed tube filling pedestal pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080618