CN201050365Y - Petroleum gas drilling and sampling analyzer - Google Patents

Petroleum gas drilling and sampling analyzer Download PDF

Info

Publication number
CN201050365Y
CN201050365Y CNU2007201244831U CN200720124483U CN201050365Y CN 201050365 Y CN201050365 Y CN 201050365Y CN U2007201244831 U CNU2007201244831 U CN U2007201244831U CN 200720124483 U CN200720124483 U CN 200720124483U CN 201050365 Y CN201050365 Y CN 201050365Y
Authority
CN
China
Prior art keywords
dust
filter box
cloth bag
petroleum gas
gas drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201244831U
Other languages
Chinese (zh)
Inventor
朱根庆
刘光季
李春山
朱直箐
肖志
孙冰涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING AONENGRUIKE PETROLEUM TECHNOLOGY Co Ltd
Original Assignee
CHONGQING AONENGRUIKE PETROLEUM TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING AONENGRUIKE PETROLEUM TECHNOLOGY Co Ltd filed Critical CHONGQING AONENGRUIKE PETROLEUM TECHNOLOGY Co Ltd
Priority to CNU2007201244831U priority Critical patent/CN201050365Y/en
Application granted granted Critical
Publication of CN201050365Y publication Critical patent/CN201050365Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses an oil and gas drilling sampling analyser, which is characterized in that the utility model comprises a dust funnel (1) in which the upper end is respectively provided with a sealed cover (2) that the lower end surface is provided with a bag stent (3). The bag stent (3) is covered with a bag partitioned a cavity of the dust funnel (1) into an inner cavity (4) and an outer cavity (5). The sealed cover (2) is provided with an outgoing tube (6) so that the inner cavity (4) can be communicated with the outside. The side wall of the dust funnel (1) is provided with a sampling tube (7) so that the outer cavity (5) can be communicated with the outside. The utility model has the significant effects that the pollution for the sampling gas is avoided and the detection accuracy of gas can be improved. Moreover, the on line real-time detection for a variety of gas parameters can be proceeded.

Description

Petroleum gas drilling well sampling analysis device
Technical field
The utility model belongs to gas sampling and analytical equipment, relates in particular to the gas on-site sampling in the oil drilling technology, the petroleum gas drilling well sampling analysis device of analyzing.
Background technology
A large amount of gas drilling new technologies that adopt in oil drilling at present, the maximum difficult point of this drilling technology is safety guarantee monitoring method and equipment, promptly toxic and harmful returns out the method and apparatus on the face of land under the monitor well.The landwaste dust that present domestic employing gas monitoring method all needed water filtering drilling well to return out, and guide the gas in the drilling well into the ground collection and detect, and when crossing water filter dirt, the gas that thereupon returns out also will partly or entirely be dissolved in the water, especially gas in the well such as hydrogen sulfide, must filter water-soluble the separating of dirt by the time just separates out after saturated, and the saturated solution of gases such as dissolved hydrogen sulfide has extremely strong corrosivity, force and in observation process, constantly change water, make it to form vicious circle, do not reach the purpose of pernicious gas and fuel gas under the monitor well at all, be difficult to guarantee drilling safety.
Its shortcoming is: adopted water filter dirt mode to detect, and both influenced the accuracy of detection of gas, and caused environment pollution again easily, and can't accomplish the real-time online safety detection, and can't detect gas temperature/humidity index.
The utility model content
The purpose of this utility model provides a kind of petroleum gas drilling well sampling analysis device, does not need water filter dirt mode to detect, and can improve the real-time accuracy of detection of gas, avoids environment pollution, can also detect gas temperature/humidity index.
For achieving the above object, a kind of petroleum gas drilling well sampling analysis device described in the utility model, its key is: comprise Dust filter box, this Dust filter box upper end is respectively arranged with seal cover board, described seal cover board lower surface is equipped with the cloth bag bracket, be covered with cloth bag on this cloth bag bracket, this cloth bag is divided into inner chamber and exocoel with the chamber of Dust filter box; Described seal cover board is provided with out the sample pipe, and this goes out the sample pipe and inserts from the top down in the inner chamber, and described inner chamber is communicated with the external world; The laterally inserted probe tube of the sidewall of described Dust filter box, this probe tube make described exocoel communicate with the external world.
Described Dust filter box cross section is circular, and described probe tube stretches into described exocoel along Dust filter box sidewall tangential direction.
This uses entad sand setting principle of novel employing air whirl.Mine gas enters exocoel along Dust filter box through probe tube by tangential direction, forms eddy current in exocoel, and with the landwaste powder that the carries precipitation that descends naturally in whirlwind, the dustproof cloth bag on the cloth bag bracket intercepts dust outside inner chamber, protects out the cleaning of sample pipe.The cotton antistatic cloth that dustproof cloth bag adopts the wire embedding to knit adheres to reduce dust to greatest extent.
Also be provided with the dust discharge air inlet pipe on the described seal cover board, this dust discharge air inlet pipe makes described inner chamber communicate with the external world, and described Dust filter box lower end is provided with dust outlet tube.
On the described dust discharge air inlet pipe dust discharge admission valve is installed, the dirt valve is installed out on the described dust outlet tube, on the described probe tube sample valve is installed.
The dust overheap is closed sample valve in Dust filter box, opens the dust discharge admission valve and goes out the dirt valve, and the dust discharge air inlet pipe is introduced cleaned air dust is blown into dust outlet tube, by dust outlet tube dust is got rid of.
Also have up big and down small bellmouth on the described seal cover board, be installed with handle in this bellmouth, this handle wall and taper hole wall suit, and handle end hangs described cloth bag bracket.
Be piston-like between handle and bellmouth and cooperate, can manually extract cloth bag bracket and dustproof cloth bag that the handle shake is hung, to shake out the accompanying dust of cloth bag external surface.
On the described probe tube pressure sensor is installed.
Utilize the laying dust in two kinds of dust removing funnels of pressure sensor signal control eliminating.When the termination of pumping of sample gas drilling well intermittently, pressure sensor provides and stops boring signal, when probe tube upward pressure signal is lower than 5KPa, dust discharge admission valve and go out the dirt valve and open, sample valve cuts out, and forms the dust discharge passage.At this moment, compressed air is blown into Dust filter box by the dust discharge air inlet pipe, and drains through the dust outlet tube of Dust filter box bottom.When probe tube upward pressure signal during more than or equal to 5KPa, pressure sensor provides and stops boring signal, dust discharge admission valve and go out the dirt valve and close, and sample valve is opened, the device sampling work.
Remarkable result of the present utility model is: adopt dry type air blowing mode to filter dirt, avoid pollution to sample gas, can improve the accuracy of detection of gas, avoid environment pollution, can be for the down-hole: parameters such as gas pressure, gas flow, gas temperature, gas humidity, hydrogen sulfide relative amount, hydrocarbon gas relative amount, oxygen relative amount, carbon monoxide relative amount, carbon dioxide relative amount, hydrocarbon gas concentration are carried out online in real time and are detected.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is a three-dimensional structure diagram of the present utility model.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
As shown in Figure 1,
A kind of petroleum gas drilling well sampling analysis device, comprise Dust filter box 1, this Dust filter box 1 upper end is respectively arranged with seal cover board 2, described seal cover board 2 lower surfaces are equipped with cloth bag bracket 3, be covered with cloth bag on this cloth bag bracket 3, cloth bag is divided into inner chamber 4 and exocoel 5 with the chamber of Dust filter box 1, and described seal cover board 2 is provided with out sample pipe 6, this goes out sample pipe 6 and inserts from the top down in the inner chamber 4, and described inner chamber 4 is communicated with the external world; The laterally inserted probe tube 7 of the sidewall of described Dust filter box 1, this probe tube 7 make described exocoel 5 communicate with the external world.
Described Dust filter box 1 cross section is circular, and described probe tube 7 stretches into described exocoel 5 along Dust filter box 1 sidewall tangential direction.
This uses entad sand setting principle of novel employing air whirl.Mine gas enters exocoel 5 along Dust filter box 1 through probe tube 7 by tangential direction; in exocoel 5, form eddy current; with landwaste powder decline precipitation naturally in whirlwind of carrying, the dustproof cloth bag on the cloth bag bracket 3 intercepts dust outside inner chamber 4, protects out the cleaning of sample pipe 6.The cotton antistatic cloth that dustproof cloth bag adopts the wire embedding to knit adheres to reduce dust to greatest extent.
Also be provided with dust discharge air inlet pipe 8 on the described seal cover board 2, this dust discharge air inlet pipe 8 makes described inner chamber 4 communicate with the external world, and described Dust filter box 1 lower end is provided with dust outlet tube 9.
Dust discharge admission valve 8a is installed on the described dust discharge air inlet pipe 8, dirt valve 9a is installed out on the described dust outlet tube 9, on the described probe tube 7 sample valve 7a is installed.
Dust overheap in Dust filter box 1 is closed sample valve 7a, opens dust discharge admission valve 8a and goes out dirt valve 9a, and dust discharge air inlet pipe 8 is introduced cleaned air dust is blown into dust outlet tube 9, by dust outlet tube 9 dust is got rid of.
Also have up big and down small bellmouth on the described seal cover board 2, be installed with handle 10 in this bellmouth, these handle 10 walls and taper hole wall suit, the described cloth bag bracket 3 of handle 10 terminal suspensions.
Be piston-like between handle 10 and bellmouth and cooperate, can manually extract cloth bag bracket 3 and dustproof cloth bag that handle 10 shakes are hung, to shake out the accompanying dust of cloth bag external surface.
On the described probe tube 7 pressure sensor 15 is installed.
Its working condition is as follows:
Mine gas enters exocoel 5 along Dust filter box 1 through probe tube 7 by tangential direction; in exocoel 5, form eddy current; with landwaste powder decline precipitation naturally in whirlwind of carrying, the dustproof cloth bag on the cloth bag bracket 3 intercepts dust outside inner chamber 4, protects out the cleaning of sample pipe 6.

Claims (6)

1. petroleum gas drilling well sampling analysis device, it is characterized in that: comprise Dust filter box (1), this Dust filter box (1) upper end is respectively arranged with seal cover board (2), described seal cover board (2) lower surface is equipped with cloth bag bracket (3), be covered with cloth bag on this cloth bag bracket (3), this cloth bag is divided into inner chamber (4) and exocoel (5) with the chamber of Dust filter box (1); Described seal cover board (2) is provided with out sample pipe (6), and this goes out sample pipe (6) and inserts from the top down in the inner chamber (4), and described inner chamber (4) is communicated with the external world; The laterally inserted probe tube of sidewall (7) of described Dust filter box (1), this probe tube (7) make described exocoel (5) communicate with the external world.
2. petroleum gas drilling well sampling analysis device according to claim 1 is characterized in that: described Dust filter box (1) cross section is for circular, and described probe tube (7) stretches into described exocoel (5) along Dust filter box (1) sidewall tangential direction.
3. petroleum gas drilling well sampling analysis device according to claim 1, it is characterized in that: also be provided with dust discharge air inlet pipe (8) on the described seal cover board (2), this dust discharge air inlet pipe (8) makes described inner chamber (4) communicate with the external world, and described Dust filter box (1) lower end is provided with dust outlet tube (9).
4. according to claim 1 or 3 described petroleum gas drilling well sampling analysis devices, it is characterized in that: dust discharge admission valve (8a) is installed on the described dust discharge air inlet pipe (8), dirt air valve (9a) is installed out on the described dust outlet tube (9), sample valve (7a) is installed on the described probe tube (7).
5. petroleum gas drilling well sampling analysis device according to claim 1, it is characterized in that: described seal cover board also has up big and down small bellmouth on (2), be installed with handle (10) in this bellmouth, this handle (10) wall and taper hole wall suit, the terminal described cloth bag bracket (3) that hangs of handle (10).
6. petroleum gas drilling well sampling analysis device according to claim 1 is characterized in that: pressure sensor (15) is installed on the described probe tube (7).
CNU2007201244831U 2007-06-12 2007-06-12 Petroleum gas drilling and sampling analyzer Expired - Fee Related CN201050365Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201244831U CN201050365Y (en) 2007-06-12 2007-06-12 Petroleum gas drilling and sampling analyzer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201244831U CN201050365Y (en) 2007-06-12 2007-06-12 Petroleum gas drilling and sampling analyzer

Publications (1)

Publication Number Publication Date
CN201050365Y true CN201050365Y (en) 2008-04-23

Family

ID=39336849

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201244831U Expired - Fee Related CN201050365Y (en) 2007-06-12 2007-06-12 Petroleum gas drilling and sampling analyzer

Country Status (1)

Country Link
CN (1) CN201050365Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102140914B (en) * 2010-01-28 2013-12-11 东北石油大学 Underground debris sampler
CN105629318A (en) * 2015-12-30 2016-06-01 中国石油天然气股份有限公司 Measurement system for natural gamma radioactivity of ground rock debris

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102140914B (en) * 2010-01-28 2013-12-11 东北石油大学 Underground debris sampler
CN105629318A (en) * 2015-12-30 2016-06-01 中国石油天然气股份有限公司 Measurement system for natural gamma radioactivity of ground rock debris
CN105629318B (en) * 2015-12-30 2018-01-05 中国石油天然气股份有限公司 Ground landwaste natural gamma radioactivity measuring system

Similar Documents

Publication Publication Date Title
CN109001417A (en) A kind of getting working face operation process dust analysis mode pilot system
CN205620407U (en) Coke oven tedge smoke and dust gas sampling analysis device
CN212621742U (en) Portable soil gas sampling device
CN201050365Y (en) Petroleum gas drilling and sampling analyzer
CN105092779B (en) Air foam displacement of reservoir oil output gas on-line measuring device and process
CN201522485U (en) Gas drainage detecting device and dewatering device thereof
CN112557621A (en) Gas composition monitoring and alarming device
CN109085307A (en) A kind of refuse landfill gas multi-parameter collection and detection device
CN212780019U (en) Rock core collection device
CN207131389U (en) Separate type Samper for oil well
CN206515245U (en) A kind of industrial flammable gas-detecting alarm device
CN105300742A (en) Gas sampling and analyzing device
CN206074314U (en) A kind of multifunctional compressed air sampling detecting device
CN210604056U (en) Soil gas acquisition and detection device
CN204082135U (en) Extraction borehole sealing quality detector
CN110702818A (en) Logging device
CN201963304U (en) Secondary separating gas drilling sample analyzer
CN216900354U (en) Gaseous normal position monitoring facilities of VOC in soil
CN211122701U (en) Logging device
CN204142527U (en) A kind of gas sampling and analytical equipment
CN201050366Y (en) Petroleum foam drilling and sampling analyzer
CN208847708U (en) A kind of refuse landfill gas multi-parameter collection and detection device
CN201924921U (en) Passive foam drilling sample analyzer
CN114354738A (en) In-situ monitoring equipment and method for VOC gas in soil
CN209606191U (en) A kind of adsorption condensing sampling purification device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080423

Termination date: 20120612