CN201047167Y - Draw rod for building - Google Patents

Draw rod for building Download PDF

Info

Publication number
CN201047167Y
CN201047167Y CNU2007200796740U CN200720079674U CN201047167Y CN 201047167 Y CN201047167 Y CN 201047167Y CN U2007200796740 U CNU2007200796740 U CN U2007200796740U CN 200720079674 U CN200720079674 U CN 200720079674U CN 201047167 Y CN201047167 Y CN 201047167Y
Authority
CN
China
Prior art keywords
screw rod
pull bar
coupling nut
building
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200796740U
Other languages
Chinese (zh)
Inventor
谢学明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200796740U priority Critical patent/CN201047167Y/en
Application granted granted Critical
Publication of CN201047167Y publication Critical patent/CN201047167Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a construction pull rod, in particular to a construction project pull rod used for preventing from molding board explosion when in depositing concrete. The construction pull rod is provided with a screw, and is characterized in that: a connecting screw cap is fixedly arranged at one end of the screw; a connecting screw cap is provided with internal thread; the connecting cap has a round ring-shaped transverse section; the other end of the screw is a free end. The construction pull rod of the utility model is convenient to be unloaded, installed and reused, thus avoiding the waste of metal resources and reducing construction cost.

Description

Pull bar for building
Technical field
The utility model relates to the quick-fried mould of template when preventing fluid concrete in a kind of pull bar for building, the especially construction work and the pull bar for building that uses.
Background technology
Usually in the concreting process of building main body construction such as shear wall or column, usually can produce the quick-fried mould of template, cause the concreting failure because of concrete pressure is excessive.Existing pull bar for building is widely used in the building engineering construction place, usually has the structure that monolithic screw rod or two screw rod middle flat steel bar are connected as a single entity, and restriction protrusion is set on pull bar, in template that concreting adopted not simultaneously, the pull bar that uses can be different, as need on the big mould of the common appellation of building trade, use the time, generally just adopt monolithic screw rod pull bar; In the time need using on the punching block of the common appellation of building trade, the pull bar that just adopts two screw rod middle flat steel bar to be connected as a single entity can certainly adopt monolithic screw rod pull bar usually, just not too convenient fixedly punching block.During use, pull bar passes template and the two ends screw rod is exposed to outside the template, utilize the restriction protrusion qualification template position on the pull bar to determine concreting thickness, utilize the two ends screw rod to be connected common fixed form again with the objects such as steel pipe in the external world, being about to template clamps, in order to template is fixedly prevented in the concreting process of shear wall or column, produce the quick-fried mould of template because of concrete pressure is excessive, speed of application and workmanship have been guaranteed simultaneously, for this reason, builing industry is extensive use of pull bar as the building auxiliary material, and use amount is very big.But, existing pull bar is a monolithic construction, after fixed form and concreting, the centre of pull bar can be fixed in the concrete that solidifies along with concreting for one section, the screw rod that after removing template, also needs to excise the pull bar two ends next processes such as decoration of just plastering, and then finish the integral construction of shear wall or column, the pull bar screw rod of excision can not utilize once more and become waste material and caused the metals resources waste.The metal material resource is very nervous in building trade, and waste material increases makes construction cost high, has correspondingly brought no small burden to building trade, and therefore, there is defective in existing pull bar, need improve.
The utility model content
The purpose of this utility model is to improve on the structure of existing pull bar, and a kind of pull bar for building of avoiding the metals resources waste, reducing construction cost is provided.
Pull bar for building of the present utility model has screw rod, it is characterized in that described screw rod one end is set with coupling nut, and described coupling nut has internal thread, and the cross section of described coupling nut is an annular, and the described screw rod other end is a free end.One end of screw rod described in the utility model is set with coupling nut, both can be that described screw rod one end is directly fixedlyed connected with coupling nut, also can be that described screw rod one end is fixedlyed connected with coupling nut indirectly.
Screw rod described in the utility model is that the existing machinery field has externally threaded cylinder, described screw rod can be that metal material such as steel or iron or copper constitute, certainly in case of necessity, also can be to constitute by other material that reaches the hardness requirement, as the high molecular polymerization plastics etc., or even metal and the common complex screw that constitutes of plastic or other material.
Coupling nut described in the utility model is that the cross section is the coupling nut of annular, it is the coupling nut that outer wall is smooth and periphery is rounded, described coupling nut can be that metal material such as steel or iron or copper constitute, certainly in case of necessity, also can be to constitute by other material that reaches the hardness requirement, as the high molecular polymerization plastics etc., or even metal and the common compound coupling nut that constitutes of plastic or other material.For more firm fixed form, can fixedly install restriction protrusion on the coupling nut of the present utility model, certainly, also can allow described restriction protrusion serve as in case of necessity by the extension of coupling nut.
When using pull bar of the present utility model, can earlier coupling nut be fixedlyed connected by screw thread with extraneous connecting screw rod, promptly use two identical pull bars simultaneously, allow the coupling nut on two pull bars be separately fixed at extraneous connecting screw rod two ends, form and the existing building identical integral structure of pull bar, the termination that allows screw rod on the pull bar serve as extraneous connecting screw rod, the end face that described coupling nut is positioned at screw rod serves as restriction protrusion at this, the effect that pull bar played in clamping template and the concreting process is identical with pull bar with existing building, repeats no more herein.What should be specified is, after concreting is finished and is allowed template break away from, pull bar of the present utility model can by coupling nut be fixed on the extraneous connecting screw rod that solidifies in the concrete and separate, promptly treat rotating rod after the concrete setting, the rounded coupling nut of periphery on the pull bar can be rotated in the concrete that solidifies, and the internal thread that has by coupling nut is realized separating with extraneous connecting screw rod, and then next process such as the decoration of can plastering, finish the integral construction of shear wall or column, in this process, do not need to excise the pull bar screw rod, be that the screw rod that has on the pull bar separates with extraneous connecting screw rod in the lump with the coupling nut on the pull bar, and the pull bar of separating can be once more be connected with other extraneous connecting screw rod, in building engineering construction, using repeatedly, can not become the waste material that can not utilize once more, and then saved metals resources and avoided waste, allow the building engineering construction cost reduce.
For fixedly punching block adaptation concreting construction more easily, can also be provided with flat steel bar on the pull bar in the utility model, described flat steel bar is between screw rod and coupling nut, described flat steel bar one end is fixedlyed connected with coupling nut, and the described flat steel bar other end is fixedlyed connected with screw rod one end.Flat steel bar described here is meant promptly that between screw rod and coupling nut above-mentioned screw rod one end fixedlys connected with coupling nut indirectly.The described flat steel bar other end is fixedlyed connected with screw rod one end, can be to fixedly connected with screw rod one end face in the flat steel bar other end, also can be to fixedly connected with screw rod one end side surface in flat steel bar other end side.
Compared with the aforementioned existing similar products, pull bar for building of the present utility model can dismantle easily and installation utilizes once more, has avoided the metals resources waste, has reduced construction cost.
Content of the present utility model further illustrates with the following Examples, but content of the present utility model is not limited only to content related among the embodiment.
Description of drawings
Fig. 1 is the structural representation of pull bar for building among the embodiment 1.
Fig. 2 is the A-A sectional drawing of Fig. 1.
Fig. 3 is the user mode figure of pull bar for building among the embodiment 1.
Fig. 4 is the structural representation of pull bar for building among the embodiment 2.
Fig. 5 is the upward view of Fig. 4.
The specific embodiment
Embodiment 1: shown in Fig. 1~3, pull bar for building in the present embodiment has screw rod 1, it is characterized in that described screw rod one end 2 is set with coupling nut 3, and described coupling nut 3 has internal thread 4, the cross section of described coupling nut 3 is an annular, and the described screw rod other end 5 is a free end.
Screw rod 1 in the present embodiment pull bar and coupling nut 3 are steel and make.
When using the pull bar for building in the present embodiment, earlier the connecting screw rod 6 in coupling nut 3 and the external world is fixedlyed connected by screw thread, use two identical pull bars in the present embodiment simultaneously, allow the coupling nut on two pull bars be separately fixed at extraneous connecting screw rod 6 two ends, form and the existing building identical integral structure of pull bar, the end face 7 that described coupling nut is positioned at screw rod serves as restriction protrusion at this, the effect that pull bar played in clamping template and the concreting process is identical with pull bar with existing building, repeats no more herein.What should be specified is, after concreting is finished and is allowed template break away from, pull bar in the present embodiment can by coupling nut 3 be fixed on the extraneous connecting screw rod 6 that solidifies in the concrete and separate, promptly treat rotating rod after the concrete setting, allow the rounded coupling nut 3 of periphery on the pull bar in the concrete that solidifies, rotate, and the internal thread 4 that has by coupling nut is realized separating with extraneous connecting screw rod 6, and next process such as the decoration of plastering, finish the integral construction of shear wall or column, in this process, do not need to excise the screw rod 1 of pull bar, be that the screw rod 1 that has on the pull bar separates with extraneous connecting screw rod 6 in the lump with the coupling nut on the pull bar 3, and the pull bar of separating can be once more be connected with other extraneous connecting screw rod, in building engineering construction, using repeatedly, can not become the waste material that can not utilize once more, and then saved metals resources and avoided waste, allow the building engineering construction cost reduce.
Embodiment 2: shown in Fig. 4~5, present embodiment is similar to embodiment 1, the pull bar for building that different is in the present embodiment also is provided with flat steel bar 8, described flat steel bar 8 is between screw rod 1 and coupling nut 3, described flat steel bar 8 one ends are fixedlyed connected with coupling nut 3, fixedly connected with screw rod 1 one end side surface in described flat steel bar 8 other end sides.

Claims (2)

1. a pull bar for building has screw rod, it is characterized in that described screw rod one end is set with coupling nut, and described coupling nut has internal thread, and the cross section of described coupling nut is an annular, and the described screw rod other end is a free end.
2. pull bar for building as claimed in claim 1 is characterized in that also being provided with flat steel bar, and described flat steel bar is between screw rod and coupling nut, and described flat steel bar one end is fixedlyed connected with coupling nut, and the described flat steel bar other end is fixedlyed connected with screw rod one end.
CNU2007200796740U 2007-05-25 2007-05-25 Draw rod for building Expired - Fee Related CN201047167Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200796740U CN201047167Y (en) 2007-05-25 2007-05-25 Draw rod for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200796740U CN201047167Y (en) 2007-05-25 2007-05-25 Draw rod for building

Publications (1)

Publication Number Publication Date
CN201047167Y true CN201047167Y (en) 2008-04-16

Family

ID=39299747

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200796740U Expired - Fee Related CN201047167Y (en) 2007-05-25 2007-05-25 Draw rod for building

Country Status (1)

Country Link
CN (1) CN201047167Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080523A (en) * 2019-06-05 2019-08-02 重庆大学 A kind of civil engineering concrete cast-in-situ side template die drawing tool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080523A (en) * 2019-06-05 2019-08-02 重庆大学 A kind of civil engineering concrete cast-in-situ side template die drawing tool
CN110080523B (en) * 2019-06-05 2023-11-07 重庆大学 Cast-in-place side form drawing tool of civil engineering concrete

Similar Documents

Publication Publication Date Title
CN206769154U (en) A kind of superimposed sheet hoard strip hangs shell template
CN106930459A (en) A kind of superimposed sheet hoard strip hangs shell template
CN208844916U (en) Assembled hoard strip hangs mould
CN111827670B (en) Reinforcing tool for floor hole hanging die and construction method thereof
CN202706553U (en) Shear wall small opening template bolt reinforcing part
CN201047167Y (en) Draw rod for building
CN202969728U (en) Embedded cylindrical nut anchor bearing
CN210888078U (en) Embedded box for hyperboloid structural veneer and hyperboloid veneer construction structure
CN204754210U (en) Instrument is consolidated to beam mold board
CN200971587Y (en) Plum-blossom shaped reinforced bar protection layer pad and production mould thereof
CN204054331U (en) A kind of regular screw threads steel tensioning equipment
CN2863981Y (en) Building module convenient for assembly and removing
CN201362961Y (en) Split-type opposite-drawing screw rod
CN100485151C (en) Water stop screw rod
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN201486140U (en) Wall bushing
CN104141385A (en) Counter bracing device for installation of pouring formwork of concrete walls
CN203034794U (en) Reinforcement device for external wall mortar-leakage-proof template
CN210791412U (en) Mould of concrete prefabricated member
CN202755655U (en) Multifunctional draw bar device of construction formwork
CN2873941Y (en) Positioning fastening device for building formwork
CN219338018U (en) Prefabricated component mould reinforcing apparatus
CN2706548Y (en) Mould for moulding column
CN201162352Y (en) Water stop screw
CN204940843U (en) Reinforcement system installed by non-waterproof position wall form split bolt and precast support sleeve pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080416