CN201038718Y - Device for implementing transformer substation segmental time-delay automatic reclosing by voltage conversion - Google Patents

Device for implementing transformer substation segmental time-delay automatic reclosing by voltage conversion Download PDF

Info

Publication number
CN201038718Y
CN201038718Y CNU2007200211510U CN200720021151U CN201038718Y CN 201038718 Y CN201038718 Y CN 201038718Y CN U2007200211510 U CNU2007200211510 U CN U2007200211510U CN 200720021151 U CN200720021151 U CN 200720021151U CN 201038718 Y CN201038718 Y CN 201038718Y
Authority
CN
China
Prior art keywords
relay
magnetic
circuit
contact
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200211510U
Other languages
Chinese (zh)
Inventor
孙振亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG JINYU TYRE CO Ltd
Original Assignee
SHANDONG JINYU TYRE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG JINYU TYRE CO Ltd filed Critical SHANDONG JINYU TYRE CO Ltd
Priority to CNU2007200211510U priority Critical patent/CN201038718Y/en
Application granted granted Critical
Publication of CN201038718Y publication Critical patent/CN201038718Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a delaying automatic reclosing device in the transformer substation. The technical proposal is: the AC 100V power loop is orderly in series with a switching self-lock switch, a central relay KA and the normally closed contacts of two groups of magnet-supporting relay KA2 and KA3. The AC 220V power loop is orderly in series with a time relay KT and three magnet-supporting relay KA1, KA2 and KA3; the circuit of the time relay KT is in series with the normally opened contact of the central relay KA; and the circuit of the three magnet-supporting relay KA1, KA2 and KA3 is alternately connected with the delay contact of time relay KT, the normally opened contacts of KA1 and KA2, and the normally opened contacts of KA2 and KA3; and the wire of the 220V power is connected with two-phase switch SB. When the manually closed switch is in parallel with the normally contact of magnet-supporting relay KA1, the utility model can automatically resume the power supply in the shortest time, eliminating the reclosing hazard in the accident; moreover, the misoperation in the repair of circuit is also prevented.

Description

Realize the automatic coincidence arrangement of transformer station's fragment delay by voltage transitions
Technical field:
The utility model relates to transformer station power supply control field, specifically is that a kind of transformer station that allows realizes the automatic coincidence arrangement of time-delay.
Background technology:
Transformer station is the maincenter that electric power is provided for the user, in order to guarantee under unattended situation, in time to restore electricity, and main at present the intelligent protection device that adopts with automatic coincidence.This device just can be realized the automatic coincidence of transformer station, but in realizing the process that overlaps automatically, exist under the charged situation of main inlet wire, cause each minute transformer station to start simultaneously at one time, cause very big rush of current to electrical network, and the high-tension transformer of main inlet wire is also had very big injury.
The utility model content:
The purpose of this utility model is exactly in order to remedy the defective that existing intelligent protection device exists, proposes a kind of can be in time, segmentation carry out pass through the automatic coincidence arrangement of voltage transitions realization transformer station's fragment delay.
Realize that the technical scheme that above-mentioned purpose adopts is: exchange the normally-closed contact that contact successively on the 100V electric power loop separating brake self-lock switch #1, auxiliary relay KA and two groups of magnetic help formula relay K A2, KA3.One road time relay KT in parallel successively and three road magnetic help formula relay K A1, KA2, KA3 on the alternating current 220V electric power loop, the normally opened contact of polyphone auxiliary relay KA on time relay KT circuit, help the delayed contact of polyphone time relay KT on the formula relay K A1 circuit at magnetic, help by magnetic and be connected in magnetic after the normally opened contact parallel connection of formula relay K A1, KA2 and help on the formula relay K A2 circuit, help by magnetic to be connected in magnetic after the normally opened contact parallel connection of formula relay K A2, KA3 and to help on the formula relay K A3 circuit, on the alternating current 220V electric power incoming line, connect two-position switch SB.Help formula relay K A1 in parallel at closing by hand switch #2 two ends with magnetic.
Device of the present utility model; be mainly used in when having a power failure suddenly in transformer station; unattended operation in the transformer station; can be in the shortest time automatic recovery of power supply; this device has remedied that existing intelligent protection device can only be realized overlapping and defective that can not segmentation; also stopped the harmfulness that under accident, overlaps, more avoided because line maintenance and the situation of misoperation.
Description of drawings:
Accompanying drawing is the circuit theory diagrams of a kind of exemplary embodiments of the present utility model.
Embodiment:
With reference to accompanying drawing, draw one group at main inlet wire side voltage transformer and exchange the 100V power supply, exchange the normally-closed contact that contact successively on the 100V electric power loop separating brake self-lock switch #1, auxiliary relay KA and two groups of magnetic help formula relay K A2, KA3.Draw the alternating current 220V power supply at the station with transformer, one road time relay KT in parallel successively and three road magnetic help formula relay K A1 on the alternating current 220V electric power loop, KA2, KA3, the normally opened contact of polyphone auxiliary relay KA on time relay KT circuit, help the delayed contact of polyphone time relay KT on the formula relay K A1 circuit at magnetic, help formula relay K A1 by magnetic, being connected in magnetic after the normally opened contact parallel connection of KA2 helps on the formula relay K A2 circuit, help formula relay K A2 by magnetic, be connected in magnetic after the normally opened contact parallel connection of KA3 and help on the formula relay K A3 circuit, on the alternating current 220V electric power incoming line, connect two-position switch SB.Help formula relay K A1 in parallel at closing by hand switch #2 two ends with magnetic.
Principle of the present utility model and install and use explanation: when occurring having a power failure suddenly, because the inherent main inlet wire side in main sub-station all is equipped with voltage transformer, as long as go out the interchange control voltage of 100V from the voltage transformer side-draw, in each feeder line cabinet outlet side this device is installed, allow and respectively go out line loop according to its importance automatic switching successively, the separately impact of electric current, rely on voltage automatically electricity to be delivered to the workshop, reduce the time that has a power failure, this device can or line fault not occur owing to artificial interruption maintenance and cause the automatic phenomenon that overlaps of device appearance to take place, thereby more can not occur because the phenomenon generation that the control circuit fault causes main line to break down.
When the transformer station inherence runs into unexpected power failure, be nothing but to occur respectively going out that wiretap is threaded off automatically owing to have a power failure suddenly and owing to be not able to do in time manually to disconnect and cause that each segmentation transformer starts the phenomenon generation that causes big electric current simultaneously when incoming call, the automatic coincidence arrangement of delaying time need be when main inlet wire has a power failure suddenly at technical elements, thereby each main sub-station causes each segmentation to be threaded off automatically owing to online under-voltage, unexpected so on the net when electric voltage transformer charged, the transformer station station gets with transformer.If the SB two-position switch is in logical position, just this device has been dropped into running status, just can utilize the secondary 100V voltage of voltage transformer to control the connection of KA relay, this moment, the normally opened contact of KA relay was connected, promptly cause KT time relay closure, the delayed contact of the process KT time relay is by the conducting of KA1 relay.The KA1 relay normally open contact on the one hand can be with closing by hand switch contact (5 the close 6) short circuit that is attempted by on the high-voltage board change over switch operating handle, according to allowing the operate time of reconciling the time relay outgoing switch play the purpose that time-delay overlaps automatically after conducting.On the other hand for operating 100VKA relay is unlikely to be in for a long time running status, connection by the KA1 relay, KA2, KA3 two relays are got, the normally-closed contact that is serially connected in KA2 in the 100V control circuit, KA3 two relays is disconnected, make 100V KA relay out of service from circuit.For being told, this device belongs to the still under-voltage release power failure of manual operation power failure, the manual disconnection auxiliary contact on the universal seclector handle in the 100V control circuit, have been connected in series again, make transformer station in maintenance during certain loop such as manual disconnection change over switch, 19,20 two just can conducting, the automatic coincidence arrangement of delaying time just the misoperation phenomenon can not occur, in control loop, be connected in series the normally-closed contact of a KA3 relay again in order to ensure the fail safe of control loop more, thereby make the control loop can be owing to the malfunctioning automatic coincidence arrangement misoperation that causes delaying time of KA2 relay, as think that people's coincidence automatically that need not realize delaying time on duty is arranged temporarily, two-position switch can be broken from control loop, being installed as of this automatic coincidence arrangement of delaying time realizes in the transformer station that unattended operation has had big new an improvement again at technical elements.

Claims (1)

1. realize the automatic coincidence arrangement of transformer station's fragment delay by voltage transitions, it is characterized in that: exchange the separating brake self-lock switch (#1) of contacting successively on the 100V electric power loop, auxiliary relay (KA) and two groups of magnetic help formula relay (KA2, KA3) normally-closed contact, one road time relay in parallel successively (KT) and three road magnetic help formula relay (KA1 on the alternating current 220V electric power loop, KA2, KA3), on the time relay (KT) circuit, the contact normally opened contact of auxiliary relay (KA), help the delayed contact of the time relay (KT) that contact on formula relay (KA1) circuit at magnetic, help formula relay (KA1 by magnetic, KA2) being connected in magnetic after the normally opened contact parallel connection helps on formula relay (KA2) circuit, help formula relay (KA2 by magnetic, KA3) being connected in magnetic after the normally opened contact parallel connection helps on formula relay (KA3) circuit, on the alternating current 220V electric power incoming line, connect two-position switch (SB), help formula relay (KA1) in parallel with magnetic at closing by hand switch (#2) two ends.
CNU2007200211510U 2007-04-19 2007-04-19 Device for implementing transformer substation segmental time-delay automatic reclosing by voltage conversion Expired - Fee Related CN201038718Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200211510U CN201038718Y (en) 2007-04-19 2007-04-19 Device for implementing transformer substation segmental time-delay automatic reclosing by voltage conversion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200211510U CN201038718Y (en) 2007-04-19 2007-04-19 Device for implementing transformer substation segmental time-delay automatic reclosing by voltage conversion

Publications (1)

Publication Number Publication Date
CN201038718Y true CN201038718Y (en) 2008-03-19

Family

ID=39211242

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200211510U Expired - Fee Related CN201038718Y (en) 2007-04-19 2007-04-19 Device for implementing transformer substation segmental time-delay automatic reclosing by voltage conversion

Country Status (1)

Country Link
CN (1) CN201038718Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105047494A (en) * 2015-08-14 2015-11-11 国家电网公司 Automatic closing apparatus of low-voltage universal circuit breaker
CN112392743A (en) * 2020-10-13 2021-02-23 广西电网有限责任公司梧州供电局 Oil-submersible pump control device
CN113726013A (en) * 2021-08-31 2021-11-30 国网冀北电力有限公司承德供电公司 Remote restarting device for substation equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105047494A (en) * 2015-08-14 2015-11-11 国家电网公司 Automatic closing apparatus of low-voltage universal circuit breaker
CN112392743A (en) * 2020-10-13 2021-02-23 广西电网有限责任公司梧州供电局 Oil-submersible pump control device
CN113726013A (en) * 2021-08-31 2021-11-30 国网冀北电力有限公司承德供电公司 Remote restarting device for substation equipment

Similar Documents

Publication Publication Date Title
CN101369739B (en) Spare power automatic switching device and method for three-segment bus two-segment switch
CN101662144A (en) Feeder automation processing method and device of distribution network
CN104092300A (en) 10kV handcart type high-voltage switch cabinet brake-separating monitoring loop
CN204068430U (en) A kind of intelligence longitudinally interconnected feeder automation control system
CN201038718Y (en) Device for implementing transformer substation segmental time-delay automatic reclosing by voltage conversion
CN109003850A (en) A kind of switch operation mechanism and its control circuit
CN203205987U (en) Device for remote control operation of circuit breaker for power supply of motor with isolating switch
CN203352192U (en) Direct current switch device
CN201541220U (en) Electric motor Y-delta starting equipment
CN110021486B (en) Automatic reclosing device for voltage-loss tripping
CN206023211U (en) A kind of little bar coupler blocking device of direct current
CN205489519U (en) High -power direct current breaker of high voltage
CN107394747A (en) Box type transformer auto recloser
CN204012928U (en) A kind of 10kV handcart type high voltage switch cabinet separating brake monitoring circuit
CN203774211U (en) Automatic closing control circuit of universal circuit breaker
CN101728773B (en) Full-adaptive high-voltage switch controller based on light-coupled control
CN207853185U (en) The female simultaneous other system structure of substation
CN201717670U (en) Dual-power-supply switching device with overvoltage protection
CN203071647U (en) Low-voltage switch cabinet automatic input and recovery device
CN203014477U (en) Automatic switching control device for alternating current lighting power failure
CN109510193A (en) A kind of distribution switchyard segmentation backup auto-activating device and its operation method
CN204794328U (en) Three -phase electricity dual supply automatic switching control equipment
CN210724305U (en) Fault guiding safety device, power utilization safety system, multi-path power utilization safety system and automatic bus transfer interlocking control system
CN114784768A (en) Over-current protection method for rail transit bidirectional power supply system
CN202678949U (en) 110kv circuit protection system capable of avoiding multi-reclosing failures

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080319

Termination date: 20110419