CN201024934Y - Artesian well liquid transport pipe convergence device - Google Patents
Artesian well liquid transport pipe convergence device Download PDFInfo
- Publication number
- CN201024934Y CN201024934Y CNU2007200789342U CN200720078934U CN201024934Y CN 201024934 Y CN201024934 Y CN 201024934Y CN U2007200789342 U CNU2007200789342 U CN U2007200789342U CN 200720078934 U CN200720078934 U CN 200720078934U CN 201024934 Y CN201024934 Y CN 201024934Y
- Authority
- CN
- China
- Prior art keywords
- utility
- pipe
- model
- outer tube
- well drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to a pipe assembly device for covering well drilling liquid, which is used for conveying the well drilling liquid and belongs to the technical field of well drilling liquid circulating system device. The utility model solves the problem that the delivering the prior solid control device needs to detach the fixed system, move the pipes of different diameter to a new place and then connect the pipes together one by one. The utility model adopts the pipe integrated installation and the respective connecting method. The utility model comprises a lifting frame, a fixed structure, an inner pipe and an outer pipe; the two ends of the outer pipe is provided with a quick connector to form an independent sleeve unit and connect to a pipe device; the utility model adopts the compound fixing and connecting, the inner pipe can be pushed into the outer pipe through detaching the tightening but when the utility model needs to be moved; and the utility model adopts the folding and fixing method to bring convenience to the module transportation.
Description
Technical field: a kind of drilling fluid conveying pipeline device, the drilling fluid that is used for the drilling well of petroleum gas cluster well is carried, and relates to a kind of design and manufacturing technology field of drilling-fluid circulation system corollary apparatus.
Background technology: in the relatively more concentrated ocean of petroleum distribution, oil field, land block, carry out the cluster well drillng operation, well quantity is many, well spacing is little, and rig adopts multi-faceted integral translation technology, can satisfy the needs an intensive drilling well of FX, and be provided in solid controlling system on the rig, because equipment is more, quality is big, and manifold connects complicated, so it is also bigger to take the well site area, adopts hydraulic pressure or drag translation schemes such as dress just very difficult; The just present solid controlling system that is equipped with, because each root manifold all is independent connection, and be fixed on different positions separately, so otherwise mobile solid controlling system is realized translation, to guarantee that also it is impossible that drilling fluid is transported to each well location, as the solid controlling system of the present ZJ50 rig that generally uses, do not dismantle the well location translation that whole manifolds can only realize that at most the 20m scope is interior; The resettlement of therefore existing solid control equipment needs the whole solid controlling system of dismounting earlier, move one one of the manifold of different tube diameters to new position then, and then one couples together, so just need to increase cost, increase and remove between ampere-hour, and then prolong drilling period.
Summary of the invention: the purpose of this utility model is at prior art problems, adopts identical caliber to concentrate the remittance dress, distinguishes ways of connecting, designs a kind of drilling fluid conveying pipeline device of modular skid.
The utility model is achieved in that this device comprises sled frame, fixed structure, interior pipe and outer tube, outer tube is fixed on the sled frame by fixed structure, limiting plate on the fixed structure comprises two groups of cross spacing plate and longitudinal spacing plates, be provided with union snap joint at the two ends of outer tube, one end of interior pipe is arranged in the outer tube, the other end is provided with an operating grip, an end that is provided with operating grip is exposed at the outside of outer tube, interior pipe can spur in outer tube freely, constitutes each suit unit with this; When using, according to position, well site and circulating system requirement, path according to the circulating system, each suit unit is placed in segmentation, the interior pipe of pulling out each suit unit then inserts the outer tube of next suit unit successively, each interface is coupled to one with the union ready-packaged joint, forms whole manifold device.
The beneficial effects of the utility model are: adopt independent sleeve structure, transportation module and placement space have been reduced, the segmentation of employing combined type is fixed and is connect, each group suit unit is fixed on manifold with the pipe clamp bearing and drags on the sled, is serially connected then, makes the manifold marshalling, during resettlement, can behind the quick union of dismounting, adopt the fixing mode of closed assembly, be convenient to the modularization transportation.
Description of drawings:
Fig. 1 is a cell side TV structure of the utility model figure.
Fig. 2 is a unit of the utility model plan structure figure.
Fig. 3 is two unit connection diagrams of the utility model.
Fig. 4 is three block construction closed assemblies of the utility model schematic diagram.
The specific embodiment: the utility model comprises the sled frame, fixed structure, interior pipe and outer tube, fixed structure comprises fixed support 2, cross spacing plate 5 and longitudinal spacing plate 6, outer tube 3 is fixed on the sled frame 1 by fixed support 2, cross spacing plate 5 and longitudinal spacing plate 6 are arranged on the upper end of fixed support 2, be provided with union snap joint 4 at the two ends of outer tube 3, one end of interior pipe 7 is arranged in the outer tube 3, the other end is provided with an operating grip 8, an end that is provided with operating grip 8 is exposed at the outside of outer tube 3, interior pipe 7 can spur in outer tube 3 freely, constitutes a suit unit with this; When using, according to position, well site and circulating system requirement, path according to the circulating system, respectively each suit unit is placed on the path of setting, the interior pipe 7 of pulling out each suit unit then inserts in the outer tube 3 of next suit unit successively, each interface is coupled to one with union snap joint 4, forms whole manifold device; When rig moves to new position, unscrew the clamp nut of the union snap joint 4 that connects rig one end, according to the distance that rig moves, add new independent suit unit, and be coupled to one by union snap joint 4, just formed new manifold and connected; In the time a plurality of unit suit need being transported to new well site, for the convenience of transporting, unit independently can be stacked by cross spacing plate 5 and longitudinal spacing plate 6 and transport next place to, unload each suit unit then as required successively, as required each suit unit is placed on the position that needs again, pipe 7 inserts in the outer tube 3 of another independent suit unit in pulling out, and be coupled to one by union snap joint 4, in this way, at rig on a large scale, during the cluster well drilling well of multi-direction different well spacings, a kind of not mobile solid controlling system just can be provided, can realize the sleeve type drilling fluid conveying pipeline device of the drilling fluid backflow of different length and diverse location again, satisfy the technological requirement that circulation of drilling fluid is carried.
Claims (1)
1. drilling fluid conveying pipeline device, comprise sled frame, fixed structure, interior pipe and outer tube, it is characterized in that: fixed structure comprises fixed support, cross spacing plate and longitudinal spacing plate, outer tube is fixed on the sled frame by fixed support, cross spacing plate and longitudinal spacing plate are arranged on support bracket fastened upper end, be provided with union snap joint at the two ends of outer tube, one end of interior pipe is arranged in the outer tube, the other end is provided with an operating grip, an end that is provided with operating grip is exposed at the outside of outer tube, and interior pipe can spur in outer tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200789342U CN201024934Y (en) | 2007-03-30 | 2007-03-30 | Artesian well liquid transport pipe convergence device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200789342U CN201024934Y (en) | 2007-03-30 | 2007-03-30 | Artesian well liquid transport pipe convergence device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201024934Y true CN201024934Y (en) | 2008-02-20 |
Family
ID=39098791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007200789342U Expired - Fee Related CN201024934Y (en) | 2007-03-30 | 2007-03-30 | Artesian well liquid transport pipe convergence device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201024934Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102507242A (en) * | 2011-10-31 | 2012-06-20 | 中国海洋石油总公司 | Testing system of circulation test |
CN104864264A (en) * | 2015-05-25 | 2015-08-26 | 北京威浦实信科技有限公司 | Manual and mechanical steel pipe tandem system |
-
2007
- 2007-03-30 CN CNU2007200789342U patent/CN201024934Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102507242A (en) * | 2011-10-31 | 2012-06-20 | 中国海洋石油总公司 | Testing system of circulation test |
CN102507242B (en) * | 2011-10-31 | 2014-09-10 | 中国海洋石油总公司 | Testing system of circulation test |
CN104864264A (en) * | 2015-05-25 | 2015-08-26 | 北京威浦实信科技有限公司 | Manual and mechanical steel pipe tandem system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10400528B2 (en) | Modular manifold | |
CN201786243U (en) | Drill for underground | |
US20150041220A1 (en) | Plural input mud-collecting manifold | |
CN206693953U (en) | It is a kind of to connect pricker device for the continuous of drill jumbo | |
CN109441420B (en) | Light-duty high low pressure fracturing manifold | |
CN201024934Y (en) | Artesian well liquid transport pipe convergence device | |
CN103084777A (en) | Welding device for oil tube | |
CN102313078B (en) | Construction method for curve steel pipe jacking | |
CN204879239U (en) | Branching is displacement compensation ripple tube swelling festival for pipeline | |
CN202158351U (en) | Central control cabin pipeline system in in-situ leaching well fields | |
CN203285334U (en) | Radial horizontal well steering device | |
CN201013321Y (en) | Oil gas field multi-well short-distance casecade gas collection device | |
CN102230559B (en) | Petroleum and petrochemical torch horizontal pipeline deformation compensation method and system based on rotary compensator | |
CN203336098U (en) | Adapter flange used for pipeline connection | |
CN202064336U (en) | Trestle connecting device between offshore platforms | |
CN102226331B (en) | Device for connecting trestle between marine platforms | |
KR101334327B1 (en) | Mud supplying apparatus for drilling | |
CN201787270U (en) | Floating pipeline quick-repair joint | |
CN106369239A (en) | High polymer material composite pipeline high-pressure-resistant telescopic pipe joint and connecting method thereof | |
CN203626605U (en) | Integral translation system for truck-mounted rig | |
CN203441407U (en) | Locking and unlocking device of tripping tool of mandrel hanger | |
CN201973390U (en) | Articulated mechanism of high-pressure high-flow oil pipes | |
CN201513660U (en) | Reducing combined five-way pipe | |
CN205618832U (en) | Soil sampling restores hydraulic connecting board of integrative rig | |
CN202100883U (en) | Deformation compensation system for petroleum and petrochemical torch horizontal pipeline on basis of rotary compensators |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080220 Termination date: 20120330 |