Prior art keywords
compressor
pile
utility
tremie
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200500012U
Other languages
Chinese (zh)
Inventor
许兆锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200500012U priority Critical patent/CN201024423Y/en
Application granted granted Critical
Publication of CN201024423Y publication Critical patent/CN201024423Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a multi-function pumping bored, slurry vibrating and drill pressing pile machine, which is characterized in that the utility model comprises a high frequency vibration aid (17), a compressor motor (19), a compressor (20), a cement and concrete slurry cylinder (21) and a concrete slurry supplying pipe (22). Compared with the prior art, the utility model has the advantages that: firstly, the utility model not only has a pile-driving machine that is good at a soft soil layer but also has an impact-shock pile machine that is good at a coarse and thick gravel layer, thus being suitable for complicated changes of various geology; secondly, a grouting auxiliary vibration of small power and super high frequency is adopted to realize the purpose of firm concrete foundation and fast grouting pile formation; thirdly, the technology of concrete slurry closed fast compression, transportation, grouting pile formation is adopted to avoid polluting the environment.

Description

A kind of multi-functional pressure is irritated the slurry drill stake machine that shakes
Technical field:
The utility model relates to a kind of multi-functional pressure and irritates the slurry drill stake machine that shakes.
Background technology:
At present, China's building foundation engineering, the pile-driving machine of extensive use drilled pile wet method concrete spouting pile, Churn drill stake machine, the machinery pile digger reaches and manually digs stake etc., can reach the function of hole deslagging concrete perfusion slurry pile, wherein, Churn drill stake machine is mainly by frame, main frame, secondary machine, hoist engine, jump bit, transfer, casing, draw the slag tube, compositions such as cylinder band clutch, the advantage of above-mentioned these existing equipments is simple in structure, noiselessness, dependable performance, can extremely construct and operation easily under the complex geological conditions, cost is low etc., but they also have more following shortcomings:
1. the technology that has lacked extremely crucial dither perfusion pile, form jerry-built project extremely easily, the impact stake machine is when the perfusion slurry, can only lean on the surge of freely falling body to pour into pile entirely, but owing to directly be subjected to the influence of cage root resistance, make it stop the landing that slurry quickens, influenced impact force, just form dangerous hidden danger such as honeycomb, short, bristly hair or beard neck even broken pile naturally;
2. pile-driving machine is also unclear because of the accumulated slag of bottom, its hole row that exceeds standard sometimes, cause the screenings at the bottom of the hole obviously to separate with cement concrete, form the stake bottom and lost anti-solid bearing stratum effect, treat that pile body is after load, by the inequality of doing each sedimentation, finally the bad hidden danger that causes structural entity, it loses heavy especially often;
3. pile-driving machine remains and adopts backward iron trolley fortune slurry and mix-in-place cement slurry at present, has increased the pollution of urban environment greatly, can not get rid of indivedual because of the direct danger that reduces the concrete specification label that forms of using inferior materials and turning out substandard goods;
4. when pile-driving machine is drilled into thick thick macadam, tend to occur make it to bore the designing requirement that reaches bearing stratum one rock stratum, and cause the accidental loss of being forced to the machine of moving back because of bowlder stone rotates the disadvantage that is stuck bit and then seriously scraps thereupon.
Summary of the invention:
The purpose of this utility model provides a kind of multi-functional pressure and irritates the slurry drill stake machine that shakes, and it can overcome the deficiencies in the prior art.
The utility model is achieved in that it is mainly by auxiliary pulley 1, head pulley 2, mobile jib 3, fore stay 4, backstay 5, diagonal brace 6, twin-roll hoist engine 7, directive wheel 8, chock 9, steel pipe 10, for mud tube 11, overfall 12, mud aqueduct 13, casing backfill 14, percussion bit 15, funnel 16, dither assistor 17, stake hole tremie 18, compressor motor 19, compressor 20, cement concrete slurry cylinder 21, concrete flow inlet 22 and brill dish 23 are formed, wherein, compressor motor 19 connects compressor 20, compressor 20 connects cement concrete slurry cylinder 21, cement concrete slurry cylinder 21 is communicated with stake hole tremie 18 by concrete flow inlet 22, stake hole tremie 18 connects brill dish 23, and dither assistor 17 is contained on the hole tremie 18.
The utility model compared with prior art has the following advantages: the one, and have pile-driving machine simultaneously and be good at the characteristics that weak soil layer and Churn drill stake machine are good at thick thick macadam, the complexity that can adapt to various geology changes; The 2nd, adopted the perfusion slurry of small-power hyperfrequency to assist vibration, reach the purpose that concrete foundation is firm and pour into pile fast; The 3rd, adopted the closed Fast Compression of concrete slurry to carry the technology of perfusion slurry vibration pile, avoided pollution to environment.
Description of drawings:
Fig. 1 is a structural representation of the present utility model
The specific embodiment:
As shown in Figure 1, the utility model is mainly by auxiliary pulley 1, head pulley 2, mobile jib 3, fore stay 4, backstay 5, diagonal brace 6, twin-roll hoist engine 7, directive wheel 8, chock 9, steel pipe 10, for mud tube 11, overfall 12, mud aqueduct 13, casing backfill 14, percussion bit 15, funnel 16, dither assistor 17, stake hole tremie 18, compressor motor 19, compressor 20, cement concrete slurry cylinder 21, concrete flow inlet 22 and brill dish 23 are formed, wherein, compressor motor 19 connects compressor 20, compressor 20 connects cement concrete slurry cylinder 21, cement concrete slurry cylinder 21 is communicated with stake hole tremie 18 by concrete flow inlet 22, stake hole tremie 18 connects brill dish 23, and dither assistor 17 is contained on the hole tremie 18.
During work, compressor motor 19 drive compression machines 20, compressor 20 is transported to the cement concrete slurry in the cement concrete slurry cylinder 21 in the hole tremie 18 by concrete flow inlet 22, dither assistor 17 carries out the auxiliary vibration of perfusion slurry of small-power hyperfrequency, make a hole tremie 18 continuously uninterruptedly, efficiently apace cement concrete is carried downwards, reach firmly and the fast purpose of perfusion pile of concrete foundation.

Claims (1)

1. a multi-functional pressure is irritated the slurry drill stake machine that shakes, mainly by auxiliary pulley (1), head pulley (2), mobile jib (3), fore stay (4), backstay (5), diagonal brace (6), twin-roll hoist engine (7), directive wheel (8), chock (9), steel pipe (10), for mud tube (11), overfall (12), mud aqueduct (13), casing backfill (14), percussion bit (15), funnel (16), stake hole tremie (18) and brill dish compositions such as (23), it is characterized in that having dither assistor (17), compressor motor (19), compressor (20), cement concrete slurry cylinder (21) and concrete flow inlet (22), wherein, compressor motor (19) connects compressor (20), compressor (20) connects cement concrete slurry cylinder (21), cement concrete slurry cylinder (21) is communicated with stake hole tremie (18) by concrete flow inlet (22), stake hole tremie (18) connects brill dish (23), and dither assistor (17) is contained on the hole tremie (18).
CNU2007200500012U 2007-04-05 2007-04-05 Multifunctional pressing filling slurry vibration impact drill pile machine Expired - Fee Related CN201024423Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200500012U CN201024423Y (en) 2007-04-05 2007-04-05 Multifunctional pressing filling slurry vibration impact drill pile machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200500012U CN201024423Y (en) 2007-04-05 2007-04-05 Multifunctional pressing filling slurry vibration impact drill pile machine

Publications (1)

Publication Number Publication Date
CN201024423Y true CN201024423Y (en) 2008-02-20

Family

ID=39098277

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200500012U Expired - Fee Related CN201024423Y (en) 2007-04-05 2007-04-05 Multifunctional pressing filling slurry vibration impact drill pile machine

Country Status (1)

Country Link
CN (1) CN201024423Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704834A (en) * 2012-05-30 2012-10-03 张永忠 Frequency oscillation pile casing type drilling machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704834A (en) * 2012-05-30 2012-10-03 张永忠 Frequency oscillation pile casing type drilling machine
CN102704834B (en) * 2012-05-30 2014-06-18 山东华邦建设集团有限公司 Frequency oscillation pile casing type drilling machine

Similar Documents

Publication Publication Date Title
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN100476082C (en) Post-grouting construction method for long helical bore grouting pile and grouting device thereof
CN102505684A (en) Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN102900079A (en) High-frequency hydraulic vibratory construction method for cement-soil core-inserted combined pile
CN101608448A (en) Cement paste spraying multi-directional core entraining agitation pile piling method
CN102011399A (en) PHC pile-based multiple high jet pedestal pile construction method
CN102182180B (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN101148874A (en) Construction method for increasing dry auger boring pouring pile bearing capacity
CN103898892A (en) Processing method and device for reinforcing soft foundation by hydraulic vibration combined with vacuum water suction
CN101701459B (en) Method for processing soft soil foundation of intertidal belt to form construction working face
CN201024423Y (en) Multifunctional pressing filling slurry vibration impact drill pile machine
CN104746512A (en) Cement soil stiffness composite pile and pile forming method thereof
CN105421446B (en) A kind of construction method of composite soil extruding solidification prefabricated pile for treatment of soft foundation
CN108468334A (en) Sandy pear variety is dry to dig clay dado pore-creating filling pile constructing device
CN102182178B (en) Solid and hollow integrated pile, pile forming device and pile forming method
CN101824962B (en) Method for soil mass supporting construction by jet mixing drilling tool
CN101899827B (en) Broken soil vibration and compaction treatment method by utilizing impact hammer in immersed tube in riprap filled foundation
CN204282360U (en) Covering layer prestressed anchoring structure
CN205934924U (en) A pile sinking device that in being used for, bores vibration major diameter PHC tubular pile
CN205475211U (en) A mix soil extrusion solidification precast pile for soft base is handled
CN204530685U (en) Cement soil stiffness composite pile
CN1259604A (en) Cement earth reinforced composite piling method
CN205100208U (en) Crowded, reaming reinforced concrete bored concrete pile composite pile of high water spray earth anger
CN201933494U (en) Solid and hollow integrated pile and pile forming device thereof
CN2622250Y (en) Built-up rammer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Xu Zhaofeng

Document name: Notification to Pay the Fees

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080220

Termination date: 20100405