CN201014052Y - Staged cable bridge rack bottom plating embedded bar steel - Google Patents

Staged cable bridge rack bottom plating embedded bar steel Download PDF

Info

Publication number
CN201014052Y
CN201014052Y CNU2007200679022U CN200720067902U CN201014052Y CN 201014052 Y CN201014052 Y CN 201014052Y CN U2007200679022 U CNU2007200679022 U CN U2007200679022U CN 200720067902 U CN200720067902 U CN 200720067902U CN 201014052 Y CN201014052 Y CN 201014052Y
Authority
CN
China
Prior art keywords
base plate
motherboard
steel bar
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2007200679022U
Other languages
Chinese (zh)
Inventor
李鸿宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SUPER HIGH ENGINEERING PLASTICS Co Ltd
Original Assignee
SHANGHAI SUPER HIGH ENGINEERING PLASTICS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SUPER HIGH ENGINEERING PLASTICS Co Ltd filed Critical SHANGHAI SUPER HIGH ENGINEERING PLASTICS Co Ltd
Priority to CNU2007200679022U priority Critical patent/CN201014052Y/en
Application granted granted Critical
Publication of CN201014052Y publication Critical patent/CN201014052Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a built-in stepped-cable bridge motherboard, and the inner of a plastic plate of the motherboard is equipped with the steel rod; a joint jawing groove that is hooked and connected with a fastener of a sideboard is arranged on the upper surface of the motherboard, and a groove and a convex gear that make a cable form friction resistance are arranged on the upper surface of the motherboard. The stepped-cable bridge motherboard of the utility model is a plastic injecting component produced by models with different specifications, and is provided with the steel rod and a steel bar inside. A plurality of empty lattices are positioned at the bottom of the motherboard with a function of reducing the weight, and the molding products shrink evenly. The utility model has the advantages of high strength, convenient installation, being able to regulate a stepped interval neural position, and improving the performances of insulating and corrosion resistance by covering the inner-placed steel rod with plastic. The two sides of the motherboard of the utility model and the sideboard of the cable bridge are in a notch-intercalated structure, which improves the stability of the connection between the motherboard and the sideboard.

Description

The cascade cable testing bridge base plate of built-in steel bar
Technical field
The utility model relates to cable testing bridge, particularly a kind of base plate of cascade cable testing bridge of built-in steel bar.
Background technique
Cable testing bridge is a kind of structural member of cable laying therein.The modular cable crane span structure is subjected to the favor of user and producer owing to its highly versatile, combined and instant.The modular cable crane span structure is made up of base plate, side plate and cover plate usually, and its carrying cable gravity load is mainly born by side plate and base plate, and cover plate mainly plays dustproof, waterproof effect.
Because cable can produce heat when load is worked, therefore use in the design of cable testing bridge, its base plate is designed to cascade, be that base plate has certain width, adjacent base plate has certain neutral gear, arranges in order and forms ladder-type structure, and the neutral gear between the adjacent bottom plates has certain distance such as 100mm, the air ventilation of cable testing bridge inner chamber is convenient in the effect of neutral gear, to reach the purpose of cooling.But, often weakened the bearing capacity and the compressive strength of base plate owing to the existence of neutral gear.
Summary of the invention
Task of the present utility model provides a kind of cascade cable testing bridge base plate of improved built-in steel bar, and it has solved existing cable crane span structure base plate because of the problem that the neutral gear distance has weakened base plate bearing capacity and compressive strength is set.
The technical solution of the utility model is as follows:
A kind of cascade cable testing bridge base plate of built-in steel bar, it is placed on the cable testing bridge, base plate is stepped shaft, the plastic running surface inside of described base plate is provided with steel bar, upper surface at base plate is provided with the connection draw-in groove that is connected with side plate clamp dogging, also is provided with groove and the double wedge that makes cable form surface friction drag at the upper surface of base plate.
Cascade cable testing bridge base plate of the present utility model is the plastics injection member, can adopt the Mold Making of different size, built-in steel bar stiffening rib, for example round bar or Square Steel Bar.Base plate has certain width, and according to design, baseplate width is three times of built-in steel bar diameter, if built-in steel bar diameter is 10mm, baseplate width then is 30mm.The base plate bottom is provided with a plurality of neutral gear muscle lattice, can play the effect of weight reduction, and moulded products shrinks evenly.Plate upper surface is provided with two grooves and a double wedge, and it mainly acts on is the surface friction drag of increase and cable, helps cable and settles stable.
Cascade cable testing bridge base plate of the present utility model has following advantage:
1, intensity height.
2, easy for installation.
3, cascade interval neutral gear can be adjusted as required.
4, the baseplate width area is little, helps air ventilation, cooling.
5, built-in steel bar is by plastic overmold, and insulating properties and decay resistance all are improved.
Base plate two sides of the present utility model and cable bridge rack side board are the bayonet socket socket fitting type structure, have improved the steadiness of the two connection.
Description of drawings
Fig. 1 is the structural representation of the cascade cable testing bridge base plate of a kind of built-in steel bar of the present utility model.
Fig. 2 is the cross section structure schematic representation of Fig. 1 base plate.
Fig. 3 is that Fig. 1 base plate is installed in the structural representation on the cable testing bridge.
Embodiment
Referring to Fig. 1, Fig. 2 and Fig. 3, the utility model is a kind of cascade cable testing bridge base plate of built-in steel bar, and it is mounted on the cable testing bridge.Cable testing bridge is made up of side plate 1, base plate 2 and cover plate 3.Connection between base plate 2 is adjacent has certain neutral gear distance, and base plate 2 is arranged in order and is stairstepping.
Plastic running surface inside at base plate 2 is provided with steel bar 21, has played the effect of stiffening rib.This built-in steel bar 21 can be round bar, also can be Square Steel Bar.
Upper surface at base plate 2 is provided with connection draw-in groove 22, and side plate clamp 11 is connected with connection draw-in groove 22 doggings, has played the two firm effect of installing.
Upper surface at base plate 2 also is provided with groove 23 and double wedge 24, makes the cable on the cable testing bridge base plate 2 that is laid in form surface friction drag, and it is more stable to make cable settle.
Floor length can be decided according to the cable testing bridge specification, and the profile width after the cable testing bridge assembling is that 300~600mm does not wait usually.When the assembling cable crane span structure, in the side plate bearing socket, the side plate clamp hooks the connection draw-in groove of base plate with base plate two end socket joints, can be coated with a little binder at base plate two ends, finishes the main body assembling of cascade cable testing bridge at this point.
When base plate is installed, also base plate can be aimed at side plate clamp position from base plate end face direction in order and push, reached the installation effect of base plate equally.
Certainly, those skilled in the art in the present technique field will be appreciated that, the foregoing description only is to be used for illustrating the utility model, and be not with opposing qualification of the present utility model, as long as in connotation scope of the present utility model, all will drop in the scope of the utility model claim variation, the modification of the foregoing description.

Claims (3)

1. the cascade cable testing bridge base plate of a built-in steel bar, it is placed on the cable testing bridge, base plate is stepped shaft, it is characterized in that, the plastic running surface inside of described base plate is provided with steel bar, upper surface at base plate is provided with the connection draw-in groove that is connected with side plate clamp dogging, also is provided with groove and the double wedge that makes cable form surface friction drag at the upper surface of base plate.
2. the cascade cable testing bridge base plate of built-in steel bar according to claim 1 is characterized in that, described steel bar is a round bar.
3. the cascade cable testing bridge base plate of built-in steel bar according to claim 1 is characterized in that, described steel bar is a Square Steel Bar.
CNU2007200679022U 2007-03-16 2007-03-16 Staged cable bridge rack bottom plating embedded bar steel Expired - Lifetime CN201014052Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200679022U CN201014052Y (en) 2007-03-16 2007-03-16 Staged cable bridge rack bottom plating embedded bar steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200679022U CN201014052Y (en) 2007-03-16 2007-03-16 Staged cable bridge rack bottom plating embedded bar steel

Publications (1)

Publication Number Publication Date
CN201014052Y true CN201014052Y (en) 2008-01-30

Family

ID=39025846

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200679022U Expired - Lifetime CN201014052Y (en) 2007-03-16 2007-03-16 Staged cable bridge rack bottom plating embedded bar steel

Country Status (1)

Country Link
CN (1) CN201014052Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107504266A (en) * 2017-09-26 2017-12-22 达诺尔电气(集团)有限公司 A kind of gear regulating type cable bearer base
CN110011239A (en) * 2019-04-15 2019-07-12 安徽新沪电缆有限公司 A kind of ladder type light-duty cable bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107504266A (en) * 2017-09-26 2017-12-22 达诺尔电气(集团)有限公司 A kind of gear regulating type cable bearer base
CN110011239A (en) * 2019-04-15 2019-07-12 安徽新沪电缆有限公司 A kind of ladder type light-duty cable bridge

Similar Documents

Publication Publication Date Title
CN201450303U (en) Cable trench cover structure
CN201014052Y (en) Staged cable bridge rack bottom plating embedded bar steel
MX2012014053A (en) Prefabricated self-supporting construction element.
JP2010065453A (en) Foundation block, foundation block connecting tool and foundation
CN207512981U (en) Hollow floor core model
CN201672804U (en) Cross wall with novel structure for ring-type carbon baking furnace
CN208858020U (en) A kind of novel energy-saving building structure
CN201014053Y (en) Cable bridge rack side board of plastics and metallic grid composite bed
CN2731244Y (en) Combined mechanical fixing holder
CN2921513Y (en) Electric cable support
CN204282865U (en) A kind of multifunctional support overhead device
CN204571197U (en) Sound insulation floorings assembly
CN207377026U (en) Connection component and floor panel assembly
CN202220414U (en) Extraction type overlap joint stair tread board
CN205544042U (en) Elbow bend connection structure of plastic cable testing bridge
CN205423420U (en) Omnipotent connecting piece of each other detaining and subassembly thereof
CN205777042U (en) Novel insulating brick
CN219451156U (en) Thermal insulation building wall connection structure
CN2938503Y (en) Cable conduit connection structure
CN214461629U (en) Enhanced composite box component
CN203034722U (en) Novel structure of inorganic thermal baffle
CN204435197U (en) Aquaculture pontoon company connection device
CN101961885B (en) Ribbed precast component template for buildings
CN203787917U (en) Composite sheet material cable trench cover plate
CN107386579A (en) Connection component and floor panel assembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20080130

CX01 Expiry of patent term