CN201006880Y - Panel installation apparatus - Google Patents

Panel installation apparatus Download PDF

Info

Publication number
CN201006880Y
CN201006880Y CNU2007200673755U CN200720067375U CN201006880Y CN 201006880 Y CN201006880 Y CN 201006880Y CN U2007200673755 U CNU2007200673755 U CN U2007200673755U CN 200720067375 U CN200720067375 U CN 200720067375U CN 201006880 Y CN201006880 Y CN 201006880Y
Authority
CN
China
Prior art keywords
assembling
flange
connecting rods
plate
installing connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200673755U
Other languages
Chinese (zh)
Inventor
俞樟勇
宋建荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoshan Iron and Steel Co Ltd
Original Assignee
Baoshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoshan Iron and Steel Co Ltd filed Critical Baoshan Iron and Steel Co Ltd
Priority to CNU2007200673755U priority Critical patent/CN201006880Y/en
Application granted granted Critical
Publication of CN201006880Y publication Critical patent/CN201006880Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Blast Furnaces (AREA)

Abstract

A plate assembling device comprises an assembling flange, an assembling connecting bar, an assembling seat and a jack, wherein the assembling flange comprises a body and a flange arranged on one end of the body, a plate is arranged in and gets through the assembling flange, one end of the assembling connecting bar is detachably fixed to the flange of the assembling flange, the assembling seat is provided with a positioning hole, the other end of the assembling connecting bar gets through the positioning hole and supports the assembling seat, the assembling seat is also provided with a bearer which parallels the assembling connecting bar and faces the assembling flange, the assembling seat extends outwards to form the bearer, the jack is arranged on the bearer of the assembling seat, the jack faces and supports the plate. The assembling device can remarkably shorten the assembling time of a cooling plate of a blast furnace. The assembling device can guarantee that the cooling plate is assembled in place under the condition that the assembling space for the cooling plate is not completely cleaned, which avoids harm to production caused by that the cooling plate can not be assembled.

Description

The plate erecting device
Technical field
The utility model relates to a kind of plate erecting device, relates in particular to be used for the device that smelter is installed the cooling plate of blast furnace stack.
Background technology
The cooling of current blast furnace stack mainly contains dual mode: a kind of cooling stave thin-lining that is to use, another kind are to use intensive cooling thickness of slab furnace lining.Second kind more common, and promptly described cooling plate is the key equipment of shaft cooling system, and main effect is that the heat of the anti-material of shaft is taken away, and protects anti-material to reduce and corrode.
The installation site relation of blast furnace cooling board of the prior art and furnace shell, as shown in Figure 1, it in furnace shell 20 cooling plate 10, place relative with cooling plate 10 outside furnace shell 20 is provided with flange short tube 30, cooling plate sealing cover 11 is connected with flange short tube 30, is corrugated tube 50 and water pipe flange 40 at cooling plate sealing cover 11 skins.
Cooling plate in use scaling loss or cracking the time need be removed the replacing cooling plate.Because cooling plate has been filled assemblage gap with refractory mortar after installation, and in use furnace charge is piled up, and cooling plate is combined with furnace wall closely, removes very difficulty.
When cooling plate is installed, still need manpower that installing space is cleaned out, promptly so-called clear thorax.The difficult point of clear thorax work mainly is, in with the cleaning of cooling plate installing space, the cooling plate installing space is stopped up in the whereabouts that the top furnace charge can not stop, to fill earlier with the R40 refractory mortar when therefore clearing up and form skeleton, clear up refractory mortar again, carry out so repeatedly, reach the locus that can hold cooling plate fully and again cooling plate is installed into.Often cleared up a cooling plate space requirement more than 2 hour even the longer time, the blast furnace periodical repair time has to prolong.Sometimes can't clean out the cooling plate installing space really, just cooling plate can only be installed, and then temperature is uncontrollablely high when causing this regional area to produce, and has had a strong impact on the blast furnace ordinary production.How on one side clear thorax is the technical issues that need to address Yi Bian install fast.
Summary of the invention
The purpose of this utility model is to provide a kind of plate erecting device, the cooling plate settling time can effectively be shortened by this erecting device, alleviate the workload of artificial clear thorax, guarantee under the situation that the cooling plate installing space is not cleaned out fully, cooling plate to be in place, avoid cooling plate that the harm that brings to production can't be installed.
For reaching above-mentioned purpose, the utility model provides a kind of plate erecting device, comprising: mounting flange, and the flange that it has a body and is positioned at body end, plate is positioned at this mounting flange and runs through it; Installing connecting rods, one end removably are fixed on the described flange of mounting flange; Mount pad which is provided with pilot hole, and the other end of described installing connecting rods passes this pilot hole and is supported on the described mount pad; Also be provided with carriage on the mount pad, this carriage is parallel to installing connecting rods and is stretched out by mount pad towards mounting flange and form; Screw block places on the carriage of described mount pad, and it is towards described plate and this plate of contact.
Also comprise a tumbler pin, the described the other end of installing connecting rods is provided with fixed orifices, and this tumbler pin cooperates with described fixed orifices.
Preferably, described installing connecting rods is provided with a plurality of described fixed orificess.
Preferably, a described end of described installing connecting rods is provided with detent, and the described flange of described mounting flange snaps in this detent.
More preferably, the detent of described installing connecting rods is that a described end by installing connecting rods forms to two parallel flanges of lower convexity.
Described two parallel flanges of described installing connecting rods are provided with pilot hole, also are provided with positioning hole corresponding on the described flange of described mounting flange, and fastening piece passes the aligned pilot hole installing connecting rods is fixed on the mounting flange.
Preferably, the plate erecting device comprises two described installing connecting rods, and it is symmetricly set in the both sides up and down of mounting flange.
Described carriage is positioned at the middle part of mount pad, and the center of the end that plate is relative with carriage is provided with the supporting part that contacts with described screw block.
By erecting device of the present utility model, can shorten the settling time of blast furnace cooling board greatly, a cooling plate is installed from original 4 hours a cooling plate is installed till now and is only needed 1.5 hours.Guarantee under the situation that the cooling plate installing space is not cleaned out fully, cooling plate to be in place, avoid cooling plate that the harm that brings to production can't be installed.
Description of drawings
Fig. 1 is the mounting structure synoptic diagram of flange join type cooling plate of the prior art.
Fig. 2 is the user mode synoptic diagram of blast furnace cooling board erecting device of the present utility model.
Fig. 3 is the structural representation of the mount pad in the blast furnace cooling board erecting device of the present utility model.
Fig. 4 is the structural representation of the installing connecting rods in the blast furnace cooling board erecting device of the present utility model.
Fig. 5 is the decomposing schematic representation of blast furnace cooling board erecting device of the present utility model.
Embodiment
The plate of being installed in the present embodiment is for using the cooling plate in blast furnace.
As Fig. 2 is the structural representation of blast furnace cooling board erecting device of the present utility model, comprises mount pad 2, and installing connecting rods 3 and screw block 4 and mounting flange 5 four parts are formed.Also comprise a tumbler pin 23 in addition.
As Fig. 3, mount pad 2 respectively is provided with a pilot hole 22 with the lower end in the top, be provided with a carriage 21 at the mount pad waist, this carriage 21 is parallel to installing connecting rods 3 and is stretched out by mount pad 2 towards mounting flange 5 and form, in order to hold screw block 4, carriage 21 is positioned at the middle part of mount pad 2, is provided with a supporting part 24 with the center of the cooling plate 1 of carriage 21 opposite ends, and screw block 4 contacts with this supporting part 24.
As Fig. 4, two parallel flanges 311 are equipped with in installing connecting rods 3 one bottom portions, the intermediate formation one location groove 312 of two parallel flanges 311, the width of the flange 52 of the width of detent 312 and mounting flange 5 adapts, the described flange 52 of sending out orchid 5 is installed can be snapped in the detent 312, the other end of installing connecting rods 3 passes the pilot hole 22 of mount pad, is provided with a plurality of fixed orificess 321 at this end, and tumbler pin 23 can insert in the suitable fixed orifices 321 and position.Two parallel flanges 311 are provided with pilot hole 313, also be provided with positioning hole corresponding 521 on the flange 52 of described mounting flange 5, parallel flange pilot hole 313 is aimed at mounting flange pilot hole 521, pass hole after the alignment of this two hole with the fastening piece (not shown) then, installing connecting rods 3 is fixed on the mounting flange 5.
As Fig. 5, for blast furnace cooling board Unit Installation synoptic diagram is installed.Its assembling process is as follows: at first cooling plate 1 is installed in the mounting flange 5; Groove 312 with two parallel flange 311 intermediate formation of installing connecting rods 3 is stuck on the flange flange 52 then, and the bolt hole on the parallel flange 311 aligns with the bolt hole position on the flange flange 52, and in tack bolt inserting bolt hole, installing connecting rods 3 like this; Again two pilot holes 22 up and down of mount pad 2 are inserted in an end of installing connecting rods 3 respectively, position in the fixed orifices 321 with tumbler pin 23 insertion installing connecting rods 3; End with screw block 4 is shelved on the carriage 21 of mount pad 2 at last, and the other end contacts with supporting part 24.Operation manual pump (not shown) heads into cooling plate 1, is installed in the furnace shell.

Claims (8)

1. a plate erecting device is characterized in that, comprising:
Mounting flange, the flange that it has a body and is positioned at body end, plate is positioned at this mounting flange and runs through it;
Installing connecting rods, one end removably are fixed on the described flange of mounting flange;
Mount pad which is provided with pilot hole, and the other end of described installing connecting rods passes this pilot hole and is supported on the described mount pad; Also be provided with carriage on the mount pad, this carriage is parallel to installing connecting rods and is stretched out by mount pad towards mounting flange and form;
Screw block places on the carriage of described mount pad, and it is towards described plate and this plate of contact.
2. plate erecting device as claimed in claim 1 is characterized in that: also comprise a tumbler pin, the described the other end of installing connecting rods is provided with fixed orifices, and this tumbler pin cooperates with described fixed orifices.
3. plate erecting device as claimed in claim 2 is characterized in that: described installing connecting rods is provided with a plurality of described fixed orificess.
4. plate erecting device as claimed in claim 1 is characterized in that: a described end of described installing connecting rods is provided with detent, and the described flange of described mounting flange snaps in this detent.
5. plate erecting device as claimed in claim 4 is characterized in that: the detent of described installing connecting rods is that the described end by installing connecting rods forms to two parallel flanges of lower convexity.
6. plate erecting device as claimed in claim 5, it is characterized in that: described two parallel flanges of described installing connecting rods are provided with pilot hole, also be provided with positioning hole corresponding on the described flange of described mounting flange, fastening piece passes the aligned pilot hole installing connecting rods is fixed on the mounting flange.
7. plate erecting device as claimed in claim 1 or 2 is characterized in that: this device comprises two described installing connecting rods, and it is symmetricly set in the both sides up and down of mounting flange.
8. plate erecting device as claimed in claim 1 is characterized in that: described carriage is positioned at the middle part of mount pad, and the center of the end that plate is relative with carriage is provided with the supporting part that contacts with described screw block.
CNU2007200673755U 2007-02-14 2007-02-14 Panel installation apparatus Expired - Fee Related CN201006880Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200673755U CN201006880Y (en) 2007-02-14 2007-02-14 Panel installation apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200673755U CN201006880Y (en) 2007-02-14 2007-02-14 Panel installation apparatus

Publications (1)

Publication Number Publication Date
CN201006880Y true CN201006880Y (en) 2008-01-16

Family

ID=39002824

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200673755U Expired - Fee Related CN201006880Y (en) 2007-02-14 2007-02-14 Panel installation apparatus

Country Status (1)

Country Link
CN (1) CN201006880Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104451009A (en) * 2013-09-16 2015-03-25 宝山钢铁股份有限公司 Replacing apparatus and replacing method of blast furnace welding type cooling plate assembly
CN113201612A (en) * 2021-04-09 2021-08-03 北京首钢建设集团有限公司 Device and method for quickly removing copper cooling wall in residual iron discharging construction of blast furnace

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104451009A (en) * 2013-09-16 2015-03-25 宝山钢铁股份有限公司 Replacing apparatus and replacing method of blast furnace welding type cooling plate assembly
CN113201612A (en) * 2021-04-09 2021-08-03 北京首钢建设集团有限公司 Device and method for quickly removing copper cooling wall in residual iron discharging construction of blast furnace

Similar Documents

Publication Publication Date Title
CN101864720B (en) Paver
CN201006880Y (en) Panel installation apparatus
CN202024030U (en) Buckled type attemperator
CN202133229U (en) Cooling box of large-sized air separating equipment
CN106550582A (en) A kind of heat abstractor for high-power electric switch board
CN209723075U (en) A kind of double-deck driver's cabin pedestal for land leveller
CN210952479U (en) Heat radiator
CN206935982U (en) Cleaning jig
CN201678929U (en) Spreading machine
CN201543788U (en) Continuous casting crystallizer electromagnetic stirring cooling water quick connector
CN210674649U (en) Industrial environment air purifier
CN204674601U (en) Airtight air-supply pipeline structure
CN220554817U (en) Online water spraying structure of pressure vessel
CN218673275U (en) Horizontal shell air heat exchanger
CN215403172U (en) Integrated sewage treatment equipment convenient for assembling controller
CN201992273U (en) Integrated insulating layer module
CN219094827U (en) High-pressure water cutting nozzle
CN203564888U (en) Connecting structure of spraying pipe
CN202808868U (en) RH vacuum refined hot-bent pipe
CN206626277U (en) Cooling tower water supply pipe fixing device
CN208474598U (en) A kind of multistage input and output formula proportional valve controller
CN202012310U (en) Sand discharge board device of vibrating screen
CN210915647U (en) Wastewater treatment equipment for desulfurization and denitrification
CN102807218B (en) Carborundum-synthized resistance furnace
CN201669393U (en) Fast exchange device of spraying system at movable section of electric furnace continuous casting machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080116

Termination date: 20160214