CN201006880Y - Panel installation apparatus - Google Patents
Panel installation apparatus Download PDFInfo
- Publication number
- CN201006880Y CN201006880Y CNU2007200673755U CN200720067375U CN201006880Y CN 201006880 Y CN201006880 Y CN 201006880Y CN U2007200673755 U CNU2007200673755 U CN U2007200673755U CN 200720067375 U CN200720067375 U CN 200720067375U CN 201006880 Y CN201006880 Y CN 201006880Y
- Authority
- CN
- China
- Prior art keywords
- assembling
- flange
- connecting rods
- plate
- installing connecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Blast Furnaces (AREA)
Abstract
A plate assembling device comprises an assembling flange, an assembling connecting bar, an assembling seat and a jack, wherein the assembling flange comprises a body and a flange arranged on one end of the body, a plate is arranged in and gets through the assembling flange, one end of the assembling connecting bar is detachably fixed to the flange of the assembling flange, the assembling seat is provided with a positioning hole, the other end of the assembling connecting bar gets through the positioning hole and supports the assembling seat, the assembling seat is also provided with a bearer which parallels the assembling connecting bar and faces the assembling flange, the assembling seat extends outwards to form the bearer, the jack is arranged on the bearer of the assembling seat, the jack faces and supports the plate. The assembling device can remarkably shorten the assembling time of a cooling plate of a blast furnace. The assembling device can guarantee that the cooling plate is assembled in place under the condition that the assembling space for the cooling plate is not completely cleaned, which avoids harm to production caused by that the cooling plate can not be assembled.
Description
Technical field
The utility model relates to a kind of plate erecting device, relates in particular to be used for the device that smelter is installed the cooling plate of blast furnace stack.
Background technology
The cooling of current blast furnace stack mainly contains dual mode: a kind of cooling stave thin-lining that is to use, another kind are to use intensive cooling thickness of slab furnace lining.Second kind more common, and promptly described cooling plate is the key equipment of shaft cooling system, and main effect is that the heat of the anti-material of shaft is taken away, and protects anti-material to reduce and corrode.
The installation site relation of blast furnace cooling board of the prior art and furnace shell, as shown in Figure 1, it in furnace shell 20 cooling plate 10, place relative with cooling plate 10 outside furnace shell 20 is provided with flange short tube 30, cooling plate sealing cover 11 is connected with flange short tube 30, is corrugated tube 50 and water pipe flange 40 at cooling plate sealing cover 11 skins.
Cooling plate in use scaling loss or cracking the time need be removed the replacing cooling plate.Because cooling plate has been filled assemblage gap with refractory mortar after installation, and in use furnace charge is piled up, and cooling plate is combined with furnace wall closely, removes very difficulty.
When cooling plate is installed, still need manpower that installing space is cleaned out, promptly so-called clear thorax.The difficult point of clear thorax work mainly is, in with the cleaning of cooling plate installing space, the cooling plate installing space is stopped up in the whereabouts that the top furnace charge can not stop, to fill earlier with the R40 refractory mortar when therefore clearing up and form skeleton, clear up refractory mortar again, carry out so repeatedly, reach the locus that can hold cooling plate fully and again cooling plate is installed into.Often cleared up a cooling plate space requirement more than 2 hour even the longer time, the blast furnace periodical repair time has to prolong.Sometimes can't clean out the cooling plate installing space really, just cooling plate can only be installed, and then temperature is uncontrollablely high when causing this regional area to produce, and has had a strong impact on the blast furnace ordinary production.How on one side clear thorax is the technical issues that need to address Yi Bian install fast.
Summary of the invention
The purpose of this utility model is to provide a kind of plate erecting device, the cooling plate settling time can effectively be shortened by this erecting device, alleviate the workload of artificial clear thorax, guarantee under the situation that the cooling plate installing space is not cleaned out fully, cooling plate to be in place, avoid cooling plate that the harm that brings to production can't be installed.
For reaching above-mentioned purpose, the utility model provides a kind of plate erecting device, comprising: mounting flange, and the flange that it has a body and is positioned at body end, plate is positioned at this mounting flange and runs through it; Installing connecting rods, one end removably are fixed on the described flange of mounting flange; Mount pad which is provided with pilot hole, and the other end of described installing connecting rods passes this pilot hole and is supported on the described mount pad; Also be provided with carriage on the mount pad, this carriage is parallel to installing connecting rods and is stretched out by mount pad towards mounting flange and form; Screw block places on the carriage of described mount pad, and it is towards described plate and this plate of contact.
Also comprise a tumbler pin, the described the other end of installing connecting rods is provided with fixed orifices, and this tumbler pin cooperates with described fixed orifices.
Preferably, described installing connecting rods is provided with a plurality of described fixed orificess.
Preferably, a described end of described installing connecting rods is provided with detent, and the described flange of described mounting flange snaps in this detent.
More preferably, the detent of described installing connecting rods is that a described end by installing connecting rods forms to two parallel flanges of lower convexity.
Described two parallel flanges of described installing connecting rods are provided with pilot hole, also are provided with positioning hole corresponding on the described flange of described mounting flange, and fastening piece passes the aligned pilot hole installing connecting rods is fixed on the mounting flange.
Preferably, the plate erecting device comprises two described installing connecting rods, and it is symmetricly set in the both sides up and down of mounting flange.
Described carriage is positioned at the middle part of mount pad, and the center of the end that plate is relative with carriage is provided with the supporting part that contacts with described screw block.
By erecting device of the present utility model, can shorten the settling time of blast furnace cooling board greatly, a cooling plate is installed from original 4 hours a cooling plate is installed till now and is only needed 1.5 hours.Guarantee under the situation that the cooling plate installing space is not cleaned out fully, cooling plate to be in place, avoid cooling plate that the harm that brings to production can't be installed.
Description of drawings
Fig. 1 is the mounting structure synoptic diagram of flange join type cooling plate of the prior art.
Fig. 2 is the user mode synoptic diagram of blast furnace cooling board erecting device of the present utility model.
Fig. 3 is the structural representation of the mount pad in the blast furnace cooling board erecting device of the present utility model.
Fig. 4 is the structural representation of the installing connecting rods in the blast furnace cooling board erecting device of the present utility model.
Fig. 5 is the decomposing schematic representation of blast furnace cooling board erecting device of the present utility model.
Embodiment
The plate of being installed in the present embodiment is for using the cooling plate in blast furnace.
As Fig. 2 is the structural representation of blast furnace cooling board erecting device of the present utility model, comprises mount pad 2, and installing connecting rods 3 and screw block 4 and mounting flange 5 four parts are formed.Also comprise a tumbler pin 23 in addition.
As Fig. 3, mount pad 2 respectively is provided with a pilot hole 22 with the lower end in the top, be provided with a carriage 21 at the mount pad waist, this carriage 21 is parallel to installing connecting rods 3 and is stretched out by mount pad 2 towards mounting flange 5 and form, in order to hold screw block 4, carriage 21 is positioned at the middle part of mount pad 2, is provided with a supporting part 24 with the center of the cooling plate 1 of carriage 21 opposite ends, and screw block 4 contacts with this supporting part 24.
As Fig. 4, two parallel flanges 311 are equipped with in installing connecting rods 3 one bottom portions, the intermediate formation one location groove 312 of two parallel flanges 311, the width of the flange 52 of the width of detent 312 and mounting flange 5 adapts, the described flange 52 of sending out orchid 5 is installed can be snapped in the detent 312, the other end of installing connecting rods 3 passes the pilot hole 22 of mount pad, is provided with a plurality of fixed orificess 321 at this end, and tumbler pin 23 can insert in the suitable fixed orifices 321 and position.Two parallel flanges 311 are provided with pilot hole 313, also be provided with positioning hole corresponding 521 on the flange 52 of described mounting flange 5, parallel flange pilot hole 313 is aimed at mounting flange pilot hole 521, pass hole after the alignment of this two hole with the fastening piece (not shown) then, installing connecting rods 3 is fixed on the mounting flange 5.
As Fig. 5, for blast furnace cooling board Unit Installation synoptic diagram is installed.Its assembling process is as follows: at first cooling plate 1 is installed in the mounting flange 5; Groove 312 with two parallel flange 311 intermediate formation of installing connecting rods 3 is stuck on the flange flange 52 then, and the bolt hole on the parallel flange 311 aligns with the bolt hole position on the flange flange 52, and in tack bolt inserting bolt hole, installing connecting rods 3 like this; Again two pilot holes 22 up and down of mount pad 2 are inserted in an end of installing connecting rods 3 respectively, position in the fixed orifices 321 with tumbler pin 23 insertion installing connecting rods 3; End with screw block 4 is shelved on the carriage 21 of mount pad 2 at last, and the other end contacts with supporting part 24.Operation manual pump (not shown) heads into cooling plate 1, is installed in the furnace shell.
Claims (8)
1. a plate erecting device is characterized in that, comprising:
Mounting flange, the flange that it has a body and is positioned at body end, plate is positioned at this mounting flange and runs through it;
Installing connecting rods, one end removably are fixed on the described flange of mounting flange;
Mount pad which is provided with pilot hole, and the other end of described installing connecting rods passes this pilot hole and is supported on the described mount pad; Also be provided with carriage on the mount pad, this carriage is parallel to installing connecting rods and is stretched out by mount pad towards mounting flange and form;
Screw block places on the carriage of described mount pad, and it is towards described plate and this plate of contact.
2. plate erecting device as claimed in claim 1 is characterized in that: also comprise a tumbler pin, the described the other end of installing connecting rods is provided with fixed orifices, and this tumbler pin cooperates with described fixed orifices.
3. plate erecting device as claimed in claim 2 is characterized in that: described installing connecting rods is provided with a plurality of described fixed orificess.
4. plate erecting device as claimed in claim 1 is characterized in that: a described end of described installing connecting rods is provided with detent, and the described flange of described mounting flange snaps in this detent.
5. plate erecting device as claimed in claim 4 is characterized in that: the detent of described installing connecting rods is that the described end by installing connecting rods forms to two parallel flanges of lower convexity.
6. plate erecting device as claimed in claim 5, it is characterized in that: described two parallel flanges of described installing connecting rods are provided with pilot hole, also be provided with positioning hole corresponding on the described flange of described mounting flange, fastening piece passes the aligned pilot hole installing connecting rods is fixed on the mounting flange.
7. plate erecting device as claimed in claim 1 or 2 is characterized in that: this device comprises two described installing connecting rods, and it is symmetricly set in the both sides up and down of mounting flange.
8. plate erecting device as claimed in claim 1 is characterized in that: described carriage is positioned at the middle part of mount pad, and the center of the end that plate is relative with carriage is provided with the supporting part that contacts with described screw block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200673755U CN201006880Y (en) | 2007-02-14 | 2007-02-14 | Panel installation apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200673755U CN201006880Y (en) | 2007-02-14 | 2007-02-14 | Panel installation apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201006880Y true CN201006880Y (en) | 2008-01-16 |
Family
ID=39002824
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007200673755U Expired - Fee Related CN201006880Y (en) | 2007-02-14 | 2007-02-14 | Panel installation apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201006880Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104451009A (en) * | 2013-09-16 | 2015-03-25 | 宝山钢铁股份有限公司 | Replacing apparatus and replacing method of blast furnace welding type cooling plate assembly |
CN113201612A (en) * | 2021-04-09 | 2021-08-03 | 北京首钢建设集团有限公司 | Device and method for quickly removing copper cooling wall in residual iron discharging construction of blast furnace |
-
2007
- 2007-02-14 CN CNU2007200673755U patent/CN201006880Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104451009A (en) * | 2013-09-16 | 2015-03-25 | 宝山钢铁股份有限公司 | Replacing apparatus and replacing method of blast furnace welding type cooling plate assembly |
CN113201612A (en) * | 2021-04-09 | 2021-08-03 | 北京首钢建设集团有限公司 | Device and method for quickly removing copper cooling wall in residual iron discharging construction of blast furnace |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101864720B (en) | Paver | |
CN201006880Y (en) | Panel installation apparatus | |
CN202024030U (en) | Buckled type attemperator | |
CN202133229U (en) | Cooling box of large-sized air separating equipment | |
CN106550582A (en) | A kind of heat abstractor for high-power electric switch board | |
CN209723075U (en) | A kind of double-deck driver's cabin pedestal for land leveller | |
CN210952479U (en) | Heat radiator | |
CN206935982U (en) | Cleaning jig | |
CN201678929U (en) | Spreading machine | |
CN201543788U (en) | Continuous casting crystallizer electromagnetic stirring cooling water quick connector | |
CN210674649U (en) | Industrial environment air purifier | |
CN204674601U (en) | Airtight air-supply pipeline structure | |
CN220554817U (en) | Online water spraying structure of pressure vessel | |
CN218673275U (en) | Horizontal shell air heat exchanger | |
CN215403172U (en) | Integrated sewage treatment equipment convenient for assembling controller | |
CN201992273U (en) | Integrated insulating layer module | |
CN219094827U (en) | High-pressure water cutting nozzle | |
CN203564888U (en) | Connecting structure of spraying pipe | |
CN202808868U (en) | RH vacuum refined hot-bent pipe | |
CN206626277U (en) | Cooling tower water supply pipe fixing device | |
CN208474598U (en) | A kind of multistage input and output formula proportional valve controller | |
CN202012310U (en) | Sand discharge board device of vibrating screen | |
CN210915647U (en) | Wastewater treatment equipment for desulfurization and denitrification | |
CN102807218B (en) | Carborundum-synthized resistance furnace | |
CN201669393U (en) | Fast exchange device of spraying system at movable section of electric furnace continuous casting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080116 Termination date: 20160214 |