CN201003372Y - Modular drilling machine - Google Patents

Modular drilling machine Download PDF

Info

Publication number
CN201003372Y
CN201003372Y CNU2006201760084U CN200620176008U CN201003372Y CN 201003372 Y CN201003372 Y CN 201003372Y CN U2006201760084 U CNU2006201760084 U CN U2006201760084U CN 200620176008 U CN200620176008 U CN 200620176008U CN 201003372 Y CN201003372 Y CN 201003372Y
Authority
CN
China
Prior art keywords
module
rig
track
well
modular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2006201760084U
Other languages
Chinese (zh)
Inventor
魏昌进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Bohai Equipment Manufacturing Co Ltd
Original Assignee
Dagang Oilfield Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dagang Oilfield Group Co Ltd filed Critical Dagang Oilfield Group Co Ltd
Priority to CNU2006201760084U priority Critical patent/CN201003372Y/en
Application granted granted Critical
Publication of CN201003372Y publication Critical patent/CN201003372Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a module-type drill relates to a drill used in the cluster well operation on land or sea or offshore man-made island. In order to overcome the shortcomes that in the cluster well operation on land or sea or offshore man-made island, the well boring device can only operate independently resulting in inconvenient movement. An borer main module(1), an circulating module(2) and a control module(3) of the utility model are arranged on the rail(10) in turn and move along the rail(10), while an power module(6), a cementing unit module(4) and a cementing material module(5) are positioned outside the rail(10) and adopt the combined flat car migration or skid-mounted migration. In addition, the ground fixing sharing module(7) is positioned outside the rail(10). The beneficial results are that the reasonable layout of the well field can effectively improve the field utility, realize the batch well drilling, raise the integrated efficiency of the well drill work and reduce the investment into the cementing device.

Description

The modular rig
Technical field
The utility model relates to a kind of drilling equipment of oil and gas exploitation, particularly relates to a kind of modular rig that on land or at sea, carries out the cluster well operation on the man-made island of sea, beach.
Background technology
At man-made island or the land drilling equipment that carries out the cluster well operation, as rig, cementing equipment etc., generally adopt general rig to carry out operation, when the well number that needs operation not for a long time, adopt conventional drilling equipment and auxiliary equipment mode of transport just can satisfy the production needs, promptly the equipment that will be needed to carry by special transport vehicle is transported to the position of needs.The power section of conventional drilling also is to be placed on groundly, does not take move mode usually.When the well number more for a long time, reach tens of mouthful as the well number that needs on cluster well group, the man-made island to develop, even up to a hundred mouthfuls the time, conventional drilling equipment move mode just is difficult to satisfy the needs of high-efficiency mining, because it is big to move workload, whole efficiency is just relatively lower, and the enforcement of well cementation is also very loaded down with trivial details.
The utility model content
The purpose of this utility model is in order to overcome on land or, carry out in the cluster well operation on the man-made island of beach sea at sea, and drilling equipment can only independently working, move the deficiency of inconvenience, and a kind of modular rig is provided.
In order to achieve the above object, the utility model comprises fixedly shared device of rig, track, sleeve pipe conveying device, rack for rods, ground, rig moves along track in orbit, sleeve pipe conveying device, rack for rods outside track with the same moved further of rig, the position of rig when work and sleeve pipe conveying device, rack for rods is fixed, ground fixedly shared device is positioned near the rig, and rig primary module, circulation module, control module are arranged in order in orbit, and move along track; Power plant module, cementing equipment module, well cementing material module are positioned at outside the track, adopt migration of combined flat plate car or skid migration; Ground fixedly shared module is positioned at outside the track.
The beneficial effect of the utility model modular rig is that the well site is rationally distributed, can effectively improve the utilization of area rate, can realize drilling well in batches, improves the whole efficiency of drillng operation, reduces the input of well cementation equipment.
Description of drawings
Fig. 1 is the utility model modular rig well layout schematic diagram.
Fig. 2 is the vertical view of Fig. 1 modular rig well layout.
Among the figure: 1. rig primary module, 2. circulation module, 3. control module, 4. cementing equipment module, 5. well cementing material module, 6. power plant module, 7. fixedly shared module, 8. rack for rods, 9. sleeve pipe conveying device, 10. track of ground.
The specific embodiment
With reference to accompanying drawing, the utility model is further described.The modular rig mainly comprises fixedly 6 big modules such as shared module 7 of rig primary module 1, circulation module 2, control module 3, cementing equipment module 4, well cementing material module 5, power plant module 6, ground, also has rack for rods 8 in addition, sleeve pipe conveying device 9, and the track 10 that supplies rig primary module 1, circulation module 2, control module 3 to move.Rig primary module 1 moves on track 10, and sleeve pipe conveying device 9, rack for rods 8 are outside track, and rig primary module 1 is fixed with the position of sleeve pipe conveying device 9, rack for rods 8 during rig work.
Rig primary module 1 can be the new exclusive rig, also can form, mainly comprise the control system of overhead traveling crane, derrick, base, winch, suspension system, manifold, wellhead assembly, rotating disk, manifold and water, gas, liquid, electricity standard drill transformation.
The function of circulation module 2 is the needs that satisfy in the drilling process drilling fluid, with the drill fluid purification equipment configurations on transportable module.The landwaste of circulation module 2 can be transported to control module 3 through conveyer, realizes recovery, the processing of drilling cuttings, avoids contaminated environment.Circulation module 2 mainly comprises drilling fluid tank, vibrosieve, desilter, desander, associating cleaner, centrifuge, agitator, borehole pump, suction tank, landwaste conveying device etc.
Control module 3 major functions are to carry out the electric power control of relevant device on the rig primary module 1, realize the taking back and process of landwaste, landwaste are transported to the processing place of appointment by vehicle.The power source of control module 3 provides electrical power to rig primary module 1 and other equipments in power plant module 6 after control module 3.Control module 3 comprises that mainly Electric Machine Control room, well site (MCC), silicon controlled rectifier room (SCR), head pusher room, data are handled room, vertical centrifuge, landwaste conveyer, puddled jar, ash can, vibrosieve (landwaste handle with), supercentrifuge (sewerage treatment with), sewage-treatment plant etc. down.
Rig primary module 1, circulation module 2, control module 3 are sequentially arranged on the track 10, and move along track 10.Rig primary module 1, circulation module 2, control module 3 can connect earlier, in track 10 upper edge tracks 10 same moved further; Also can be separately independent, move successively at track 10 upper edge tracks 10, and after the position of rig primary module 1 is determined, again that rig primary module 1, circulation module 2, control module 3 is fixedly connected.
Power plant module 6 is positioned at outside the track 10, adopts skid or wheel load move mode.
Power plant module 6 comprises diesel generating set, auxiliary power generation unit, source of the gas and air treatment system, and major function is for each module provides electric power, and it can move along with moving of rig primary module 1.
Well cementation equipment part mainly comprises cementing equipment module 4 and well cementing material module 5, is used for well cementing operation and is positioned at outside the track 10, adopts skid or wheel load move mode.
The effect of cementing equipment module 4 is to move to well location to cement the well when needs carry out well cementing operation, when the multi-section rig is worked simultaneously, can between several mouthfuls of wells, carry out cross-operation as required, improved operating efficiency, reduce the quantity of well cementation equipment simultaneously, saved the equipment purchasing expense.Cementing equipment module 4 mainly comprises two-shipper double pump well cementation unit, manifold, water system, air supply system, pressure fan, secondary slurry mixing tank, holder, returning fluid's recovery system etc.
Well cementing material module 5 is responsible for providing well cementing material to cementing equipment module 4, mainly comprises ash can down, and the quantity of descending ash can usually is more than 2.Well cementing material module 5 moves with cementing equipment module 4.The capacity of once filling of well cementing material module 5 can satisfy the one or many well cementing operation fully, when needs replenish, can draw with the grey tank car of routine and send material to well cementing material module 5, has increased flexibility.
Ground fixedly shared module 7 mainly comprises heating equipment, drilling fluid deposit (recovery) jar, fire station, industrial water pot, industrial waste water jar, tank for gaseous or liquid substances etc., can satisfy sewage collecting, industry water conveying, insulation of equipment heating, the deposit of drilling fluid, the many mud system needs of replacing (recovery) in whole well site.Ground fixedly shared module 7 is positioned at outside the track 10, does not generally need to move in the scope in one's power at transfer line.Two rigs or multi-section rig can a shared cover ground fixing shared module 7, can reduce configuration quantity, the saving cost.
Ground fixedly shared module 7 relies on different pipelines to link to each other with rig primary module 1, circulation module 2, power plant module 6, but also water for fire can be provided.

Claims (10)

1. modular rig, comprise fixedly shared device of rig, track, sleeve pipe conveying device, rack for rods, ground, rig moves along track in orbit, sleeve pipe conveying device, rack for rods outside track with the same moved further of rig, the position of rig when work and sleeve pipe conveying device, rack for rods is fixed, ground fixedly shared device is positioned near the rig, it is characterized in that: rig primary module (1), circulation module (2), control module (3) are sequentially arranged on the track (10), and move along track (10); Power plant module (6), cementing equipment module (4), well cementing material module (5) are positioned at outside the track (10), adopt migration of combined flat plate car or skid migration; Ground fixedly shared module (7) is positioned at outside the track (10).
2. modular rig according to claim 1 is characterized in that: described rig primary module (1) comprises the control system of overhead traveling crane, derrick, base, winch, suspension system, manifold, wellhead assembly, rotating disk, manifold and water, gas, liquid, electricity.
3. modular rig according to claim 1 is characterized in that: described circulation module (2) comprises drilling fluid tank, vibrosieve, desilter, desander, associating cleaner, centrifuge, agitator, borehole pump, suction tank, landwaste conveying device.
4. modular rig according to claim 1, it is characterized in that: described control module (3) comprises that Electric Machine Control room, well site, silicon controlled rectifier room, head pusher room, data handle the room, vertical centrifuge, landwaste conveyer, puddle jar, ash can, vibrosieve, supercentrifuge, sewage-treatment plant down.
5. modular rig according to claim 1 is characterized in that: described power plant module (6) comprises diesel generating set, auxiliary power generation unit, source of the gas and air treatment system.
6. modular rig according to claim 1 is characterized in that: described cementing equipment module (4) comprises two-shipper double pump well cementation unit, manifold, water system, air supply system, pressure fan, secondary slurry mixing tank, holder, returning fluid's recovery system.
7. modular rig according to claim 1 is characterized in that: described well cementing material module (5) comprises ash can down.
8. modular rig according to claim 1 is characterized in that: described ground fixedly shared module (7) comprises heating equipment, drilling fluid conservation tank, industrial water pot, industrial waste water jar, tank for gaseous or liquid substances, fire station.
9. modular rig according to claim 1 is characterized in that: after connecting between described rig primary module (1), circulation module (2), the control module (3), in the same moved further of track (10) upper edge track (10).
10. modular rig according to claim 1 is characterized in that: described rig primary module (1), circulation module (2), control module (3) are independent separately, move successively at track (10) upper edge track (10).
CNU2006201760084U 2006-12-29 2006-12-29 Modular drilling machine Expired - Fee Related CN201003372Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2006201760084U CN201003372Y (en) 2006-12-29 2006-12-29 Modular drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2006201760084U CN201003372Y (en) 2006-12-29 2006-12-29 Modular drilling machine

Publications (1)

Publication Number Publication Date
CN201003372Y true CN201003372Y (en) 2008-01-09

Family

ID=39038909

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2006201760084U Expired - Fee Related CN201003372Y (en) 2006-12-29 2006-12-29 Modular drilling machine

Country Status (1)

Country Link
CN (1) CN201003372Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102996073A (en) * 2011-09-14 2013-03-27 中国海洋石油总公司 Small module assembled offshore platform drilling machine
CN103189591A (en) * 2010-08-25 2013-07-03 吉尔迈科股份公司 Parking and automatic handling equipment of drilling rods and associated drilling machine
CN103758453A (en) * 2014-01-23 2014-04-30 长沙精拓工程机械有限公司 Intelligent micro drilling machine
CN104440077A (en) * 2014-11-12 2015-03-25 惠生(南通)重工有限公司 Skid-mounted module drilling machine assembling method
CN104476124A (en) * 2014-11-14 2015-04-01 惠生(南通)重工有限公司 Skid-mounted type module drilling machine connection plate assembly welding method
CN109555473A (en) * 2017-09-27 2019-04-02 中国石油天然气股份有限公司 drilling method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103189591A (en) * 2010-08-25 2013-07-03 吉尔迈科股份公司 Parking and automatic handling equipment of drilling rods and associated drilling machine
CN103189591B (en) * 2010-08-25 2015-11-25 吉尔迈科股份公司 The stopping of drilling rod and automatic commanding apparatus and relevant auger
CN102996073A (en) * 2011-09-14 2013-03-27 中国海洋石油总公司 Small module assembled offshore platform drilling machine
CN103758453A (en) * 2014-01-23 2014-04-30 长沙精拓工程机械有限公司 Intelligent micro drilling machine
CN103758453B (en) * 2014-01-23 2015-09-23 长沙精拓工程机械有限公司 Intelligent microdrill
CN104440077A (en) * 2014-11-12 2015-03-25 惠生(南通)重工有限公司 Skid-mounted module drilling machine assembling method
CN104476124A (en) * 2014-11-14 2015-04-01 惠生(南通)重工有限公司 Skid-mounted type module drilling machine connection plate assembly welding method
CN109555473A (en) * 2017-09-27 2019-04-02 中国石油天然气股份有限公司 drilling method

Similar Documents

Publication Publication Date Title
CN201003372Y (en) Modular drilling machine
MY148043A (en) Use of cuttings tank for slurrification on drilling rig
CN201554369U (en) Fast-transported petroleum drilling rig capable of transporting large module integrally and automatically traveling
CN104481428B (en) Terrestrial deep drilling rig energy saving power catwalk
CN104314490A (en) Drilling machine solid control circulation system
CN109488238B (en) Multifunctional integrated drilling fluid comprehensive treatment system and method for geological drilling
CN103195431A (en) Slag tapping system and method for full face tunnel boring machine of deep vertical shaft
CN103821464B (en) Tubing string vertical vehicular full-automatic smart hydraulic workover rig
CN205638216U (en) Oil -well rig tubular column automated processing system
CN206174871U (en) From installing module ization ocean drilling rig
CN205889422U (en) A drilling equipment for drilling of bamboo piece with carry function
CN203547608U (en) Waste drilling fluid treatment device
CN103132975A (en) Gas control system used for drilling machine and gas control method thereof
CN204782862U (en) Continuous processing apparatus of oil base drill chip
CN213234928U (en) Complete equipment for controlling gas in driving strip of coal mine coal roadway
CN203685082U (en) Slurry returning device of cluster well
CN107806322B (en) A kind of pipe-following drilling device
CN206693937U (en) A kind of novel automatic hydraulic drill rig
CN210703419U (en) Heating device for installation of belt conveyor coupler
CN103132978A (en) Lifting control system of drill column of petroleum drilling machine
CN219300784U (en) Mobilizable integrated form waste heat recovery device
CN203978299U (en) Integrated form petroleum rig base
CN2674063Y (en) Gantry type engineering drilling machine
CN201258684Y (en) Wheeled rail land mobile drill
CN205477444U (en) Be applied to automatic pipe processing apparatus among drilling operation of ocean

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
COR Change of bibliographic data

Free format text: CORRECT: CO-PATENTEE TO: DAGANG OILFIELD GROUP ZHONGCHENG MECHANICAL MANUFACTURING CO., LTD. ¬

CU01 Correction of utility model patent

Correction item: Co-patentee

Correct: Dagang Oilfield Group Cheng Machinery Manufacturing Co., Ltd.

Number: 02

Page: The title page

Volume: 24

CU03 Correction of utility model patent gazette

Correction item: Co-patentee

Correct: Dagang Oilfield Group Cheng Machinery Manufacturing Co., Ltd.

Number: 02

Volume: 24

ERR Gazette correction

Free format text: CORRECT: CO-PATENTEE; FROM: NONE ¬ TO: DAGANG OILFIELD GROUP ZHONGCHENG MECHANICAL MANUFACTURING CO., LTD. ¬

ASS Succession or assignment of patent right

Free format text: FORMER OWNER: DAGANG OILFIELD GROUP, ZHONGCHENG MACHINERY MANUFACTURING CO., LTD.

Owner name: CNPC BOHAI PETROLEUM EQUIPMENT MANUFACTURING CO.,

Free format text: FORMER OWNER: DAGANG OIL FIELD GROUP CO., LTD.

Effective date: 20100906

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 300280 DAGANG OILFIELD GROUP CO., LTD., YARD 3, DAGANG OILFIELD, TIANJIN CITY TO: 300280 CHUANGANG ROAD, DAGANG OILFIELD, DAGANG DISTRICT, TIANJIN CITY

TR01 Transfer of patent right

Effective date of registration: 20100906

Address after: 300280 Tianjin City, Grand Port Dagang Oilfield Sichuan Road

Patentee after: CNPC Bohai Equipment Manufacturing Co., Ltd.

Address before: 300280 Dagang Oilfield No. three, Dagang Oilfield, Tianjin, Refco Group Ltd

Co-patentee before: Dagang Oilfield Group, Zhongcheng Machinery Manufacturing Co., Ltd.

Patentee before: Dagang Oil Field Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080109

Termination date: 20151229

EXPY Termination of patent right or utility model