CN201001178Y - Test catching line matrix equipment with business recontinuous function - Google Patents

Test catching line matrix equipment with business recontinuous function Download PDF

Info

Publication number
CN201001178Y
CN201001178Y CNU2006200446282U CN200620044628U CN201001178Y CN 201001178 Y CN201001178 Y CN 201001178Y CN U2006200446282 U CNU2006200446282 U CN U2006200446282U CN 200620044628 U CN200620044628 U CN 200620044628U CN 201001178 Y CN201001178 Y CN 201001178Y
Authority
CN
China
Prior art keywords
line
relay
test
transmission equipment
exchange transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2006200446282U
Other languages
Chinese (zh)
Inventor
金少舫
葛鸿伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINTAI COMMUNICATION TECHNOLOGY Co Ltd SHANGHAI
Original Assignee
XINTAI COMMUNICATION TECHNOLOGY Co Ltd SHANGHAI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINTAI COMMUNICATION TECHNOLOGY Co Ltd SHANGHAI filed Critical XINTAI COMMUNICATION TECHNOLOGY Co Ltd SHANGHAI
Priority to CNU2006200446282U priority Critical patent/CN201001178Y/en
Application granted granted Critical
Publication of CN201001178Y publication Critical patent/CN201001178Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a testing line grasping matrix equipment with the service continuing function. The normally closed terminal of the concatenation terminal relay of the internal line grasping relay link corresponding to each switch transmission equipment, and the normally closed terminal of the concatenation terminal relay of the external line grasping relay link of the matrix are correspondingly connected to a service continuing connection line, and the service continuing function is realized under the condition that all the relays in the two links are released. The utility model has the advantage that the sudden user service interruption when an exchanger receives a testing line grasping order can be avoided, thus guaranteeing the service quality of an operator.

Description

A kind of have the test line capture module equipment that business renews function
Technical field
The utility model relates to a kind of test line capture module equipment that business renews function that has, and when providing automatic testing service for the fixed network operator, has guaranteed the normal operation of the subscriber's line that switching equipment connected effectively, belongs to communication technical field.
Background technology
At present, the traffic growth of domestic fixed-line telephone network is still very swift and violent, and especially novel ADSL digital service, fixed telephone subscriber's sum are developing to 400,000,000 families, so the service quality of operation maintenance obtains the generally attention of vast operator.Along with the rapid rising of line clear test job amount and the line upkeep Shen announcement amount of accepting, use full-automatic integrated test system and realize that operation maintenance becomes an inevitable choice.Full-automatic integrated test system by testing the interior and exterior lines that line capture module is grabbed out, is carried out sectionalization test to local side apparatus, subscriber's line and ustomer premises access equipment as shown in Figure 1, and therefore, the test line capture module then is the necessary condition that realizes full-automatic integration test.
Test line capture module in the full-automatic integrated test system structurally divides three levels: the line capture module equipment in the exchange transmission equipment in line capture module, the local side test macro, the line capture module circuit in the test cell.
In the exchange transmission equipment, the test line capture module is arranged on exchange transmission equipment user's plate and the DSLAM separator board, every exchange transmission equipment or a pair of test bus of DSLAM equipment output two-wire system, perhaps four-wire system a pair of test bus interior lines and a pair of test bus outside line.Grab the line order by sending out, interior lines or the outside line of any one user in the equipment can be caught the test bus interface, realize that test connects to equipment.
In the local side test macro, test line capture module equipment is used for the test bus of many exchange transmission equipments and polytype exchange transmission equipment is restrained, and realizes concentrating test and management.
In test cell, test line capture module circuit is mainly used in continuing of various different test functions, has also considered the needs that the input test bus is restrained simultaneously.In less end office (EO) of some exchange transmission equipment kind, platform number such as module office etc., test macro does not need configuration testing line capture module equipment, just can finish the test jointing function with the test line capture module circuit of test cell inside.
In the operation maintenance net that the fixed network operator sets up with autorun, in order to guarantee the service quality of fixed-line telephone network operation maintenance, full-automatic integrated test system is after the exchange transmission equipment sends test command, to judge whether decision carries out next step test again to the running status of subscriber's line.The exchange transmission equipment receive grab the line order after the state information of this circuit of loopback, if line be busy, test macro will determine whether toll breakdown test.But the exchange transmission equipment that the part four-wire system is grabbed line is not automatically considered the running status of tested circuit, after equipment receives that the line order is grabbed in test, when line state information is provided, circuit is disconnected and catches on the test port.This unauthorized toll breakdown the operation tend to unexpected interrupting service, influence the service quality of operator.
Operation maintenance in the past mainly is emulation testing, and line test precision and fault location precision are all very low, and the subscriber complaint handling process is also very simple.After the full-automatic integrated test system that has adopted the multi-process that exchanges transmission equipment based on the multi-modulation scheme of grabbing line automatically, O﹠M service quality there has been higher requirement, need test line capture module equipment have the function that the subscriber's line business renews.
Summary of the invention
The purpose of this utility model provides a kind of switch of avoiding and accepts to test the business of interrupting subscriber's line when grabbing the line order suddenly, guarantees the test line capture module equipment that business renews function that has of operator's service quality.For realizing above purpose, the technical solution of the utility model provides a kind of test line capture module equipment that business renews function that has, comprise that exchanging the transmission equipment interior lines grabs line interface, line interface is grabbed in the outside line of exchange transmission equipment, test cell Internal Line Test interface, test cell Loop test interface and relay array, it is characterized in that, be connected separately in the test line capture module circuit of application with test cell at exchange transmission equipment test interface, be provided with that line relay RL101 is grabbed in interior lines and line relay RL102 is grabbed in outside line, the normal-closed end that line relay RL101 is grabbed in interior lines and outside line grab that the normal-closed end RL102 of line relay is corresponding to be connected a business and to renew connection line, form the single-stage business and renew connecting circuit, the interior lines of exchange transmission equipment are by the common port of relay R L101, normal-closed end to relay R L101, arrive the normal-closed end of relay R L102 again, by the outside line of the common port of relay R L102, realize that the business of subscriber's line renews function again to the exchange transmission equipment.
In the test line capture module equipment of multiple-input and multiple-output, it is characterized in that, adopt the multi-stage cascade business to renew connection, the input port of matrix connects exchange transmission equipment A respectively, exchange transmission equipment B, ... line interface is grabbed in the interior and exterior lines test of exchange transmission equipment n, the output port of matrix connects test cell α respectively, test cell β, ... the interior and exterior lines test input interface of test cell , it is characterized in that, grab the normal-closed end of the terminal relay of cascade of line relay link in the interior lines of each exchange transmission equipment correspondence, a business of the corresponding connection of normal-closed end of grabbing the terminal relay of cascade of line relay link with the outside line of matrix renews connection line, and employing multi-stage cascade business renews that the realization business renews function under the connecting circuit state that all relays all discharge in two links.
The utility model is grabbed the interior lines of each exchange transmission equipment correspondence the normal-closed end of the terminal relay of cascade of line relay link, a business of the corresponding connection of normal-closed end of grabbing the terminal relay of cascade of line relay link with the outside line of matrix renews connection line, and the realization business renews function under the state that all relays all discharge in two links.After equipment receives that the line order is grabbed in test, this unauthorized toll breakdown operation can interrupting service yet, guarantee the service quality of operator.
The utility model has the advantages that when avoiding switch to accept test grabs the line order and interrupt customer service suddenly, guarantee operator's service quality.
Description of drawings
Fig. 1 is full-automatic integrated test system intra-office connection diagram;
Fig. 2 has the line capture module structural representation that the single-stage business renews circuit;
Fig. 3 has the line capture module structural representation that multi-stage service renews circuit;
Fig. 4 renews the status signal schematic diagram for test line capture module business.
Embodiment
The utility model is described in further detail below in conjunction with drawings and Examples.
Have the four-wire system exchange transmission equipment of tolling breakdown operation without approval and use in a large number on the net at landline telephone,, do not have operability if the test line capture module cost of revising in the exchange transmission equipment is huge.Therefore, be configured in the test line capture module equipment in the local side test macro, perhaps be arranged on the test line capture module circuit of test cell inside, having business, to renew function just very important.
Embodiment 1
As shown in Figure 2, has a line capture module structural representation that the single-stage business renews circuit for a kind of, described have a line capture module that the subscriber's line business renews function, promptly exchange the test line capture module that transmission equipment test interface and test cell are connected separately, be provided with that line relay RL101 is grabbed in interior lines and line relay RL102 is grabbed in outside line, the normal-closed end that line relay RL101 is grabbed in interior lines and outside line grab that the normal-closed end RL102 of line relay is corresponding to be connected a business and to renew connection line, form the single-stage business and renew connecting circuit, the interior lines of exchange transmission equipment are by the common port of relay R L101, normal-closed end to relay R L101, arrive the normal-closed end of relay R L102 again, by the outside line of the common port of relay R L102, realize that the business of subscriber's line renews function again to the exchange transmission equipment.Test macro is according to the subscriber's line state information that provides of exchange transmission equipment, whether determines the attracting electric relay RL101 Internal Line Test interface that continues again, or the attracting electric relay RL102 Loop test interface that continues not, starts next step test function.
Embodiment 2
As shown in Figure 3, has a line capture module structural representation that multi-stage service renews circuit for a kind of, described have the line capture module equipment that the subscriber's line business renews function, it is the test line capture module of multiple-input and multiple-output, adopt the multi-stage cascade business to renew connection, the input port of matrix connects exchange transmission equipment A respectively, exchange transmission equipment B, ... line interface is grabbed in the interior and exterior lines test of exchange transmission equipment n, the output port of matrix connects test cell α respectively, test cell β, ... the interior and exterior lines test input interface of test cell , be provided with exchange transmission equipment A interior lines and grab the relay R L111 that line interface connects, RL113....RL11X, the relay R L112 that line interface connects is grabbed in outside line, RL114....RL11Y, be provided with exchange transmission equipment B interior lines and grab the relay R L121 that line interface connects, RL123....RL12X, the relay R L122 that line interface connects is grabbed in outside line, RL124....RL12Y, .... be provided with exchange transmission equipment N interior lines and grab the relay R L1N1 that line interface connects, RL1N3....RL1NX, the relay R L1N2 that line interface connects is grabbed in outside line, RL1N4....RL1NY, A is an example with the exchange transmission equipment, the normal-closed end that exchange transmission equipment A grabs the relay R L111 of line interface connection in interior lines, by notching relay RL113....RL11X and RL114....RL11Y, the corresponding connection of normal-closed end of grabbing the relay R L112 that line interface connects with exchange transmission equipment outside line, form a business and renew connection line, the interior lines of exchange transmission equipment are by the common port of the RL111 normal-closed end to RL111, again by the common port of RL113 normal-closed end to RL113, and the like again by the common port of RL11X normal-closed end to RL11X, connect the common port of the normal-closed end of RL11Y to RL11Y, and the like again by the normal-closed end of RL114 common port to RL114, again by the normal-closed end of RL112 common port to RL112, line interface is grabbed in the outside line that connects exchange transmission equipment A at last, exchange transmission equipment B... exchange transmission equipment N and the like, realize that the business of subscriber's line renews function.The subscriber's line state information that test macro provides according to the exchange transmission equipment, and test cell takies situation, whether determine attracting electric relay RL111 or RL113...... or the RL11X Internal Line Test interface that continues again, or attracting electric relay RL112 or RL114...... or the RL11Y Loop test interface that continues not, start next step test function.
Renew in the test line capture module of connecting circuit in the multi-stage cascade business, the relay quantity of every row equals the configuration quantity of test cell, and the relay quantity of every row is 2 times of exchange transmission equipment quantity of four-wire system test interface of continuing.
As shown in Figure 4, for test line capture module business renews the status signal schematic diagram, the exchange transmission equipment is before the line order is grabbed in acceptance test, the exchange transmission equipment of local side and the terminal equipment of user side might set up that voice service is connected or digital service connects, receive to test and grab after the line order, voice service connects or digital service connects and may be disconnected by the test line capture module of device interior, at this moment, the test line capture module circuit that is configured in the test line capture module in the office testing device or is arranged on test cell inside will renew that voice service connects or digital service connects, and guarantees the service quality of operator.

Claims (3)

1. one kind has the test line capture module equipment that business renews function, comprise that exchanging the transmission equipment interior lines grabs line interface, line interface is grabbed in the outside line of exchange transmission equipment, test cell Internal Line Test interface, test cell Loop test interface and relay array, it is characterized in that, be connected separately in the test line capture module circuit of application with test cell at exchange transmission equipment test interface, be provided with that line relay RL101 is grabbed in interior lines and line relay RL102 is grabbed in outside line, the normal-closed end that line relay RL101 is grabbed in interior lines and outside line grab that the normal-closed end RL102 of line relay is corresponding to be connected a business and to renew connection line, form the single-stage business and renew connecting circuit, the interior lines of exchange transmission equipment are by the common port of relay R L101, normal-closed end to relay R L101, arrive the normal-closed end of relay R L102 again, again by the outside line of the common port of relay R L102 to the exchange transmission equipment.
2. a kind of test line capture module equipment that business renews function that has according to claim 1, it is characterized in that, connect in the test line capture module equipment of using at multiple-input and multiple-output, adopt the multi-stage cascade business to renew connection, the input port of matrix connects exchange transmission equipment A respectively, exchange transmission equipment B, ... line interface is grabbed in the interior and exterior lines test of exchange transmission equipment n, the output port of matrix connects test cell α respectively, test cell β, ... the interior and exterior lines test input interface of test cell , be provided with exchange transmission equipment A interior lines and grab the relay R L111 that line interface connects, RL113....RL11X, the relay R L112 that line interface connects is grabbed in outside line, RL114....RL11Y, be provided with exchange transmission equipment B interior lines and grab the relay R L121 that line interface connects, RL123....RL12X, the relay R L122 that line interface connects is grabbed in outside line, RL124....RL12Y, .... be provided with exchange transmission equipment N interior lines and grab the relay R L1N1 that line interface connects, RL1N3....RL1NX, the relay R L1N2 that line interface connects is grabbed in outside line, RL1N4....RL1NY, A is an example with the exchange transmission equipment, the normal-closed end that exchange transmission equipment A grabs the relay R L111 of line interface connection in interior lines, by notching relay RL113....RL11X and RL114....RL11Y, the corresponding connection of normal-closed end of grabbing the relay R L112 that line interface connects with exchange transmission equipment outside line, form a business and renew connection line, the interior lines of exchange transmission equipment are by the common port of the RL111 normal-closed end to RL111, again by the common port of RL113 normal-closed end to RL113, and the like again by the common port of RL11X normal-closed end to RL11X, connect the common port of the normal-closed end of RL11Y to RL11Y, and the like again by the normal-closed end of RL114 common port to RL114, again by the normal-closed end of RL112 common port to RL112, line interface is grabbed in the outside line that connects exchange transmission equipment A at last, exchange transmission equipment B... exchange transmission equipment N and the like.
3. a kind of test line capture module equipment that the multi-stage user line activities renews function that has according to claim 2, it is characterized in that, renew in the test line capture module of connecting circuit in the multi-stage cascade business, the relay quantity of every row equals the configuration quantity of test cell, and the relay quantity of every row is 2 times of exchange transmission equipment quantity of four-wire system test interface of continuing.
CNU2006200446282U 2006-08-08 2006-08-08 Test catching line matrix equipment with business recontinuous function Expired - Fee Related CN201001178Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2006200446282U CN201001178Y (en) 2006-08-08 2006-08-08 Test catching line matrix equipment with business recontinuous function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2006200446282U CN201001178Y (en) 2006-08-08 2006-08-08 Test catching line matrix equipment with business recontinuous function

Publications (1)

Publication Number Publication Date
CN201001178Y true CN201001178Y (en) 2008-01-02

Family

ID=39015579

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2006200446282U Expired - Fee Related CN201001178Y (en) 2006-08-08 2006-08-08 Test catching line matrix equipment with business recontinuous function

Country Status (1)

Country Link
CN (1) CN201001178Y (en)

Similar Documents

Publication Publication Date Title
JP3905733B2 (en) Subscriber line test system and method
CN101052068B (en) Device and method for providing wet current
US8280033B2 (en) Provision of alternative telecommunication services
CN201001178Y (en) Test catching line matrix equipment with business recontinuous function
GB2432746A (en) A flexible main distribution frame arrangement for connection of subscriber loops to a digital subscriber line interface
JP3781265B2 (en) Subscriber circuit with splitter function
CN101163171B (en) Method of implementing uplink service interface protection based on access network
CN106937265A (en) A kind of method and apparatus of ship communications
CN101013970B (en) Apparatus and method for accessing digital subscriber line testing
CN1330165C (en) Numerical user loop grab wire testing device and method
CN101160819A (en) System and method of improving communication reliability
CN1306360A (en) Monitor method of signaling link
CN201069873Y (en) Test unit for built-in asymmetric digital user line
CN101094141A (en) Method and system for protecting voice channel of access network, and optical line terminal
CN100433766C (en) Serious failure fast restoring emergency method for telephone exchange terminal office
CN101094267A (en) Method for preventing abnormal super long call
CN1187946C (en) Control system used for telephone distributing frame and/or circuit switch box
CN1021006C (en) Duplex centerless frequency-deivision multiple access carrier telephone system
CN212909533U (en) N: M has low-cost optical line protection system of jam
US3488751A (en) Telecommunication exchange system with provision for special and normal facility operation through a switching network
KR960006912B1 (en) Auto-phone number service system
CN100505799C (en) 4 line N+1 backup and its detecting circuit
CN100525508C (en) Cut-in multiple connection device for digital user's line and user cut-in device
CN101247143B (en) Digital subscriber's loop test access device and method
SU849552A1 (en) Device for selective telephonic communication

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080102

Termination date: 20130808