CN200989081Y - Fast inflating arch shape tent - Google Patents

Fast inflating arch shape tent Download PDF

Info

Publication number
CN200989081Y
CN200989081Y CN 200620134274 CN200620134274U CN200989081Y CN 200989081 Y CN200989081 Y CN 200989081Y CN 200620134274 CN200620134274 CN 200620134274 CN 200620134274 U CN200620134274 U CN 200620134274U CN 200989081 Y CN200989081 Y CN 200989081Y
Authority
CN
China
Prior art keywords
tent
arch
fast aeration
gas
air inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620134274
Other languages
Chinese (zh)
Inventor
刘学凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liu Lu
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620134274 priority Critical patent/CN200989081Y/en
Application granted granted Critical
Publication of CN200989081Y publication Critical patent/CN200989081Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to a quick charging arch tent, comprising a sprayer nozzle and a plurality of air columns. The air columns are divided into a mudsill, an upper beam and an arch beam and provided with a charging port, which is characterized in that the upper beam and the arch beam is flat. The arrangement of the upper beam and the arch beam is arch and reticular. A tie rod is arranged in the air column of the upper beam and the arch beam. The charging port is connected with an air reservoir steel bottle via a check valve. A quick-discharging valve is arranged on the air reservoir steel bottle which is filled with compressed air. A mask body is arranged inside the tent. A plurality of high pressure sprayer nozzles are arranged around the mask body and a charging pool is positioned below. With the structure, a quick charging arch tent with the feature of easy-take, small volume, strong rigidity, quick forming speed, without assembly, waterproof, cold-proof and heat-proof is obtained.

Description

Fast aeration arch tent
Technical field
The utility model relates to a kind of tent, particularly a kind of high-performance tent that is used for rescue and relief work, army and open-air moulding rapidly and has the decontamination function.
Background technology
Be used for that rescue and relief work, army are camped, field encampment and tent with decontamination function, great majority adopt the steel work tents.Its structure is loaded down with trivial details, can not fast construction, use, and the quick-detach soon of finishing using if at the clutch of rescue and relief work, cause incur loss through delay the opportunity of the disaster relief probably, causes the loss of national wealth and even citizen's life security.In addition, the tent volume of steel work is big, is not easy to carry, and its ground waterproof performance is also not ideal enough.
Have again; the gas column of air filling type tent is whole circular cylinders in the prior art; overlap joint by some cylinders forms umbrella-shaped structure; because the not stationarity of its structure; cause in installation process and need install according to certain pattern, the operator installs more loaded down with trivial details, is difficult to adapt to above-mentioned indication crisis constantly; and the spray woods head that this kind tent is used for decontamination directly is arranged at circular cylinder, will note the safety factor of the quantity guarantee tent of drencher head in actual use.
The utility model content
In view of this, the purpose of this utility model be to provide a kind of easy to carry, volume is little, rigidity is big, shaping speed soon, need not assembling, the fast aeration arch tent of waterproof, winter protection, solar heat protection.
The technical scheme that the utility model fast aeration arch tent adopts is:
A kind of fast aeration arch tent includes drencher head, some gas columns, and these some gas columns are divided into bottom girder, upper beam and arched girder, and are provided with inflation inlet, and it focuses on:
This upper beam and arched girder are flat-shaped, and it is netted that this upper beam and arched girder arrangement are arch; This tent inside is linked with cover body, and this cover body periphery is provided with some high-pressure spraying heads, is provided with Inflation water pond below.
In addition, be provided with lacing wire in this upper beam and the arched girder gas column.
These some gas column bending part invaginations are adhesively fixed and are bonded as one mutually.
This inflation inlet is connected with the gas storage steel cylinder by one way valve, and this gas storage steel cylinder is provided with quick release valve, and inside is filled with Compressed Gas.
One way valve is connected with the gas storage steel cylinder by the jet absorption type charge valve.
This jet absorption type charge valve is provided with air inlet port and reaches air inlet port down, and air inlet port reaches down on this has spacing between air inlet port, and last air inlet port diameter is less than the following gas port that taps into, and this jet absorption type charge valve back is provided with some suction air inlet through holes.
This spacing is 5mm.
This cover body is a pentahedron, and it hang on tent inner upper end 1/3rd places.
Be bonded with mine dam around this Bottom of tent.
This inflation inlet connects the pressure-vaccum blower fan.
The beneficial effects of the utility model are: volume is little, is easy to carry, and adopts integrally formed arch net structure, need not assembling; Be provided with the gas storage steel cylinder and carry out major advantage, the quantity of carrying gas cylinder can be reduced half if increase radio suction valve not having under the situation of power supply and can making the tent moulding in 2 minutes in inflation; Can utilize electronic pressure-vaccum blower fan that tent is inflated, this kind method cost is low, with after tent can carry out air-breathing recovery to tent with the pressure-vaccum blower fan, accelerate to reclaim the speed of tent; What the flat gas column made tent utilizes the space big, is provided with lacing wire in the flat gas column and can strengthens gas column rigidity, and this shape production technology can be used high frequency heat seal technology, is convenient to mechanization production, reduces manual viscose glue operation; Its drencher head directly is installed on the cover body that is arranged at tent inside, assembling, convenient disassembly; This tent inside is provided with one deck cover body, and the bottom is provided with the mine dam structure, makes it to become to have extraordinary waterproof, and solar heat protection, anti-cold effect are highly suitable for the high-performance tent of fire-fighting, decontamination, army's rescue and relief work.
Description of drawings
Fig. 1 is the structural representation of the utility model fast aeration arch tent;
Fig. 2 is the inflated condition schematic diagram of the utility model fast aeration arch tent;
Fig. 3 is the front view after the utility model fast aeration arch tent removes paulin;
Fig. 4 is the A-A direction partial sectional view of the utility model fast aeration arch tent;
Fig. 5 is the B-B direction partial sectional view of the utility model fast aeration arch tent;
Fig. 6 is the cross section lacing wire schematic diagram of the utility model upper beam arched girder and arched girder.
The specific embodiment
The specific embodiment of the utility model fast aeration arch tent, as Fig. 1-shown in Figure 5, include drencher head 7, some gas columns 1, these some gas columns 1 are divided into bottom girder 11, upper beam 12 and arched girder 13, and are provided with inflation inlet 2, it focuses on: this upper beam 12 is flat-shaped with arched girder 13, it is netted that this upper beam 12 and arched girder 13 arrangements are arch, can increase the space in the tent, can strengthen the daylighting type of tent structure and the rigidity of gas column again, what make tent integral body utilizes the space bigger, and safety is better.In addition, can be provided with lacing wire 14 in upper beam 12 and the arched girder 13, strengthen the stability of tent integral body, strengthen gas column rigidity.This shape production technology can be used high frequency heat seal technology, is convenient to mechanization production, reduces manual viscose glue operation.Wherein, these some gas column 1 bending part invaginations are adhesively fixed and are bonded as one mutually, and pressing in this gas column 1 is that 0.15~0.20Kpa is advisable.The inflation inlet 2 of the setting of this gas column, in this specific embodiment, this inflation inlet 2 is connected with one way valve 3, and this one way valve 3 is connected with jet absorption type charge valve 4, this jet absorption type charge valve is sealedly connected with gas storage steel cylinder 5, this gas storage steel cylinder is provided with quick release valve 51, is filled with Compressed Gas in this gas storage steel cylinder 5.This jet absorption type charge valve is provided with air inlet port 40 and reaches air inlet port 42 down, should go up air inlet port 40 and between the air inlet port 42 spacing H be arranged down, in the present embodiment, this spacing is 5mm, the diameter of last air inlet port 40 can be less than the following diameter that taps into gas port 42, and these jet absorption type charge valve 4 back are provided with some suction air inlet through holes 41.
In use, gas storage steel cylinder 5 is inflated in gas column, gas is by jet absorption type charge valve 4, utilization is penetrated and is inhaled principle the gas in the airspace is sucked in the gas column, can increase aeration quantity and improve aeration speed again, can also filling arbon dioxide gas so that slow down the harm that low temperature causes to material, do not having under the situation of power supply and can make the tent moulding in 2 minutes in inflation, and, utilize jet absorption type charge valve 4, can be so that the quantity of gas storage steel cylinder 5 reduces half.Certainly, if directly inflate, can finish the inflation work of this tent equally with 5 pairs of tents of gas storage steel cylinder.
When inflation, can also utilize pressure-vaccum blower fan 20, to strengthen its inflation effect, the pressure-vaccum blower fan is to select 2.8M 3The pressure-vaccum blower fan of/min, 20KPa is advisable; This kind method cost is low, and the tent after using can carry out air-breathing recovery to tent with the pressure-vaccum blower fan, accelerates to reclaim the speed of tent.
As shown in Figure 3-Figure 5, / 3rd places in above-mentioned tent inner upper end, be linked with a cover body 6, this cover body 6 is a pentahedron, cover body 6 peripheries are provided with some high-pressure spraying heads 7, are provided with Inflation water pond 8 below, and the fire fighter and the on-the-spot personnel that enter the contact hazardous chemical in the cover carry out decontamination, poisonous sewage falls in the Inflation water pond 8, and is destroyed concentrating in this sewage suction waste water bag by pump.
In addition, bonding mine dam (not indicating among the figure) around this Bottom of tent is to strengthen the waterproof of tent, insulation effect.
In addition, wherein the tent tarpaulin is not less than 420D, breaking strength warp-wise 〉=1600N, broadwise 〉=1350N, hydrostatic pressing 〉=16KPa for the water proof fire retardant chemical fibre.
This practical fast aeration arc tent Yu the Zhang of Xian You paulin Xiang ratio, Xin Xing volume Xiao is convenient to The Xie band adopts integrally formed Arch Reticulated Zhuan structure, no Xu Zu Zhuan, and it adopts jet absorption type to fill Air valve, Zai carries the notice of gas atmosphere Zhi can be connect by steel cylinder and pours into the Zhang paulin, and bilayer fills Gas, the rapid-result Xing of Xun; Its spray head Zhi is hinged with and is located on the Zhao body that is arranged at Zhang paulin inside, Zu Zhuan, Convenient disassembly; This Zhang paulin inside is provided with one deck Zhao body, and the bottom is provided with the mine dam structure, makes it into Wei having extraordinary waterproof, solar heat protection, anti-cold Xiao fruit are highly suitable for that Xiao is anti-, Xi Xiao, army The high-performance Zhang paulin of team's rescue and relief work.

Claims (10)

1, a kind of fast aeration arch tent includes drencher head, some gas columns, and these some gas columns are divided into bottom girder, upper beam and arched girder, and are provided with inflation inlet, it is characterized in that:
This upper beam and arched girder are flat-shaped, and it is netted that this upper beam and arched girder arrangement are arch;
This tent inside is linked with cover body, and this cover body periphery is provided with some high-pressure spraying heads, is provided with Inflation water pond below.
2, fast aeration arch tent as claimed in claim 1 is characterized in that: be provided with lacing wire in this upper beam and the arched girder gas column.
3, fast aeration arch tent as claimed in claim 1 is characterized in that: these some gas column bending part invaginations are adhesively fixed and are bonded as one mutually.
4, fast aeration arch tent as claimed in claim 1, it is characterized in that: this inflation inlet is connected with the gas storage steel cylinder by one way valve, and this gas storage steel cylinder is provided with quick release valve, and inside is filled with Compressed Gas.
5, fast aeration arch tent as claimed in claim 4 is characterized in that: one way valve is connected with the gas storage steel cylinder by the jet absorption type charge valve.
6, fast aeration arch tent as claimed in claim 5, it is characterized in that: this jet absorption type charge valve is provided with air inlet port and reaches air inlet port down, should go up air inlet port and between the air inlet port spacing be arranged down, last air inlet port diameter is less than the following gas port that taps into, and this jet absorption type charge valve back is provided with some suction air inlet through holes.
7, fast aeration arch tent as claimed in claim 6, it is characterized in that: this spacing is 5mm.
8, fast aeration arch tent as claimed in claim 1, it is characterized in that: this cover body is a pentahedron, it hang on tent inner upper end 1/3rd places.
9, fast aeration arch tent as claimed in claim 1 is characterized in that: be bonded with mine dam around this Bottom of tent.
10, fast aeration arch tent as claimed in claim 1 is characterized in that: this inflation inlet connects the pressure-vaccum blower fan.
CN 200620134274 2006-11-06 2006-11-06 Fast inflating arch shape tent Expired - Fee Related CN200989081Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620134274 CN200989081Y (en) 2006-11-06 2006-11-06 Fast inflating arch shape tent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620134274 CN200989081Y (en) 2006-11-06 2006-11-06 Fast inflating arch shape tent

Publications (1)

Publication Number Publication Date
CN200989081Y true CN200989081Y (en) 2007-12-12

Family

ID=38940117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620134274 Expired - Fee Related CN200989081Y (en) 2006-11-06 2006-11-06 Fast inflating arch shape tent

Country Status (1)

Country Link
CN (1) CN200989081Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101591991A (en) * 2009-06-29 2009-12-02 中国人民解放军总后勤部建筑工程研究所 Integral modularized inflatable shower tent
CN102409894A (en) * 2011-08-18 2012-04-11 北京紫光元恒科技有限公司 Folding air rib structure of inflatable tent
CN103306535A (en) * 2012-03-07 2013-09-18 张沛 Inflatable tent
CN108150927A (en) * 2017-12-25 2018-06-12 重庆东登科技有限公司 Air dome lighting system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101591991A (en) * 2009-06-29 2009-12-02 中国人民解放军总后勤部建筑工程研究所 Integral modularized inflatable shower tent
CN102409894A (en) * 2011-08-18 2012-04-11 北京紫光元恒科技有限公司 Folding air rib structure of inflatable tent
CN103306535A (en) * 2012-03-07 2013-09-18 张沛 Inflatable tent
CN108150927A (en) * 2017-12-25 2018-06-12 重庆东登科技有限公司 Air dome lighting system

Similar Documents

Publication Publication Date Title
CN200989081Y (en) Fast inflating arch shape tent
CN209065417U (en) A kind of double military Miniature oxygenerator used
CN105109687B (en) A kind of novel agricultural spray unmanned plane
CN105155570A (en) Communication pole tower with steel tube pile as foundation
CN208404354U (en) One kind is portable to facilitate device
CN110379951A (en) A kind of novel power battery top cover
CN201599174U (en) Structure of inflatable gas bag of inflatable material
CN210033750U (en) Inflation device capable of realizing constant pressure and suitable for different ball types
CN206108379U (en) Glass board carrier
CN206342830U (en) A kind of Multifunctional city main-battle firefighting truck
CN203036239U (en) Gas pressure energy storage emergency system
CN215862887U (en) High-pressure hydrogen storage tank with non-return protection function
CN113323022B (en) Well lid device for municipal works
CN201668910U (en) Rural lightweight multifunctional fire trailer
CN102446468B (en) Large-size lightbox ball
CN209383377U (en) A kind of explosion-proof prize-mounted refueling device of anticollision
CN114483161A (en) Coal mine drilling gas spraying prevention device and construction method
CN207128822U (en) A kind of portable vehicle emergency disaster relief waterproofing protection air cushion
CN2790230Y (en) Inflatable umbrella
CN207063683U (en) A kind of fast aeration tent
CN206477968U (en) A kind of portable inflator pump
CN210827070U (en) Steel membrane connecting structure of combined type inflatable floating bridge
CN206279865U (en) One kind is exempted to build Portable aerating tent
CN210584333U (en) Circumferentially distributed combined adsorption tower
CN212300146U (en) Hole sealing device for carbon dioxide blasting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LIU LU

Free format text: FORMER OWNER: LIU XUEFAN

Effective date: 20110513

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110513

Address after: 101100 No. 2, new industry, Yongshun Town, Beijing, Tongzhou District

Patentee after: Liu Lu

Address before: 101100 No. 2, new industry, Yongshun Town, Beijing, Tongzhou District

Patentee before: Liu Xuefan

DD01 Delivery of document by public notice

Addressee: Liu Lu

Document name: Notification of Passing Examination on Formalities

DD01 Delivery of document by public notice

Addressee: Liu Lu

Document name: Notification to Pay the Fees

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071212

Termination date: 20111106