CN200968444Y - Device for putting down pipeline - Google Patents

Device for putting down pipeline Download PDF

Info

Publication number
CN200968444Y
CN200968444Y CN 200620147588 CN200620147588U CN200968444Y CN 200968444 Y CN200968444 Y CN 200968444Y CN 200620147588 CN200620147588 CN 200620147588 CN 200620147588 U CN200620147588 U CN 200620147588U CN 200968444 Y CN200968444 Y CN 200968444Y
Authority
CN
China
Prior art keywords
pipeline
pipeline installation
pipe
installation machine
walking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620147588
Other languages
Chinese (zh)
Inventor
梅广庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum Pipeline Bureau Co Ltd
Original Assignee
China Petroleum Pipeline Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum Pipeline Bureau Co Ltd filed Critical China Petroleum Pipeline Bureau Co Ltd
Priority to CN 200620147588 priority Critical patent/CN200968444Y/en
Application granted granted Critical
Publication of CN200968444Y publication Critical patent/CN200968444Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a pipe installation machine used in the liquid and gas conveying pipeline installation works, in particular to a pipeline installation machine. The pipeline installation machine consists of a hanger (1), an arc hanger arm (2), an axle (3), a triangle symmetrical suspension bridge (4), a connecting rod (5), a pipe traveling and towing wheel (6), a natural rubber tire (7) and a joining chain (8) as well as a bearing support (9). When installing a long pipeline, a lifting hook of a crane is just moved; and the pipe traveling and towing wheel on the pipeline installation machine moves to a proper position on the pipeline to continue the pipeline installation. The pipeline installation machine moves the pipeline into the pipeline trough safely and quickly, which saves a large number of working hours, improves the security of the operation staff, reduces the production cost, raises the working efficiency, and is suitable for various liquid and gas conveying pipeline installation works.

Description

Pipe device under the pipeline
Technical field
The utility model relates to pipe device under following pipe device, the especially pipeline that uses in various liquid, the gas transport piping erection engineering.
Prior art
At present, in the construction of various liquid, gas transport piping erection engineering, when pipeline being transferred in the channel pipe trench, all adopt traditional suspender belt that pipeline is managed down; The mode of this pipeline down especially needing constantly manual position of moving suspender belt on the pipeline in the long pipeline down, has so been wasted the operating time than trouble, also makes the loosening operator's of threat of suspension hook health safety easily; And better descend the method for pipeline and utensil also not to occur.
Summary of the invention
Goal of the invention of the present utility model is: invented pipe device under a kind of pipeline that can safely and fast pipeline be lowered in the channel pipe trench, this time pipe device can be saved a large amount of operating times, has improved operator's personal safety; To achieve these goals, the pipe device is achieved in that the pipe device is made up of suspension bracket, arc arm, axle, triangular symmetry suspension bridge, connecting rod, walking hauling pipe wheel, natural rubber tire, connection chain and bearing wheels support under the pipeline under the utility model pipeline; It is characterized in that: on the arc arm, suspension bracket is arranged, connect two triangular symmetry at the two ends of arc arm respectively by axle and hang bridge; Three joint connection chains are installed respectively on triangular symmetry suspension bridge, two connecting rods are arranged in the middle of connection chain; The bearing wheels support that has 12 walking hauling pipe wheels is installed on connection chain; Be installed on the walking hauling pipe wheel on the bearing wheels support and hang with the natural rubber tire.The utility model colludes on suspension bracket with the suspension hook on the hoist in use, and pipe device under the pipeline is enclosed within on the pipeline that will transfer installation, and the suspension hook that rises then on the hoist is transferred to pipeline in the place that needs; When transferring the pipeline that length is installed, just passable as long as the suspension hook of hoist moves, the walking hauling pipe on the pipe device is taken turns the correct position that just can move to pipeline under the pipeline like this, continues to manage down operation task.The pipe device can be lowered into pipeline in the channel pipe trench safely and fast under the utility model pipeline, save a large amount of operating times, improved operator's personal safety, reduced cost of production, improve working efficiency, be suitable for various liquid, gas transport piping erection engineering.
Description of drawings
Accompanying drawing is the structural representation of pipe device under the pipeline.
Embodiment
Below with reference to the accompanying drawings (as shown in the figure) pipe device under the utility model pipeline is described further: the pipe device hangs bridge 4, connecting rod 5, walking hauling pipe wheel 6, natural rubber tire 7, connection chain 8 and carrying support 9 by suspension bracket 1, arc arm 2, axle 3, triangular symmetry and forms under the pipeline; Suspension bracket 1 at first is installed on arc arm 2, by axle 3 two triangular symmetry is installed respectively at the two ends of arc arm 2 again and hangs bridge 4; Three joint connection chains 8 are installed respectively on triangular symmetry suspension bridge 4, two connecting rods 5 are installed in the middle of connection chain 8; Last again at the carrying support of installing on the connection chain 89, walking hauling pipe wheel 6 is installed on the carrying support, hang with natural rubber tire 7 on the walking hauling pipe wheel 6.

Claims (2)

1, the pipe device is made up of suspension bracket (1), arc arm (2), axle (3), triangular symmetry suspension bridge (4), connecting rod (5), walking hauling pipe wheel (6), natural rubber tire (7), connection chain (8) and carrying support (9) under a kind of pipeline; It is characterized in that: suspension bracket (1) is arranged on arc arm (2), connect two triangular symmetry at the two ends of arc arm (2) respectively by axle (3) and hang bridge (4); Three joint connection chains (8) are installed respectively on triangular symmetry suspension bridge (4), two connecting rods (5) are arranged in the middle of connection chain (8); Go up the bearing wheels support (9) that installation has 12 walking hauling pipes wheels (6) at connection chain (8).
2, pipe device under the pipeline according to claim 1 is characterized in that: be contained on the walking hauling pipe wheel (6) on the bearing wheels support (9) and hang with natural rubber tire (7).
CN 200620147588 2006-10-29 2006-10-29 Device for putting down pipeline Expired - Fee Related CN200968444Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620147588 CN200968444Y (en) 2006-10-29 2006-10-29 Device for putting down pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620147588 CN200968444Y (en) 2006-10-29 2006-10-29 Device for putting down pipeline

Publications (1)

Publication Number Publication Date
CN200968444Y true CN200968444Y (en) 2007-10-31

Family

ID=38968016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620147588 Expired - Fee Related CN200968444Y (en) 2006-10-29 2006-10-29 Device for putting down pipeline

Country Status (1)

Country Link
CN (1) CN200968444Y (en)

Similar Documents

Publication Publication Date Title
CN201818251U (en) Drilling pipe automatic delivery device directly driven by oil cylinder
CN204917742U (en) Portable portal crane is used in piping erection
CN201971604U (en) Lifting appliance for detachable well shutter
CN207030272U (en) A kind of rollgang suitable for steel pipe transmission
CN102730609B (en) Lifting appliance for detachable well cover
CN200968444Y (en) Device for putting down pipeline
CN202080841U (en) Forking-and-suspending dual-purpose vehicle
CN204186314U (en) For the induction system that drilling rod or sleeve pipe are carried
CN203352045U (en) Drainage wiring ladder
CN204510777U (en) Converter building construction lift platform
CN208265708U (en) A kind of oil pipe installation auxiliary mould
CN103145048A (en) Cement brick loader
CN201738840U (en) Steel continuous oil pumping rod operation vehicle
CN210564413U (en) Handling device of sleeve pipe and drilling rod
CN2583064Y (en) Surround tyre type wheel slings
CN208054723U (en) A kind of Pipe installing application c-type suspension hook
CN201297444Y (en) Tube fixer
CN201686404U (en) Special suspension device for coiled material
CN204752046U (en) On --spot hoist and mount are with two steps of towers
CN205762959U (en) The rearmounted dolly of seamless steel tube production perforating machine
CN204917629U (en) Steel bottle hoist device
CN110306805B (en) Top pump structure combined with tower crane
CN213085196U (en) Portable concrete pipeline lifting device capable of being quickly assembled and disassembled
CN201592944U (en) Tubular pile steel cage gripping apparatus
CN211139356U (en) Pipeline transport vehicle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071031

Termination date: 20141029

EXPY Termination of patent right or utility model