CN200961265Y CN 200620076872 CN200620076872U CN200961265Y CN 200961265 Y CN200961265 Y CN 200961265Y CN 200620076872 CN200620076872 CN 200620076872 CN 200620076872 U CN200620076872 U CN 200620076872U CN 200961265 Y CN200961265 Y CN 200961265Y
Authority
CN
China
Prior art keywords
piece
assembly
component
tower crane
connecting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620076872
Other languages
Chinese (zh)
Inventor
从卫民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620076872 priority Critical patent/CN200961265Y/en
Application granted granted Critical
Publication of CN200961265Y publication Critical patent/CN200961265Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a gross area receiving stress concrete prefabricated sectioned multiple use tower engine foundation, including a combination of concrete precast products, a connecting and tightening device for the combination, shearing resistant piece and a tower engine fixing mechanism. The combination is formed by a centerpiece, a transition piece, a tail piece, a middle counterweight piece, and a fringe torsion resistant counterweight piece. The combination also includes a component of force girder on its top, and a back-up provided between the component of force girder and the surface of the combination. The component of force girder is symmetrically mounted at two sides of the cam girder of the transition piece and of the tail piece; the component of force girder, the transition piece, and the tail piece are connected via linkage unit. The utility model need not to provide a hole on the cam girder of the transition piece and of the tail piece to pass the component of force girder; it only need to provide a connecting hole to connect bolt or pass the steel strand. Because the diameter of the connecting hole is very small, it will not affect the bearing stress ability of the cam. The utility model greatly increases the weight bearing capacity of the tower engine fundament.

Description

The stressed concrete precast assembly of a kind of gross area is used foundation for tower crane more
Technical field:
The utility model relates to construction implement and installs and fixes the concrete basis, relates to the concrete precast assembly particularly and uses foundation for tower crane more.
Background technology:
At present, in building operations, the concrete precast assembly is used foundation for tower crane more, to have a site operation cycle short because of it, and demolition, installation, fortune are convenient and swift, non-environmental-pollution, the No Assets waste, and can improve the utilization ratio of tower machine and the use cost of saving the tower machine, and generally be subjected to attention in the industry, applied in many areas.The inventor had submitted the many parts of patent applications of using foundation for tower crane about the concrete precast assembly to over the past two years, prior art further improvement and innovation have been done, as improvement to the coupling arrangement of foundation for tower crane assembly, design to the fixing position, many assembling bolts hole of tower machine, dispose antitorque counterweight, and to improvement of basic stress situation etc., make concrete precast assembly foundation for tower crane further obtain perfect, especially to the improvement of basic stress situation, improved the lifting surface area (that is weight capacity) of foundation for tower crane greatly, made its range of application wider.But this technical scheme when improving its lifting surface area, inevitably influences the protruding beam stress ability of composite member owing to perforate on the protruding beam of composite member is bigger.
Summary of the invention;
The technical problems to be solved in the utility model is: provide the stressed concrete precast assembly of a kind of gross area to use foundation for tower crane more, when effectively improving basic stress area (that is weight capacity), do not influence protruding beam stress ability.
The utility model is achieved through the following technical solutions: the stressed concrete precast assembly of a kind of gross area is used foundation for tower crane more, the assembly that comprises concrete prefabricated member, the connection fastener of assembly, shearing resistance part and tower machine fastening devices, described assembly is made of central part, transition piece, extremity piece, the antitorque counterweight of middle counterweight and edge, described assembly also comprises the component beam that is provided with on it, and set backing plate between component beam and the assembly surface; Described component beam is symmetricly set in the protruding beam both sides of transition piece, extremity piece, is connected by linkage between component beam and transition piece, the extremity piece.
Beneficial effect:
The utility model need not have the hole of passing for the component beam on the protruding beam of transition piece, extremity piece, get final product and only need leave the connecting hole that supplies connecting bolt or steel hinge line to pass, because this connecting hole diameter is very little, protruding beam stress ability is had no effect.The utility model can make the foundation for tower crane entire area stressed the stressed middle counterweight and the antitorque counterweight in edge of passing to effectively of foundation for tower crane assembly, has improved the weight capacity of foundation for tower crane greatly.The basis of same area, both can be used for little tonnage tower machine, also can adopt the technical program to be adapted to large-tonnage tower machine, thereby in cost that does not increase the large-tonnage foundation for tower crane and construction cost, the utility model also have simple, convenient advantage flexibly.
Description of drawings:
Fig. 1 is the utility model schematic top plan view.
Fig. 2 is the A-A face sectional view of Fig. 1.
The specific embodiment:
Embodiment one:
As shown in Figure 1, how the stressed concrete precast assembly of a kind of gross area is a concrete precast assembly body with foundation for tower crane, and integral body is anistree windmill shape, and component beam 6 is symmetricly set in transition piece 2, extremity piece 3 protruding beam both sides; Be arranged at termination, component beam 6 two ends on the transition piece 2 be pressed in the middle of the surface of counterweight 4, be arranged at the surface that termination, component beam 6 two ends on the extremity piece 3 is pressed in the antitorque counterweight 5 in edge.The center line both sides of counterweight 4 or the antitorque counterweight 5 in edge in the middle of component beam 6 adjacent terminations, two ends are positioned at.Component beam 6 and middle counterweight 4 or and the surface of the antitorque counterweight 5 in edge between be provided with backing plate 7, the three is closely pressed together on together.
As shown in Figure 2, be respectively arranged with connecting hole 8, be parallel to component beam 6 axis and be provided with connecting hole 9 perpendicular to the protruding beam of transition piece 2, extremity piece 3.Bolt passes connecting hole 8, connecting hole 9, with nut transition piece 2 or extremity piece 3 is connected and fixed on component beam 6.
Embodiment two:
As shown in Figure 2, be respectively arranged with connecting hole 8, be parallel to component beam 6 axis and be provided with connecting hole 9 perpendicular to the protruding beam of transition piece 2, extremity piece 3.Steel hinge line passes connecting hole 8, connecting hole 9, with anchor clamp transition piece 2 or extremity piece 3 is connected and fixed on (diagram is not provided) with component beam 6.All the other are implemented as embodiment one.
The stressed concrete precast assembly of a kind of gross area is as shown in Figure 1 used foundation for tower crane more, and its stress-bearing capability improves more than 30% than the foundation for tower crane that does not add component beam 6.

Claims (3)

1, the stressed concrete precast assembly of a kind of gross area is used foundation for tower crane more, the assembly that comprises concrete prefabricated member, the connection fastener of assembly, shearing resistance part and be arranged at tower machine fastening devices on the assembly, described assembly is by central part (1), transition piece (2), extremity piece (3), middle counterweight (4) and edge counterweight (5) constitute, described assembly also comprises the component beam (6) that is provided with on it, and set backing plate (7) between component beam (6) and the assembly surface, it is characterized in that: component beam (6) is symmetricly set in transition piece (2), the protruding beam both sides of extremity piece (3), component beam (6) and transition piece (2), extremity piece connects by linkage between (3).
2, the stressed concrete precast assembly of a kind of gross area as claimed in claim 1 is used foundation for tower crane more, it is characterized in that: described linkage is bolt or connects for steel hinge line passes connecting hole.
3, the stressed concrete precast assembly of a kind of gross area as claimed in claim 2 is used foundation for tower crane more, it is characterized in that: the connecting hole (8) that described connecting hole is provided with for the protruding beam perpendicular to transition piece (2), extremity piece (3), the connecting hole (9) that is parallel to the setting of component beam (6) axis.
CN 200620076872 2006-08-21 2006-08-21 Whole area stress concrete prefabricated spliced multiple tower crane base Expired - Lifetime CN200961265Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620076872 CN200961265Y (en) 2006-08-21 2006-08-21 Whole area stress concrete prefabricated spliced multiple tower crane base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620076872 CN200961265Y (en) 2006-08-21 2006-08-21 Whole area stress concrete prefabricated spliced multiple tower crane base

Publications (1)

Publication Number Publication Date
CN200961265Y true CN200961265Y (en) 2007-10-17

Family

ID=38797774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620076872 Expired - Lifetime CN200961265Y (en) 2006-08-21 2006-08-21 Whole area stress concrete prefabricated spliced multiple tower crane base

Country Status (1)

Country Link
CN (1) CN200961265Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101619578B (en) * 2009-08-03 2011-02-09 赵正义 Vertical combined base of concrete prefabricated parts of mast type mechanical equipment
CN101503880B (en) * 2009-03-02 2011-12-21 赵正义 Large combined base with mast type structure
CN102296626A (en) * 2011-05-18 2011-12-28 从卫民 Multi-combination foundation bolt hole of concrete prefabricating and assembling crane base
US8522507B2 (en) 2009-06-24 2013-09-03 Mitsubishi Heavy Industries, Ltd. Concrete platform production process, concrete platform, and connecting member

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101503880B (en) * 2009-03-02 2011-12-21 赵正义 Large combined base with mast type structure
US8522507B2 (en) 2009-06-24 2013-09-03 Mitsubishi Heavy Industries, Ltd. Concrete platform production process, concrete platform, and connecting member
CN102333625B (en) * 2009-06-24 2013-10-09 三菱重工业株式会社 Method for producing concrete trestle, concrete trestle, and connecting member
CN101619578B (en) * 2009-08-03 2011-02-09 赵正义 Vertical combined base of concrete prefabricated parts of mast type mechanical equipment
CN102296626A (en) * 2011-05-18 2011-12-28 从卫民 Multi-combination foundation bolt hole of concrete prefabricating and assembling crane base

Similar Documents

Publication Publication Date Title
CN200961265Y (en) Whole area stress concrete prefabricated spliced multiple tower crane base
CN101033646A (en) Reinforcement method for reinforced concrete beam plate
CN208455444U (en) A kind of insert fenestration Lamb wave shape steel web combination beam connector
CN2633997Y (en) Steel bar concrete prefabricated plate with rib
CN201095829Y (en) Shearing-resistant connecting component
CN2769350Y (en) Whole-area forced concrete precasting assembling multifunction tower machine foundation
CN205688575U (en) Oblique seam formula assembly concrete member connection structure that shears
CN1560369A (en) Connecting method for rigid joint of steel girdle and concrete bridge pier
CN2727246Y (en) Small concrete precast split multipurpose tower crane foundation
CN202090293U (en) T-shaped beam bridge steel plate wrapping and reinforcing structure
CN201924271U (en) Fully-welded integral node
CN2908607Y (en) Hoop type guardrail bracket
CN201460022U (en) Cold bending thin-wall welded steel truss purline
CN202416151U (en) Transverse connection structure of detachable composite bridge section components
CN2661809Y (en) nternal force adjustable prestressed steel-concrete combination beam
CN212336330U (en) Shear connector for wood-concrete composite structure
CN2858841Y (en) Improved structure of section steel
CN112591599A (en) Anti-fatigue prestressed variable-section steel crane beam and manufacturing method thereof
CN2903183Y (en) Multipurpose tower crane base for large middle type concrett precase slab assembling
CN200955153Y (en) Safety device for balancing concrete prefabricated assembling tower machine foundation forced
CN2663559Y (en) Reinforced concrete prefabricated part plate with ribs
CN2743448Y (en) Composition board of bidirection force pressed steel plate and concrete
CN209053444U (en) Steel construction purlin hoisting device
CN201932850U (en) Integral balance arm of tower crane
CN217948829U (en) Multilayer prestressing force carbon cloth anchor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090109

Address after: No. 18 Middle South Road, Haian County, Nantong City, Jiangsu Province, China: 226600

Patentee after: Jiangsu Suzhong Construction Group Co., Ltd.

Address before: Institute of Surveying and mapping, Xinmin East Road, Jiangsu, Huaian, China: 223002

Patentee before: Cong Weimin

ASS Succession or assignment of patent right

Owner name: JIANGSU PROVINCE SUZHONG CONSTRUCTION GROUP CO., L

Free format text: FORMER OWNER: CONG WEIMIN

Effective date: 20090109

CX01 Expiry of patent term

Granted publication date: 20071017