CN200955372Y - Oil-water well hydraulic first-aid injection apparatus - Google Patents

Oil-water well hydraulic first-aid injection apparatus Download PDF

Info

Publication number
CN200955372Y
CN200955372Y CN 200620009687 CN200620009687U CN200955372Y CN 200955372 Y CN200955372 Y CN 200955372Y CN 200620009687 CN200620009687 CN 200620009687 CN 200620009687 U CN200620009687 U CN 200620009687U CN 200955372 Y CN200955372 Y CN 200955372Y
Authority
CN
China
Prior art keywords
blockage
water well
oil water
control device
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620009687
Other languages
Chinese (zh)
Inventor
孙永壮
何牛仔
杜丙国
游兴友
满德金
吕凤平
秦龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Downhole Operation Co of Sinopec Shengli Oilfield Co
Original Assignee
Downhole Operation Co of Shengli Petroleum Administration
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Downhole Operation Co of Shengli Petroleum Administration filed Critical Downhole Operation Co of Shengli Petroleum Administration
Priority to CN 200620009687 priority Critical patent/CN200955372Y/en
Application granted granted Critical
Publication of CN200955372Y publication Critical patent/CN200955372Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses a hydraulic spew-rescue for the oil well in the petroleum industry applied to stop the spew of the well liquid in the well operation procedure, which is composed of a hydraulic locking organ and a blockage organ. The hydraulic locking organ is sleeved in the blockage organ, and the device is sleeved on the hoop of the wellhead. When the liquid is spewing within the well, the product can be rapidly arranged on the wellhead to validly stop the blowout and avoid the loss of the original oil and loss of life and personal injury with a high safety. The utility model is of a simple structure and a low production cost, which can rescue the blowout timely and provides obvious economical and social benefits.

Description

A kind of oil water well hydraulic blowout control device
Technical field
The utility model relates to the downhole operation equipment of petroleum industry, and particularly a kind of oil water well hydraulic blowout control device prevents well liquid to gush when being used for oil, well job execution.
Background technology
The oil of petroleum industry, well are when workover treatment, and producing well particularly, the producing well borehole pressure that has raise suddenly sometimes, have little time to install control head, and borehole fluid just begins to be sprayed onto ground.As untimely installing wellhead control device, gas blowout accident will take place, cause great life and property loss.The producing well that has is in production or stopping production process for a long time, wellhead assembly is impaired, regulating gate fits badly, cause well head four-way bypass thorn to leak, gas blowout accident takes place, or owing to the destruction of thief to wellhead assembly, by-pass valve control is stolen, after borehole pressure raises, well head crude oil out of control also can occur and run off, gas blowout accident takes place.The on-the-spot at present control head complex structure that uses, function is low, thick heaviness is installed inconvenience, causes danger easily in the installation process, bad adaptability, set-up time is long, can not in time control well head, does not satisfy the requirement of robbing spray fast, occur gas blowout accident easily, cause the economic loss that to estimate.
Summary of the invention
The purpose of this utility model is a kind of oil water well hydraulic blowout control device of design, can be installed in well head quickly and easily when blowout occurring or the blowout sign is arranged, and in time the control well mouth pressure is prevented blowout.Avoid the crude stream environment pollution of becoming estranged, avoid casualties, improve the safety of operation field, reduce economic loss and protection environment.
The present technique solution can reach above-mentioned purpose: a kind of oil water well hydraulic blowout control device, comprise hydraulic locking mechanism and blockage mechanism, and the outer suit hydraulic locking mechanism of blockage mechanism is sleeved on this device on the well head clip head.
The beneficial effects of the utility model are: this apparatus structure is simple, low cost of manufacture, and is quick and easy for installation.When having fluid to gush out in the well, can effectively control and prevent blowout, avoid the crude stream casualties of becoming estranged, safe.Owing to can in time rob spray, avoided the crude oil loss also to protect environment, have tangible economic benefit and social benefit.
Description of drawings
Accompanying drawing is a structural representation of the present utility model.
The specific embodiment
Below in conjunction with embodiment the utility model is done further detailed description: referring to accompanying drawing, a kind of oil water well hydraulic blowout control device comprises hydraulic locking mechanism and blockage mechanism, and the outer suit hydraulic locking mechanism of blockage mechanism is sleeved on this device on the well head clip head 1.Blockage mechanism comprises blockage body 6, piston component 8 and plug 11, and piston component 8 is installed in the blockage body 6, and plug 11 is installed in the top of piston component 8.The bottom cylindrical of blockage body 6 has screw thread to be connected with hydraulic locking mechanism.Circle is provided with interior platform in blockage body 6 bottoms, and the platform lower surface is provided with the lock dog groove within it, and lock dog is installed.This lock dog is connected and fixed the Nei Tai lower surface of blockage body 6 and the upper surface of well head clip head 1.Blockage body 6 lower case are provided with lock ball by the hole, and central enclosure is provided with open flow outlet opening 7, and this open flow outlet opening 7 is arranged on the interior platform top of circle in blockage body 6 bottoms.Blockage body 6 upper body are provided with stop screw hole and pressure transmission mouth, and stop screw is installed in the stop screw hole, at the pressure transmission mouth liquid inlet joint 10 are installed.Retaining spray plate 9 is installed in the top of the open flow outlet opening 7 of blockage body 6, and its effect is to prevent liquid stream direct projection injury operator.Piston component 8 comprises piston body and seal, and the bottom of piston body is taper, and its middle part piston body is provided with seal.Piston component 8 is installed in the below of blockage body 6 upper body pressure transmission mouths, and the stop screw that its upper piston body is provided with in axial notch and blockage body 6 upper body cooperates.Hydraulic locking mechanism comprises lock tube 4, pressure transmission cover 5, tapered sleeve 3 and lock ball 2, and lock ball 2 and tapered sleeve 3 are installed in the lock tube 4, on adorn pressure transmission cover 5.Tapered sleeve 3 is installed in the top of lock ball 2, and circle is the inner conical structure in the bottom of cone, is convenient to promote lock ball 2, and its top cone is provided with sealing ring.Pressure transmission cover 5 is provided with axially extending bore, on the top of its axially extending bore the hydraulic locking liquid inlet joint is installed.When oil-water well need be installed the utility model, the blockage body 6 of this device is set on the well head clip head 1 of oil, well.Well head clip head 1 is positioned at the flank of well head big four, and after the installation, this device is parallel to the ground.This device in the accompanying drawing is to place vertically, and parallel to the ground in actual the use.The interior liquid stream of well this moment flows out from well head clip head 1, discharges by the open flow outlet opening on the blockage body 67, and the pressure in the blockage body 6 can not raise.From the hydraulic locking liquid inlet joint pumping liquid of pressure transmission cover 5, promote tapered sleeve 3 and move ahead, tapered sleeve 3 promotes lock ball 2 and moves to the inside, enters the below of well head clip head 1 cylindrical boss, thereby the utility model and well head clip head 1 are fixed into one.And then from liquid inlet joint 10 pumping liquids, promote piston component 8 and move ahead, piston component 8 is entered stop up its passage in the well head clip head 1, thereby the sealing well head is in time prevented blowout.

Claims (8)

1, a kind of oil water well hydraulic blowout control device is characterized in that this device comprises hydraulic locking mechanism and blockage mechanism, and blockage mechanism is installed hydraulic locking mechanism outward, and this device is sleeved on the well head clip head (1).
2, a kind of oil water well hydraulic blowout control device according to claim 1, it is characterized in that blockage mechanism comprises blockage body (6), piston component (8) and plug (11), piston component (8) is installed in the blockage body (6), and plug (11) is installed in piston component (8) top; The bottom cylindrical of blockage body (6) has screw thread to be connected with hydraulic locking mechanism.
3, a kind of oil water well hydraulic blowout control device according to claim 2 is characterized in that circle is provided with interior platform in blockage body (6) bottom, and the Nei Tai lower surface is provided with the lock dog groove; Blockage body (6) lower case is provided with lock ball by the hole, and central enclosure is provided with open flow outlet opening (7) and retaining spray plate (9), and this open flow outlet opening (7) is arranged on the interior platform top of circle in blockage body (6) bottom; Blockage body (6) upper body is provided with stop screw hole and pressure transmission mouth, and stop screw is installed in the stop screw hole, and liquid inlet joint (10) is installed in the pressure transmission mouth; Retaining spray plate (9) is installed on the blockage body (6), is positioned at the top of open flow outlet opening (7).
4, a kind of oil water well hydraulic blowout control device according to claim 2 is characterized in that piston component (8) comprises piston body and seal, and the bottom of piston body is taper, and its middle part piston body is provided with seal.
5, according to claim 2 or 3 or 4 described a kind of oil water well hydraulic blowout control devices, it is characterized in that piston component (8) is installed in the below of blockage body (6) upper body pressure transmission mouth, its upper piston body is provided with axial notch and cooperates with the stop screw of blockage body (6) upper body.
6, a kind of oil water well hydraulic blowout control device according to claim 1, it is characterized in that hydraulic locking mechanism comprises lock tube (4), pressure transmission cover (5), tapered sleeve (3) and lock ball (2), lock ball (2) and tapered sleeve (3) are installed in the lock tube (4), on adorn pressure transmission cover (5).
7, a kind of oil water well hydraulic blowout control device according to claim 6 is characterized in that tapered sleeve (3) is installed in the top of lock ball (2), and its top cone is provided with sealing ring.
8, a kind of oil water well hydraulic blowout control device according to claim 6 is characterized in that pressure transmission cover (5) is provided with axially extending bore, on the top of its axially extending bore the hydraulic locking liquid inlet joint is installed.
CN 200620009687 2006-09-05 2006-09-05 Oil-water well hydraulic first-aid injection apparatus Expired - Fee Related CN200955372Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620009687 CN200955372Y (en) 2006-09-05 2006-09-05 Oil-water well hydraulic first-aid injection apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620009687 CN200955372Y (en) 2006-09-05 2006-09-05 Oil-water well hydraulic first-aid injection apparatus

Publications (1)

Publication Number Publication Date
CN200955372Y true CN200955372Y (en) 2007-10-03

Family

ID=38773956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620009687 Expired - Fee Related CN200955372Y (en) 2006-09-05 2006-09-05 Oil-water well hydraulic first-aid injection apparatus

Country Status (1)

Country Link
CN (1) CN200955372Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444390A (en) * 2010-10-11 2012-05-09 李相方 Emergency rescuing device for incontrollable blowout

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444390A (en) * 2010-10-11 2012-05-09 李相方 Emergency rescuing device for incontrollable blowout

Similar Documents

Publication Publication Date Title
CN203394437U (en) Automatic pressure relief and pressure test valve of underground pipe column of oil-water well
CN104975818A (en) Equipment and process method for pulling and dropping oil pipe
CN200955372Y (en) Oil-water well hydraulic first-aid injection apparatus
CN104213863B (en) Water injection well oil jacket plugging device
CN200955373Y (en) Oil-water well first-aid injection apparatus
CN106639957A (en) Double-acting swabbing blowout preventer
CN201306119Y (en) Pressurized petroleum wellhead driller
CN209603919U (en) Not termination of pumping negative pressure sand washing auto Isolator Well Head
CN203161152U (en) Sucker rod self-sealing preventer
CN200978648Y (en) Combined type oil line plugging device
CN102619482A (en) Quick-mounting device for oil pipe plug valve
CN104005728A (en) Well sealer for controllable well
CN102767345A (en) Multifunctional sucker rod hanging blowout preventer
CN204024568U (en) Water injection well oil jacket plugging device
CN204041006U (en) Hydraulic pressure well bore isolation valve
CN202788729U (en) Multifunctional sucker rod hanging blowout preventer
CN209195323U (en) The well mouth protector of recyclable kill-job
CN203285414U (en) Large-drift-diameter wellhead suitable for continuous oil pipe fracturing
CN102162344B (en) Blowout prevention box for pumping steel wire rope
CN202578615U (en) Annular pressure monitoring sealing device for geological drilling
CN109025885A (en) The well mouth protector of recyclable kill-job
CN206617128U (en) A kind of plug
CN205036340U (en) Sucker rod antifouling blowout preventer that goes into well
CN204371229U (en) Downhole safety valve for oil field
CN204663452U (en) Totally-enclosed blowout preventer borehole apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee